US 10706375
Central plant with asset allocator
Granted 2020-07-07 · Filed 2017-03-29 · Application 15/473,496 · Utility · Kind B2 · Prior publication US 2018/0285800 A1, 2018-10-04
- Assignee as printed
- Johnson Controls Technology Company, Auburn Hills, MI (US)
- Inventors
- Michael J. Wenzel, Grafton, WI (US); Matthew J. Ellis, Milwaukee, WI (US)
- CPC, current
- G06Q10/06313; G05B13/021; G06Q10/0631; G06Q50/06; H02J3/00; H02J3/008; H02J3/14; H02J3/28; H02J3/32; H02J3/38; H02J2103/30; H02J2203/20; H02J2310/12; Y02B70/3225; Y02E60/00; Y04S20/222; Y04S40/20; Y04S50/10
Abstract
A central plant includes an asset allocator configured to determine an optimal allocation of energy loads across central plant equipment. The asset allocator identifies sources configured to supply input resources, subplants configured to convert the input resources to output resources, and sinks configured to consume the output resources. The asset allocator generates a cost function and a resource balance constraint. The resource balance constraint requires balance between a total amount of each resource supplied by the sources and the subplants and a total amount of each resource consumed by the subplants and the sinks. The asset allocator determines the optimal allocation of the energy loads across the central plant equipment by optimizing the cost function subject to the resource balance constraint. The asset allocator is configured to control the central plant equipment to achieve the optimal allocation of the energy loads.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A central plant configured to serve energy loads of a building or campus, the central plant comprising:
- Claim 1, element e1central plant equipment configured to consume input resources from one or more utilities to produce output resources provided to the building or campus; and 107–258
- Claim 1, element e2a central plant controller configured to determine an optimal allocation of the energy loads across the central plant equipment by: 264–394
- Claim 1, element e3identifying one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources; 396–623
- Claim 1, element e4generating a cost function comprising a cost of purchasing the input resources from the sources; 625–720
- Claim 1, element e5generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, 722–861
- Claim 1, element e6wherein: 863–870
- Claim 1, element e7the first amount of each resource comprises a sum of a total amount of the resource supplied by the sources and a total amount of the resource supplied by the subplants; and 872–1040
- Claim 1, element e8the second amount of each resource comprises a sum of a total amount of the resource consumed by the subplants and a total amount of the resource consumed by the sinks; and 1046–1213
- Claim 1, element e9solving an optimization problem to determine the optimal allocation of the energy loads across the central plant equipment, 1219–1341
- Claim 1, element e10wherein solving the optimization problem comprises optimizing the cost function subject to the resource balance constraint; 1343–1465
- Claim 1, element e11wherein the central plant controller is configured to provide control decisions to a building management system configured to control the central plant equipment to achieve the optimal allocation of the energy loads.1467–1682
11 dependent claims: 2 to 12 (2, 3, 7, 8, 10, 12 on claim 1; 4, 5, 6 on 3; 9 on 8; 11 on 10)
Claim 2
Depends on claim 1.
2. The central plant of claim 1 , wherein:
- Claim 2, element e1each of the sources represents one of the utilities; 43–94
- Claim 2, element e2each of the subplants represents a subset of the central plant equipment; and 96–168
- Claim 2, element e3each of the sinks represents one of the energy loads of the building or campus.174–252
Claim 3
Depends on claim 1.
3. The central plant of claim 1 , further comprising
- Claim 3, element e1storage equipment configured to store and discharge one or more of the resources, the storage equipment comprising at least one of thermal energy storage or electrical energy storage.53–235
Claim 4
Depends on claim 3.
4. The central plant of claim 3 , wherein:
- Claim 4, element e1the central plant controller is configured to define one or more storage elements configured to store and discharge one or more of the resources; and 43–187
- Claim 4, element e2the resource balance constraint requires balance between: 193–249
- Claim 4, element e3a total amount of each resource supplied by the sources, supplied by the subplants and discharged by the storage elements; and 251–372
- Claim 4, element e4a total amount of each resource consumed by the subplants, consumed by the sinks, and charged by the storage elements.378–495
Claim 5
Depends on claim 3.
