US 10618427
Behind-the-meter branch loads for electrical vehicle charging
Granted 2020-04-14 · Filed 2019-10-08 · Application 16/596,190 · Utility · Kind B1
- Assignee as printed
- Lancium LLC, Houston, TX (US) · PatentsView label: LANCIUM LLC
- Inventors
- Michael T. McNamara, Newport Beach, CA (US); Raymond E. Cline, Jr., Houston, TX (US)
- CPC, current
- B60L53/53; B60L53/60; B60L53/50; B60L53/63; B60L53/67; B60L53/68; G05B15/02; Y02E60/00; Y02T10/70; Y02T10/7072; Y02T90/12; Y02T90/16; Y02T90/167; Y04S10/126; Y04S30/12
Abstract
Examples relate to flexible datacenters or other power loads tolerant of intermittent operation and configured to use power received behind-the-meter. A system may include a transportation hub electrically coupled to a BTM power source via a branch line. The transportation hub may receive behind-the-meter (“BTM”) power from the BTM power source. The system may also include a datacenter control system configured to modulate power delivery to the transportation hub based on a set of monitored conditions. The set of monitored conditions may include BTM power availability at the transportation hub. In some examples, the datacenter control system is a remote master control system positioned remotely from the transportation hub.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A system comprising:
- Claim 1, element e1a transportation hub electrically coupled to a BTM power source via a branch line, 24–105
- Claim 1, element e2wherein the transportation hub includes an electrical vehicle charging station and an energy storage system, 107–214
- Claim 1, element e3wherein the energy storage system includes one or more batteries that are configured to obtain and store behind-the-meter (“BTM”) power from the BTM power source; and 216–377
- Claim 1, element e4a datacenter control system configured to modulate power delivery to the transportation hub based on a set of monitored conditions, 383–513
- Claim 1, element e5wherein the set of monitored conditions includes BTM power availability at the transportation hub, a quantity of energy stored at the energy storage system, and a quantity of vehicles located within a threshold distance from the electrical vehicle charging station.515–779
13 dependent claims: 2 to 14 (2, 3, 4, 5, 6, 7, 8, 9, 11, 12 on claim 1; 10 on 9; 13, 14 on 12)
Claim 2
Depends on claim 1.
2. The system of claim 1 , wherein
- Claim 2, element e1the BTM power source comprises a generation station configured to generate utility-scale electrical power for supply to an electrical grid.35–173
Claim 3
Depends on claim 1.
3. The system of claim 1 , wherein
- Claim 3, element e1the transportation hub is electrically connected to a generation station at a location behind a Point of Interconnection between the generation station and an electrical grid.35–209
Claim 4
Depends on claim 1.
4. The system of claim 1 , wherein
- Claim 4, element e1the BTM power received by the transportation hub is electrical power produced by a generation station and transmitted to the transportation hub behind the generation station's Point of Interconnection with an electrical grid.35–259
Claim 5
Depends on claim 1.
5. The system of claim 1 , wherein
- Claim 5, element e1the transportation hub is electrically connected to a generation station that is subject to metering by one or more utility-scale generation-side meter that measure power supplied from the generation station to an electrical grid, and wherein the BTM power received by the transportation hub has not passed through the one or more utility-scale generation-side meters.35–402
Claim 6
Depends on claim 1.
6. The system of claim 1 , wherein
- Claim 6, element e1the power received by the transportation hub is received from a generation station that is subject to metering by one or more utility-scale generation-side meters, and wherein the BTM power received by the transportation hub is not metered by the one or more utility-scale generation-side meters.35–330
Claim 7
Depends on claim 1.
7. The system of claim 1 , wherein
- Claim 7, element e1the transportation hub is electrically connected to a generation station that supplies utility-scale power to a grid, 35–151
- Claim 7, element e2wherein power received from the grid is subject to Transmission and/or Distribution charges, and wherein the BTM power received by the transportation hub from the generation station is not subject to Transmission and/or Distribution charges.153–393
Claim 8
Depends on claim 1.
8. The system of claim 1 , wherein
- Claim 8, element e1the set of monitored conditions further comprises: 35–84
- Claim 8, element e2a first price associated with supplying BTM power to the transportation hub versus a second price associated with supplying power to an electrical grid.86–237
Claim 9
Depends on claim 1.
9. The system of claim 1 , wherein
- Claim 9, element e1the datacenter control system is a remote master control system positioned remotely from the transportation hub, and wherein the remote master control system communicates with a communication interface of the transportation hub.35–262
Claim 10
Depends on claim 9.
