US 10537061
System and method for controlling harvest operations
Granted 2020-01-21 · Filed 2010-02-26 · Application 12/713,996 · Utility · Kind B2 · Prior publication US 2011/0213531 A1, 2011-09-01
- Assignee as printed
- CNH Industrial America LLC, New Holland, PA (US)
- Inventors
- Herbert M. Farley, Elizabethtown, PA (US); Justin R. Ringwald, Ellinwood, KS (US); Ryan C. Benning, Austin, MN (US); Jay D. Schroeder, Coal Valley, IL (US)
- CPC, current
- A01D41/1275; G06Q10/06; G06Q50/02
Abstract
A system and method for monitoring and coordinating harvest operations is disclosed. The system and method includes a control system to real time monitor the grain capacity of one or more harvesters to optimize harvest operations. The control system may also monitor harvest and offload vehicle positions and provide instructions for optimizing harvest operations.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A method for monitoring and coordinating harvest operations comprising:
- Claim 1, element e1determining real time fill levels of one or more grain bins of one or more corresponding harvesters using a computer in communication with one or more grain flow sensors, 75–244
- Claim 1, element e2wherein the computer includes a microprocessor and a computer program product embodied on a computer readable medium executable to determine a harvest operation offload value for optimizing offloading operations of the one or more grain bins during harvesting operations within a field; 246–531
- Claim 1, element e3determining real time fill rates of the one or more grain bins of the one or more corresponding harvesters using the computer; 533–658
- Claim 1, element e4updating a site database with the determined real time fill levels and real time fill rates; and 660–751
- Claim 1, element e5determining the offload value for the one or more harvesters using the computer in communication with the site database based upon at least one of the real time fill levels and real time fill rates of at least one other vehicle in the updated site database.757–1013
7 dependent claims: 2 to 8 (2, 3, 4, 6, 8 on claim 1; 5 on 4; 7 on 6)
Claim 2
Depends on claim 1.
2. The method of claim 1 , wherein
- Claim 2, element e1the offload value for the one or more harvesters comprises an amount of time for the one or more harvesters to reach a predetermined harvester grain bin capacity.35–196
Claim 3
Depends on claim 1.
3. The method of claim 1 , wherein
- Claim 3, element e1the offload value for the one or more harvesters comprises a distance for the one or more harvesters to harvest to reach a predetermined harvester grain bin capacity.35–200
Claim 4
Depends on claim 1.
4. The method of claim 1 , further comprising:
- Claim 4, element e1updating the site database with an operational map; and 47–97
- Claim 4, element e2providing real time position data for the one or more harvesters to the site database; 103–188
- Claim 4, element e3wherein the offload value for the one or more harvesters comprising an offload location position where the one or more harvesters reach a predetermined harvest grain bin capacity.190–368
Claim 5
Depends on claim 4.
5. The method of claim 4 , wherein
- Claim 5, element e1the real time position data is generated by a global positioning system.35–106
Claim 6
Depends on claim 1.
6. The method of claim 1 , wherein
- Claim 6, element e1the computer is further configured to: 35–72
- Claim 6, element e2provide real time position data for one or more offload vehicles.74–138
Claim 7
Depends on claim 6.
7. The method of claim 6 , further comprising:
- Claim 7, element e1plotting an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offload operation.47–177
Claim 8
Depends on claim 1.
8. The method of claim 1 , wherein
- Claim 8, element e1the computer is further configured to provide real time position data for one or more offload vehicles, and further comprising the steps of: 35–174
- Claim 8, element e2storing predetermined data in the site database, 176–223
- Claim 8, element e3wherein the predetermined data includes at least one of a grain bin capacity of the one or more harvesters, a capacity of one or more offload vehicles, and an amount of grain to be harvested; 225–415
- Claim 8, element e4determining second and third offload values for the one or more harvesters using the computer in communication with the site database, 417–550
- Claim 8, element e5wherein the offload value comprises an amount of time for the one or more harvesters to reach a predetermined grain bin capacity, 552–680
- Claim 8, element e6wherein the second offload value comprises the distance for one or more harvesters to harvest to reach the predetermined harvester grain bin capacity, and wherein the third offload value comprises an offload location position where one or more harvesters reach the predetermined harvest grain bin capacity, 682–987
- Claim 8, element e7wherein the offload value is further based upon the predetermined data, 989–1059
- Claim 8, element e8wherein the second and third offload values are each based upon the predetermined data; 1061–1147
- Claim 8, element e9plotting an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offloading operation; and 1149–1282
- Claim 8, element e10displaying operational data on a display system of the one or more harvesters or the one or more offload vehicles.1288–1401
Claim 9
Independent claim.