5. The central plant of claim 3 , wherein
- Claim 5, element e1the central plant controller is configured to add one or more continuous decision variables to the cost function for each resource stored or discharged by each of the storage equipment.42–226
Claim 6
Depends on claim 3.
6. The central plant of claim 3 , wherein
- Claim 6, element e1the central plant controller is configured to: 42–87
- Claim 6, element e2identify an operational domain for the storage equipment; and 89–145
- Claim 6, element e3add one or more constraints to the optimization problem, 151–206
- Claim 6, element e4wherein the constraints depend on the identified operational domain and comprise at least one of: 208–304
- Claim 6, element e5a constraint linking decision variables adjacent in time; and 306–362
- Claim 6, element e6a constraint linking a state-of-charge of the storage equipment to a charge or discharge rate of the storage equipment.368–486
Claim 7
Depends on claim 1.
7. The central plant of claim 1 , wherein
- Claim 7, element e1the cost function further comprises revenue generated by using the central plant equipment to participate in an incentive program, the revenue subtracting from the cost of purchasing the input resources from the sources.42–261
Claim 8
Depends on claim 1.
8. The central plant of claim 1 , wherein
- Claim 8, element e1the central plant controller is configured to: 42–87
- Claim 8, element e2generate connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and 89–410
- Claim 8, element e3use the connections to generate one or more terms of the resource balance constraint.416–500
Claim 9
Depends on claim 8.
9. The central plant of claim 8 , wherein
- Claim 9, element e1the central plant controller is configured to: 42–87
- Claim 9, element e2determine at least one of a distribution cost or an efficiency associated with each of the connections, each distribution cost defining a cost of transporting a resource along one of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and 89–396
- Claim 9, element e3modify at least one of the cost function to include the distribution costs or the resource balance constraint to account for the resource losses.402–546
Claim 10
Depends on claim 1.
10. The central plant of claim 1 , wherein
- Claim 10, element e1the central plant controller is configured to add one or more continuous decision variables to the cost function for each resource produced or consumed by each of the identified subplants.43–230
Claim 11
Depends on claim 10.
11. The central plant of claim 10 , wherein
- Claim 11, element e1the central plant controller is configured to: 44–89
- Claim 11, element e2identify an operational domain for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant; 91–312
- Claim 11, element e3add one or more integer decision variables to the cost function in response to the operational domain having multiple convex regions; and 314–446
- Claim 11, element e4add constraints linking the continuous decision variables to the integer decision variables to force the central plant controller to choose values of resources consumed and produced that exist only in the operational domain when solving the optimization problem.452–713
Claim 12
Depends on claim 1.
12. The central plant of claim 1 , wherein
- Claim 12, element e1the central plant controller is configured to add one or more decision variables to the cost function for each of the identified sources and each of the identified sinks.43–212
Claim 13
Independent claim.
13. A method for optimally allocating energy loads of a building or campus across central plant equipment configured to serve the energy loads, the method comprising:
- Claim 13, element e1identifying one or more sources configured to supply input resources, one or more subplants configured to convert the input resources to output resources, and one or more sinks configured to consume the output resources; 167–386
- Claim 13, element e2generating a cost function comprising a cost of purchasing the input resources from the sources; 388–483
- Claim 13, element e3generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, 485–624
- Claim 13, element e4wherein: 626–633
- Claim 13, element e5the first amount of each resource comprises a sum of a total amount of the resource supplied by the sources and a total amount of the resource supplied by the subplants; and 635–803
- Claim 13, element e6the second amount of each resource comprises a sum of a total amount of the resource consumed by the subplants and a total amount of the resource consumed by the sinks; 809–976
- Claim 13, element e7solving an optimization problem to determine an optimal allocation of the energy loads across the central plant equipment, 978–1099
- Claim 13, element e8wherein solving the optimization problem comprises optimizing the cost function subject to the resource balance constraint; and 1101–1223
- Claim 13, element e9providing control decisions to a building management system configured to control the central plant equipment to achieve the optimal allocation of the energy loads.1229–1392
7 dependent claims: 14 to 20 (14, 15, 17, 18, 20 on claim 13; 16 on 15; 19 on 18)
Claim 14
Depends on claim 13.