10. The system of claim 9 , wherein
- Claim 10, element e1the transportation hub further comprises: 36–76
- Claim 10, element e2a power interface configured to electrically engage or disengage the transportation hub from the BTM power source, 78–191
- Claim 10, element e3wherein the power interface electrically engages or disengages the transportation hub from the BTM power source based on instructions from the remote master control system.193–364
Claim 11
Depends on claim 1.
11. The system of claim 1 , wherein
- Claim 11, element e1a length of the branch line positions the transportation hub within a threshold distance of the BTM power source.36–148
Claim 12
Depends on claim 1.
12. The system of claim 1 , further comprising:
- Claim 12, element e1a second transportation hub electrically coupled to the BTM power source, 48–120
- Claim 12, element e2wherein the second transportation hub receives behind-the-meter (“BTM”) power from the BTM power source.122–225
Claim 13
Depends on claim 12.
13. The system of claim 12 , wherein
- Claim 13, element e1the second transportation hub is electrically coupled to the BTM power source via the branch line.37–134
Claim 14
Depends on claim 12.
14. The system of claim 12 , wherein
- Claim 14, element e1the datacenter control system is further configured to modulate power delivery to the transportation hub and the second transportation hub based on the set of monitored conditions, and wherein the set of monitored conditions includes a comparison of available energy stored at the transportation hub versus available energy stored at the second transportation hub.37–400
Claim 15
Independent claim.
15. A method comprising:
- Claim 15, element e1monitoring, by a datacenter control system, a set of conditions, 25–88
- Claim 15, element e2wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and 90–679
- Claim 15, element e3modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions.685–812
10 dependent claims: 16 to 25 (16, 17, 18, 19, 20, 21, 22 on claim 15; 23, 24, 25 on 22)
Claim 16
Depends on claim 15.
16. The method of claim 15 , wherein
- Claim 16, element e1the BTM power source comprises a generation station configured to generate utility-scale electrical power for supply to an electrical grid.37–175
Claim 17
Depends on claim 15.
17. The method of claim 15 , wherein
- Claim 17, element e1the transportation hub is electrically connected to a generation station at a location behind a Point of Interconnection between the generation station and an electrical grid.37–211
Claim 18
Depends on claim 15.
18. The method of claim 15 , wherein
- Claim 18, element e1the BTM power received by the transportation hub is electrical power produced by a generation station and transmitted to the transportation hub behind the generation station's Point of Interconnection with an electrical grid.37–261
Claim 19
Depends on claim 15.
19. The method of claim 15 , wherein
- Claim 19, element e1the transportation hub is electrically connected to a generation station that is subject to metering by one or more utility-scale generation-side meter that measure power supplied from the generation station to an electrical grid, 37–266
- Claim 19, element e2wherein the BTM power received by the transportation hub has not passed through the one or more utility-scale generation-side meters.268–400
Claim 20
Depends on claim 15.
20. The method of claim 15 , wherein
- Claim 20, element e1power received by the transportation hub is received from a generation station that is subject to metering by one or more utility-scale generation-side meters, and wherein the BTM power received by the transportation hub is not metered by the one or more utility-scale generation-side meters.37–328
Claim 21
Depends on claim 15.
21. The method of claim 15 , wherein
- Claim 21, element e1the transportation hub is electrically connected to a generation station that supplies utility-scale power to a grid, 37–153
- Claim 21, element e2wherein power received from the grid is subject to Transmission and/or Distribution charges, and wherein the BTM power received by the transportation hub from the generation station is not subject to Transmission and/or Distribution charges.155–395
Claim 22
Depends on claim 15.
22. The method of claim 15 , wherein
- Claim 22, element e1the transportation hub comprises: 37–69
- Claim 22, element e2an electrical vehicle charging station; 71–109
- Claim 22, element e3a power interface configured to electrically engage or disengage the transportation hub from the BTM power source; and 111–224
- Claim 22, element e4an energy storage having one or more batteries; and 230–276
- Claim 22, element e5wherein monitoring the set of conditions comprises: 282–332
- Claim 22, element e6monitoring a quantity of energy stored in the energy storage.334–394
Claim 23
Depends on claim 22.
23. The method of claim 22 , wherein
- Claim 23, element e1monitoring the quantity of energy stored in the energy storage comprises: 37–109
- Claim 23, element e2determining that the quantity of energy stored in the energy storage is below a threshold quantity; 111–209
- Claim 23, element e3determining that BTM power is available for delivery to the transportation hub; and 211–289
- Claim 23, element e4wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: 295–440
- Claim 23, element e5causing the power interface to electrically engage the transportation hub to the BTM power source to enable power delivery to the energy storage based on determining that the quantity of energy stored in the energy storage is below the threshold quantity and determining that BTM power is available for delivery to the transportation hub.442–779
Claim 24
Depends on claim 22.