9. A harvest system, comprising:
- Claim 9, element e1one or more harvesters comprising one or more corresponding control systems, the one or more control systems comprising: 33–152
- Claim 9, element e2a grain capacity monitoring system to determine one or more corresponding real time harvest amounts, the grain capacity monitoring system including a plurality of contact sensors for determining fill levels of grain; and 154–369
- Claim 9, element e3one or more offload vehicles; 375–403
- Claim 9, element e4wherein the control system is configured to determine real time fill levels of one or more grain bins of one or more corresponding harvesters, determine real time fill rates of the one or more grain bins of the one or more corresponding harvesters; 405–652
- Claim 9, element e5determine real time fill rates of the one or more offload vehicles; 654–720
- Claim 9, element e6update a site database with the real time fill levels and the real time fill rates of the one or more grain bins of the one or more corresponding harvesters and the one or more offload vehicles, determine an offload value for the one or more harvesters to reach a predetermined harvester grain bin capacity based upon at least one of the determined real time fill levels and fill rates of at least one other vehicle in the updated site database, and receive an alert based on a real time fill level of grain reaching one of the plurality of contact sensors.722–1278
6 dependent claims: 10 to 15 (10, 13, 14, 15 on claim 9; 11 on 10; 12 on 11)
Claim 10
Depends on claim 9.
10. The system of claim 9 , wherein
- Claim 10, element e1the control system is further configured to determine the offload value further comprising an amount of time for the one or more harvesters to reach the predetermined harvester grain bin capacity, or a distance for one or more harvesters to harvest to reach the predetermined harvester grain bin capacity.36–340
Claim 11
Depends on claim 10.
11. The system of claim 10 , wherein
- Claim 11, element e1the one or more offload vehicles comprises at least one individual control system for providing real time position data for the one or more offload vehicles to the control system.37–215
Claim 12
Depends on claim 11.
12. The system of claim 11 , wherein
- Claim 12, element e1the control system is further configured to plot an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offload operation.37–207
Claim 13
Depends on claim 9.
13. The system of claim 9 , wherein
- Claim 13, element e1the control system is further configured to update a site database with an operational map, and provide real time position data for one or more harvesters to the site database; and 36–211
- Claim 13, element e2wherein the offload value comprises an offload location position where one or more harvesters reach the predetermined harvest grain bin capacity.217–361
Claim 14
Depends on claim 9.
14. The system of claim 9 , wherein
- Claim 14, element e1the plurality of contact sensors are positioned within various locations of the grain bin to determine variations in an initial level of grain within the grain bin.36–199
Claim 15
Depends on claim 9.
15. The system of claim 9 , wherein
- Claim 15, element e1the control system is configured to determine variations in an initial level of grain within the grain bin via the plurality of control sensors.36–179
Claim 16
Independent claim.
16. A control system for harvest operations, comprising
- Claim 16, element e1a grain capacity monitoring system to determine real time harvest amounts comprising real time fill levels and real time fill rates of corresponding harvester grain storage bins from one or more harvesters and one or more offload vehicles, a database configured to receive the real time harvest amounts from the one or more harvesters and the one or more offload vehicles; and 56–427
- Claim 16, element e2a microprocessor; 433–449
- Claim 16, element e3wherein the microprocessor comprises a computer program product embodied on a computer readable medium, the microprocessor configured to access the database and to execute the computer program product to generate harvest operations data based on the real time harvest amounts; 451–726
- Claim 16, element e4wherein the harvest operations data comprises a harvest offload pattern for the corresponding harvester grain storage bins including which harvester to offload first, a period of time for offloading a harvester before proceeding to another harvester based on one of a position of the one or more offload vehicles, a remaining harvester grain storage bin capacity, and a remaining offload vehicle capacity, and an offload value comprising an amount of time for the harvester grain storage bins to reach one or more corresponding predetermined harvester grain storage bin capacities and a distance for the one or more harvesters to harvest to reach the one or more corresponding predetermined harvester grain storage bin capacities.728–1457
4 dependent claims: 17 to 20 (17 on claim 16; 18, 19 on 17; 20 on 19)
Claim 17
Depends on claim 16.