14. The method of claim 13 , wherein:
- Claim 14, element e1each of the sources represents a utility; 38–78
- Claim 14, element e2each of the subplants represents a subset of the central plant equipment; and 80–152
- Claim 14, element e3each of the sinks represents one of the energy loads of the building or campus.158–236
Claim 15
Depends on claim 13.
15. The method of claim 13 , further comprising
- Claim 15, element e1using storage equipment to store and discharge one or more of the resources, the storage equipment comprising at least one of thermal energy storage or electrical energy storage.48–225
Claim 16
Depends on claim 15.
16. The method of claim 15 , further comprising
- Claim 16, element e1defining one or more storage elements configured to store and discharge one or more of the resources; 48–148
- Claim 16, element e2wherein the resource balance constraint requires balance between: 150–214
- Claim 16, element e3a total amount of each resource supplied by the sources, supplied by the subplants and discharged by the storage elements; and 216–337
- Claim 16, element e4a total amount of each resource consumed by the subplants, consumed by the sinks, and charged by the storage elements.343–460
Claim 17
Depends on claim 13.
17. The method of claim 13 , wherein
- Claim 17, element e1the cost function further comprises revenue generated by using the central plant equipment to participate in an incentive program, the revenue subtracting from the cost of purchasing the input resources from the sources.37–256
Claim 18
Depends on claim 13.
18. The method of claim 13 , further comprising:
- Claim 18, element e1generating connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and 49–372
- Claim 18, element e2using the connections to generate one or more terms of the resource balance constraint.378–464
Claim 19
Depends on claim 18.
19. The method of claim 18 , further comprising:
- Claim 19, element e1determining at least one of a distribution cost or an efficiency associated with each of the connections, each distribution cost defining a cost of transporting a resource along one of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and 49–358
- Claim 19, element e2modifying at least one of the cost function to include the distribution costs or the resource balance constraint to account for the resource losses.364–511
Claim 20
Depends on claim 13.
20. The method of claim 13 , further comprising:
- Claim 20, element e1identifying an operational domain for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant; and 49–273
- Claim 20, element e2using the operational domains to generate additional constraints on the optimization problem.279–371
1. A central plant configured to serve energy loads of a building or campus, the central plant comprising: central plant equipment configured to consume input resources from one or more utilities to produce output resources provided to the building or campus; and a central plant controller configured to determine an optimal allocation of the energy loads across the central plant equipment by: identifying one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources; generating a cost function comprising a cost of purchasing the input resources from the sources; generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, wherein: the first amount of each resource comprises a sum of a total amount of the resource supplied by the sources and a total amount of the resource supplied by the subplants; and the second amount of each resource comprises a sum of a total amount of the resource consumed by the subplants and a total amount of the resource consumed by the sinks; and solving an optimization problem to determine the optimal allocation of the energy loads across the central plant equipment, wherein solving the optimization problem comprises optimizing the cost function subject to the resource balance constraint; wherein the central plant controller is configured to provide control decisions to a building management system configured to control the central plant equipment to achieve the optimal allocation of the energy loads.
2. The central plant of claim 1 , wherein: each of the sources represents one of the utilities; each of the subplants represents a subset of the central plant equipment; and each of the sinks represents one of the energy loads of the building or campus.
3. The central plant of claim 1 , further comprising storage equipment configured to store and discharge one or more of the resources, the storage equipment comprising at least one of thermal energy storage or electrical energy storage.
4. The central plant of claim 3 , wherein: the central plant controller is configured to define one or more storage elements configured to store and discharge one or more of the resources; and the resource balance constraint requires balance between: a total amount of each resource supplied by the sources, supplied by the subplants and discharged by the storage elements; and a total amount of each resource consumed by the subplants, consumed by the sinks, and charged by the storage elements.
5. The central plant of claim 3 , wherein the central plant controller is configured to add one or more continuous decision variables to the cost function for each resource stored or discharged by each of the storage equipment.
6. The central plant of claim 3 , wherein the central plant controller is configured to: identify an operational domain for the storage equipment; and add one or more constraints to the optimization problem, wherein the constraints depend on the identified operational domain and comprise at least one of: a constraint linking decision variables adjacent in time; and a constraint linking a state-of-charge of the storage equipment to a charge or discharge rate of the storage equipment.
7. The central plant of claim 1 , wherein the cost function further comprises revenue generated by using the central plant equipment to participate in an incentive program, the revenue subtracting from the cost of purchasing the input resources from the sources.