24. The method of claim 22 , wherein
- Claim 24, element e1monitoring the quantity of energy stored in the energy storage comprises: 37–109
- Claim 24, element e2determining that the quantity of energy stored in the energy storage is above a threshold quantity; and 111–209
- Claim 24, element e3wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: 215–360
- Claim 24, element e4causing the power interface to electrically disengage the transportation hub from the BTM power source to disable power delivery to the energy storage based on determining that the quantity of energy stored in the energy storage is above the threshold quantity.362–622
Claim 25
Depends on claim 22.
25. The method of claim 22 , wherein
- Claim 25, element e1monitoring the quantity of energy stored in the energy storage comprises: 37–109
- Claim 25, element e2determining that BTM power is not available for delivery to the transportation hub; and 111–193
- Claim 25, element e3wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: 199–344
- Claim 25, element e4causing the power interface to electrically disengage the transportation hub from the BTM power source to disable power delivery to the energy storage based on determining that the BTM power is not available for delivery to the transportation hub.346–592
Claim 26
Independent claim.
26. A non-transitory computer-readable medium configured to store instructions, that when executed by a computing system, causes the computing system to perform functions comprising:
- Claim 26, element e1monitoring a set of conditions, 183–213
- Claim 26, element e2wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and 215–804
- Claim 26, element e3modulating power delivery to the transportation hub based on the set of monitored conditions.810–902
Claim 26 (this number appears more than once in the data)
Independent claim.
26. A non-transitory computer-readable medium configured to store instructions, that when executed by a computing system, causes the computing system to perform functions comprising:
- Claim 26, element e1monitoring a set of conditions, 183–213
- Claim 26, element e2wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and 215–804
- Claim 26, element e3modulating power delivery to the transportation hub based on the set of monitored conditions.810–902
1. A system comprising: a transportation hub electrically coupled to a BTM power source via a branch line, wherein the transportation hub includes an electrical vehicle charging station and an energy storage system, wherein the energy storage system includes one or more batteries that are configured to obtain and store behind-the-meter (“BTM”) power from the BTM power source; and a datacenter control system configured to modulate power delivery to the transportation hub based on a set of monitored conditions, wherein the set of monitored conditions includes BTM power availability at the transportation hub, a quantity of energy stored at the energy storage system, and a quantity of vehicles located within a threshold distance from the electrical vehicle charging station.
2. The system of claim 1 , wherein the BTM power source comprises a generation station configured to generate utility-scale electrical power for supply to an electrical grid.
3. The system of claim 1 , wherein the transportation hub is electrically connected to a generation station at a location behind a Point of Interconnection between the generation station and an electrical grid.
4. The system of claim 1 , wherein the BTM power received by the transportation hub is electrical power produced by a generation station and transmitted to the transportation hub behind the generation station's Point of Interconnection with an electrical grid.
5. The system of claim 1 , wherein the transportation hub is electrically connected to a generation station that is subject to metering by one or more utility-scale generation-side meter that measure power supplied from the generation station to an electrical grid, and wherein the BTM power received by the transportation hub has not passed through the one or more utility-scale generation-side meters.
6. The system of claim 1 , wherein the power received by the transportation hub is received from a generation station that is subject to metering by one or more utility-scale generation-side meters, and wherein the BTM power received by the transportation hub is not metered by the one or more utility-scale generation-side meters.
7. The system of claim 1 , wherein the transportation hub is electrically connected to a generation station that supplies utility-scale power to a grid, wherein power received from the grid is subject to Transmission and/or Distribution charges, and wherein the BTM power received by the transportation hub from the generation station is not subject to Transmission and/or Distribution charges.
8. The system of claim 1 , wherein the set of monitored conditions further comprises: a first price associated with supplying BTM power to the transportation hub versus a second price associated with supplying power to an electrical grid.
9. The system of claim 1 , wherein the datacenter control system is a remote master control system positioned remotely from the transportation hub, and wherein the remote master control system communicates with a communication interface of the transportation hub.
10. The system of claim 9 , wherein the transportation hub further comprises: a power interface configured to electrically engage or disengage the transportation hub from the BTM power source, wherein the power interface electrically engages or disengages the transportation hub from the BTM power source based on instructions from the remote master control system.
11. The system of claim 1 , wherein a length of the branch line positions the transportation hub within a threshold distance of the BTM power source.
12. The system of claim 1 , further comprising: a second transportation hub electrically coupled to the BTM power source, wherein the second transportation hub receives behind-the-meter (“BTM”) power from the BTM power source.
13. The system of claim 12 , wherein the second transportation hub is electrically coupled to the BTM power source via the branch line.