17. The control system of claim 16 , further comprising:
- Claim 17, element e1one or more global positioning systems for determining the corresponding locations of the harvesters and providing the locations of the harvesters to the database.57–219
Claim 18
Depends on claim 17.
18. The control system of claim 17 , wherein
- Claim 18, element e1the harvest operations data includes an offload location position where the harvesters reach a predetermined harvest grain storage bin capacity.45–188
Claim 19
Depends on claim 17.
19. The control system of claim 17 , further comprising:
- Claim 19, element e1one or more additional global positioning systems for determining the corresponding locations of one or more offload vehicles and providing the locations of the one or more offload vehicles to the database.57–262
Claim 20
Depends on claim 19.
20. The control system of claim 19 , wherein
- Claim 20, element e1the generated harvest operations data further comprises an optimal travel path for the one or more offload vehicle to intersect with the harvesters for offload operations.45–215
1. A method for monitoring and coordinating harvest operations comprising: determining real time fill levels of one or more grain bins of one or more corresponding harvesters using a computer in communication with one or more grain flow sensors, wherein the computer includes a microprocessor and a computer program product embodied on a computer readable medium executable to determine a harvest operation offload value for optimizing offloading operations of the one or more grain bins during harvesting operations within a field; determining real time fill rates of the one or more grain bins of the one or more corresponding harvesters using the computer; updating a site database with the determined real time fill levels and real time fill rates; and determining the offload value for the one or more harvesters using the computer in communication with the site database based upon at least one of the real time fill levels and real time fill rates of at least one other vehicle in the updated site database.
2. The method of claim 1 , wherein the offload value for the one or more harvesters comprises an amount of time for the one or more harvesters to reach a predetermined harvester grain bin capacity.
3. The method of claim 1 , wherein the offload value for the one or more harvesters comprises a distance for the one or more harvesters to harvest to reach a predetermined harvester grain bin capacity.
4. The method of claim 1 , further comprising: updating the site database with an operational map; and providing real time position data for the one or more harvesters to the site database; wherein the offload value for the one or more harvesters comprising an offload location position where the one or more harvesters reach a predetermined harvest grain bin capacity.
5. The method of claim 4 , wherein the real time position data is generated by a global positioning system.
6. The method of claim 1 , wherein the computer is further configured to: provide real time position data for one or more offload vehicles.
7. The method of claim 6 , further comprising: plotting an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offload operation.
8. The method of claim 1 , wherein the computer is further configured to provide real time position data for one or more offload vehicles, and further comprising the steps of: storing predetermined data in the site database, wherein the predetermined data includes at least one of a grain bin capacity of the one or more harvesters, a capacity of one or more offload vehicles, and an amount of grain to be harvested; determining second and third offload values for the one or more harvesters using the computer in communication with the site database, wherein the offload value comprises an amount of time for the one or more harvesters to reach a predetermined grain bin capacity, wherein the second offload value comprises the distance for one or more harvesters to harvest to reach the predetermined harvester grain bin capacity, and wherein the third offload value comprises an offload location position where one or more harvesters reach the predetermined harvest grain bin capacity, wherein the offload value is further based upon the predetermined data, wherein the second and third offload values are each based upon the predetermined data; plotting an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offloading operation; and displaying operational data on a display system of the one or more harvesters or the one or more offload vehicles.
9. A harvest system, comprising: one or more harvesters comprising one or more corresponding control systems, the one or more control systems comprising: a grain capacity monitoring system to determine one or more corresponding real time harvest amounts, the grain capacity monitoring system including a plurality of contact sensors for determining fill levels of grain; and one or more offload vehicles; wherein the control system is configured to determine real time fill levels of one or more grain bins of one or more corresponding harvesters, determine real time fill rates of the one or more grain bins of the one or more corresponding harvesters; determine real time fill rates of the one or more offload vehicles; update a site database with the real time fill levels and the real time fill rates of the one or more grain bins of the one or more corresponding harvesters and the one or more offload vehicles, determine an offload value for the one or more harvesters to reach a predetermined harvester grain bin capacity based upon at least one of the determined real time fill levels and fill rates of at least one other vehicle in the updated site database, and receive an alert based on a real time fill level of grain reaching one of the plurality of contact sensors.