8. The central plant of claim 1 , wherein the central plant controller is configured to: generate connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and use the connections to generate one or more terms of the resource balance constraint.
9. The central plant of claim 8 , wherein the central plant controller is configured to: determine at least one of a distribution cost or an efficiency associated with each of the connections, each distribution cost defining a cost of transporting a resource along one of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and modify at least one of the cost function to include the distribution costs or the resource balance constraint to account for the resource losses.
10. The central plant of claim 1 , wherein the central plant controller is configured to add one or more continuous decision variables to the cost function for each resource produced or consumed by each of the identified subplants.
11. The central plant of claim 10 , wherein the central plant controller is configured to: identify an operational domain for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant; add one or more integer decision variables to the cost function in response to the operational domain having multiple convex regions; and add constraints linking the continuous decision variables to the integer decision variables to force the central plant controller to choose values of resources consumed and produced that exist only in the operational domain when solving the optimization problem.
12. The central plant of claim 1 , wherein the central plant controller is configured to add one or more decision variables to the cost function for each of the identified sources and each of the identified sinks.
13. A method for optimally allocating energy loads of a building or campus across central plant equipment configured to serve the energy loads, the method comprising: identifying one or more sources configured to supply input resources, one or more subplants configured to convert the input resources to output resources, and one or more sinks configured to consume the output resources; generating a cost function comprising a cost of purchasing the input resources from the sources; generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, wherein: the first amount of each resource comprises a sum of a total amount of the resource supplied by the sources and a total amount of the resource supplied by the subplants; and the second amount of each resource comprises a sum of a total amount of the resource consumed by the subplants and a total amount of the resource consumed by the sinks; solving an optimization problem to determine an optimal allocation of the energy loads across the central plant equipment, wherein solving the optimization problem comprises optimizing the cost function subject to the resource balance constraint; and providing control decisions to a building management system configured to control the central plant equipment to achieve the optimal allocation of the energy loads.
14. The method of claim 13 , wherein: each of the sources represents a utility; each of the subplants represents a subset of the central plant equipment; and each of the sinks represents one of the energy loads of the building or campus.
15. The method of claim 13 , further comprising using storage equipment to store and discharge one or more of the resources, the storage equipment comprising at least one of thermal energy storage or electrical energy storage.
16. The method of claim 15 , further comprising defining one or more storage elements configured to store and discharge one or more of the resources; wherein the resource balance constraint requires balance between: a total amount of each resource supplied by the sources, supplied by the subplants and discharged by the storage elements; and a total amount of each resource consumed by the subplants, consumed by the sinks, and charged by the storage elements.
17. The method of claim 13 , wherein the cost function further comprises revenue generated by using the central plant equipment to participate in an incentive program, the revenue subtracting from the cost of purchasing the input resources from the sources.
18. The method of claim 13 , further comprising: generating connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and using the connections to generate one or more terms of the resource balance constraint.
19. The method of claim 18 , further comprising: determining at least one of a distribution cost or an efficiency associated with each of the connections, each distribution cost defining a cost of transporting a resource along one of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and modifying at least one of the cost function to include the distribution costs or the resource balance constraint to account for the resource losses.
20. The method of claim 13 , further comprising: identifying an operational domain for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant; and using the operational domains to generate additional constraints on the optimization problem.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 10706375 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-05-04 (20 years from filing, plus 401 days of patent term adjustment), a date not yet passed (data version 20261117.2).
- Basis
- term_20y · pta_days:401 (20 years from filing, plus 401 days of patent term adjustment)
- Term end
- 2038-05-04 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 8 US patent documents · Cited by: 45 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10706375/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 10706375 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| EP | 3602716 | A1 | 2020-02-05 |
| EP | 3602716 | B1 | 2024-06-12 |
| WO | 2018182933 | A1 | 2018-10-04 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "10706375",
"status": "active",
"basis": [
"term_20y",
"pta_days:401"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2038-05-04",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/10706375?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/10706375?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/10706375/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=10706375",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/10706375/ - Status record
/api/v1/lapse/status/10706375/ - Claim tree
/api/v1/structure/claims/10706375/ - Brief
/api/v1/structure/brief/10706375/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.