14. The system of claim 12 , wherein the datacenter control system is further configured to modulate power delivery to the transportation hub and the second transportation hub based on the set of monitored conditions, and wherein the set of monitored conditions includes a comparison of available energy stored at the transportation hub versus available energy stored at the second transportation hub.
15. A method comprising: monitoring, by a datacenter control system, a set of conditions, wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions.
16. The method of claim 15 , wherein the BTM power source comprises a generation station configured to generate utility-scale electrical power for supply to an electrical grid.
17. The method of claim 15 , wherein the transportation hub is electrically connected to a generation station at a location behind a Point of Interconnection between the generation station and an electrical grid.
18. The method of claim 15 , wherein the BTM power received by the transportation hub is electrical power produced by a generation station and transmitted to the transportation hub behind the generation station's Point of Interconnection with an electrical grid.
19. The method of claim 15 , wherein the transportation hub is electrically connected to a generation station that is subject to metering by one or more utility-scale generation-side meter that measure power supplied from the generation station to an electrical grid, wherein the BTM power received by the transportation hub has not passed through the one or more utility-scale generation-side meters.
20. The method of claim 15 , wherein power received by the transportation hub is received from a generation station that is subject to metering by one or more utility-scale generation-side meters, and wherein the BTM power received by the transportation hub is not metered by the one or more utility-scale generation-side meters.
21. The method of claim 15 , wherein the transportation hub is electrically connected to a generation station that supplies utility-scale power to a grid, wherein power received from the grid is subject to Transmission and/or Distribution charges, and wherein the BTM power received by the transportation hub from the generation station is not subject to Transmission and/or Distribution charges.
22. The method of claim 15 , wherein the transportation hub comprises: an electrical vehicle charging station; a power interface configured to electrically engage or disengage the transportation hub from the BTM power source; and an energy storage having one or more batteries; and wherein monitoring the set of conditions comprises: monitoring a quantity of energy stored in the energy storage.
23. The method of claim 22 , wherein monitoring the quantity of energy stored in the energy storage comprises: determining that the quantity of energy stored in the energy storage is below a threshold quantity; determining that BTM power is available for delivery to the transportation hub; and wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: causing the power interface to electrically engage the transportation hub to the BTM power source to enable power delivery to the energy storage based on determining that the quantity of energy stored in the energy storage is below the threshold quantity and determining that BTM power is available for delivery to the transportation hub.
24. The method of claim 22 , wherein monitoring the quantity of energy stored in the energy storage comprises: determining that the quantity of energy stored in the energy storage is above a threshold quantity; and wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: causing the power interface to electrically disengage the transportation hub from the BTM power source to disable power delivery to the energy storage based on determining that the quantity of energy stored in the energy storage is above the threshold quantity.
25. The method of claim 22 , wherein monitoring the quantity of energy stored in the energy storage comprises: determining that BTM power is not available for delivery to the transportation hub; and wherein modulating, by the datacenter control system, power delivery to the transportation hub based on the set of monitored conditions comprises: causing the power interface to electrically disengage the transportation hub from the BTM power source to disable power delivery to the energy storage based on determining that the BTM power is not available for delivery to the transportation hub.
26. A non-transitory computer-readable medium configured to store instructions, that when executed by a computing system, causes the computing system to perform functions comprising: monitoring a set of conditions, wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and modulating power delivery to the transportation hub based on the set of monitored conditions.
26. A non-transitory computer-readable medium configured to store instructions, that when executed by a computing system, causes the computing system to perform functions comprising: monitoring a set of conditions, wherein the set of conditions includes behind-the-meter (“BTM”) power availability at a transportation hub, a quantity of energy stored at an energy system located at the transportation hub, and a quantity of vehicles located within a threshold distance from an electrical vehicle charging station located at the transportation hub, and wherein the transportation hub is electrically coupled to a BTM power source via a branchline such that one or more batteries associated with the electrical vehicle charging station are configured to obtain and store BTM power from the BTM power source; and modulating power delivery to the transportation hub based on the set of monitored conditions.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 10618427 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2039-10-08 (20 years from filing), a date not yet passed (data version 20261117.2).
- Basis
- term_20y (20 years from filing)
- Term end
- 2039-10-08 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 30 US patent documents · Cited by: 48 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10618427/ (needs a free key, as the links under Get this as data)
Family outside the US
Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "10618427",
"status": "active",
"basis": [
"term_20y"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2039-10-08",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/10618427?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/10618427?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/10618427/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=10618427",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/10618427/ - Status record
/api/v1/lapse/status/10618427/ - Claim tree
/api/v1/structure/claims/10618427/ - Brief
/api/v1/structure/brief/10618427/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.