10. The system of claim 9 , wherein the control system is further configured to determine the offload value further comprising an amount of time for the one or more harvesters to reach the predetermined harvester grain bin capacity, or a distance for one or more harvesters to harvest to reach the predetermined harvester grain bin capacity.
11. The system of claim 10 , wherein the one or more offload vehicles comprises at least one individual control system for providing real time position data for the one or more offload vehicles to the control system.
12. The system of claim 11 , wherein the control system is further configured to plot an optimal travel path for one or more offload vehicles to intersect with one or more harvesters for an offload operation.
13. The system of claim 9 , wherein the control system is further configured to update a site database with an operational map, and provide real time position data for one or more harvesters to the site database; and wherein the offload value comprises an offload location position where one or more harvesters reach the predetermined harvest grain bin capacity.
14. The system of claim 9 , wherein the plurality of contact sensors are positioned within various locations of the grain bin to determine variations in an initial level of grain within the grain bin.
15. The system of claim 9 , wherein the control system is configured to determine variations in an initial level of grain within the grain bin via the plurality of control sensors.
16. A control system for harvest operations, comprising a grain capacity monitoring system to determine real time harvest amounts comprising real time fill levels and real time fill rates of corresponding harvester grain storage bins from one or more harvesters and one or more offload vehicles, a database configured to receive the real time harvest amounts from the one or more harvesters and the one or more offload vehicles; and a microprocessor; wherein the microprocessor comprises a computer program product embodied on a computer readable medium, the microprocessor configured to access the database and to execute the computer program product to generate harvest operations data based on the real time harvest amounts; wherein the harvest operations data comprises a harvest offload pattern for the corresponding harvester grain storage bins including which harvester to offload first, a period of time for offloading a harvester before proceeding to another harvester based on one of a position of the one or more offload vehicles, a remaining harvester grain storage bin capacity, and a remaining offload vehicle capacity, and an offload value comprising an amount of time for the harvester grain storage bins to reach one or more corresponding predetermined harvester grain storage bin capacities and a distance for the one or more harvesters to harvest to reach the one or more corresponding predetermined harvester grain storage bin capacities.
17. The control system of claim 16 , further comprising: one or more global positioning systems for determining the corresponding locations of the harvesters and providing the locations of the harvesters to the database.
18. The control system of claim 17 , wherein the harvest operations data includes an offload location position where the harvesters reach a predetermined harvest grain storage bin capacity.
19. The control system of claim 17 , further comprising: one or more additional global positioning systems for determining the corresponding locations of one or more offload vehicles and providing the locations of the one or more offload vehicles to the database.
20. The control system of claim 19 , wherein the generated harvest operations data further comprises an optimal travel path for the one or more offload vehicle to intersect with the harvesters for offload operations.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 10537061 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2033-03-12 (20 years from filing, plus 1110 days of patent term adjustment), a date not yet passed (data version 20261117.2).
- Basis
- term_20y · pta_days:1110 (20 years from filing, plus 1110 days of patent term adjustment)
- Term end
- 2033-03-12 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 12 US patent documents · Cited by: 73 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10537061/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 10537061 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| EP | 2538764 | A1 | 2013-01-02 |
| EP | 2538764 | B1 | 2017-09-20 |
| RU | 2012141014 | A | 2014-04-10 |
| RU | 2531004 | C2 | 2014-10-20 |
| WO | 2011104085 | A1 | 2011-09-01 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "10537061",
"status": "active",
"basis": [
"term_20y",
"pta_days:1110"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2033-03-12",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/10537061?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/10537061?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/10537061/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=10537061",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/10537061/ - Status record
/api/v1/lapse/status/10537061/ - Claim tree
/api/v1/structure/claims/10537061/ - Brief
/api/v1/structure/brief/10537061/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.