US 10756816
Optimized fibre channel and non-volatile memory express access
Granted 2020-08-25 · Filed 2019-03-29 · Application 16/370,527 · Utility · Kind B1
- Assignee as printed
- Pure Storage, Inc., Mountain View, CA (US) · PatentsView label: PURE STORAGE, INC.
- Inventors
- Roland Dreier, Mountain View, CA (US)
- CPC, current
- H04B10/25; G06F3/0604; G06F3/061; G06F3/0635; G06F3/0659; G06F3/067; G06F3/0679; G06F3/0688; G06F9/545; G06F9/546; G06F13/38; H04L49/357; G06F2213/0026; G06F2213/0036
Abstract
A storage controller includes a plurality of submission queues corresponding to an initiator device and a processing device, the processing device to receive a Fibre Channel Protocol (FCP) command from the initiator device and send the FCP command to a first submission queue of the plurality of submission queues, the first submission queue being reserved for use by a kernel space of the storage controller. The processing device further to receive a Non-Volatile Memory Express over Fibre Channel (NVMe/FC) command from the initiator device. The processing device further to send the NVMe/FC command to a second submission queue of the plurality of submission queues without routing the NVMe/FC command through the kernel space, the second submission queue being reserved for direct access by the initiator device to a user space of the storage controller.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A system comprising:
- Claim 1, element e1a storage controller comprising a plurality of submission queues corresponding to an initiator device and a processing device, the processing device to: 24–175
- Claim 1, element e2send a Fibre Channel Protocol (FCP) command to a first submission queue of the plurality of submission queues, the first submission queue being reserved for use by a kernel space of the storage controller; and 177–381
- Claim 1, element e3send a Non-Volatile Memory Express over Fibre Channel (NVMe/FC) command to a second submission queue of the plurality of submission queues without routing the NVMe/FC command through the kernel space, the second submission queue being reserved for direct access by the initiator device to a user space of the storage controller.387–714
5 dependent claims: 2 to 6 (2, 4, 5, 6 on claim 1; 3 on 2)
Claim 2
Depends on claim 1.
2. The system of claim 1 , wherein
- Claim 2, element e1the processing device is to instruct a Fibre Channel Host Bus Adapter (FC HBA) of the storage controller to route the FCP command to the first submission queue and the NVMe/FC command to the second submission queue.35–249
Claim 3
Depends on claim 2.
3. The system of claim 2 , wherein
- Claim 3, element e1the FCP command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the NVMe/FC command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.35–325
Claim 4
Depends on claim 1.
4. The system of claim 1 , wherein
- Claim 4, element e1the first submission queue and the second submission queue are to communicate concurrently with the initiator device.35–151
Claim 5
Depends on claim 1.
5. The system of claim 1 , the processing device further to: receive a new NVMe/FC command from the initiator device, wherein
- Claim 5, element e1the new NVMe/FC command is to be routed through the kernel space; and 126–190
- Claim 5, element e2send the new NVMe/FC command to a third submission queue of the plurality of submission queues.196–290
Claim 6
Depends on claim 1.
6. The system of claim 1 , wherein
- Claim 6, element e1the FCP command is to be routed through an FCP stack in the kernel space and wherein the NVMe/FC command is to be routed through an NVMe/FC stack in the user space.35–198
Claim 7
Independent claim.
7. A method comprising:
- Claim 7, element e1sending, by a processing device, a first command to a first submission queue of a plurality of submission queues, the first submission queue being reserved for use by a kernel space of a storage controller; and 24–229
- Claim 7, element e2sending, by the processing device, a second command to a second submission queue of the plurality of submission queues without routing the second command through the kernel space, the second submission queue being reserved for direct access by an initiator device to a user space of the storage controller.235–540
6 dependent claims: 8 to 13 (8, 10, 11, 13 on claim 7; 9 on 8; 12 on 10)
Claim 8
Depends on claim 7.
8. The method of claim 7 , wherein
- Claim 8, element e1the first command corresponds to a first communication protocol and wherein the second command corresponds to a second communication protocol.35–176
Claim 9
Depends on claim 8.
9. The method of claim 8 , wherein
- Claim 9, element e1the first communication protocol corresponds to Fibre Channel Protocol (FCP) and wherein the second communication protocol corresponds to Non-Volatile Memory Express over Fibre Channel (NVMe/FC).35–229
Claim 10
Depends on claim 7.
10. The method of claim 7 , further comprising
- Claim 10, element e1instructing a Fibre Channel Host Bus Adapter (FC HBA) to route the first command to the first submission queue and the second command to the second submission queue.47–211
Claim 11
Depends on claim 7.
11. The method of claim 7 , wherein
- Claim 11, element e1the first submission queue and the second submission queue are to communicate concurrently with the initiator device.36–152
Claim 12
Depends on claim 10.
12. The method of claim 10 , wherein
- Claim 12, element e1the first command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the second command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.37–328
Claim 13
Depends on claim 7.
13. The method of claim 7 , wherein
- Claim 13, element e1the first command is to be routed through an FCP stack in the kernel space and wherein the second command is to be routed through an NVMe/FC stack in the user space.36–200
Claim 14
Independent claim.
14. A non-transitory computer readable storage medium storing instructions, which when executed, cause a processing device to: send, by the processing device, a first command to a first submission queue of a plurality of submission queues, the first submission queue being reserved for use by a kernel space of a storage controller; and send, by the processing device, a second command to a second submission queue of the plurality of submission queues without routing the second command through the kernel space, the second submission queue being reserved for direct access by an initiator device to a user space of the storage controller.
6 dependent claims: 15 to 20 (15, 17, 18, 20 on claim 14; 16 on 15; 19 on 17)
Claim 15
Depends on claim 14.
15. The non-transitory computer readable storage medium of claim 14 , wherein
- Claim 15, element e1the first command corresponds to a first communication protocol and wherein the second command corresponds to a second communication protocol.78–219
Claim 16
Depends on claim 15.
16. The non-transitory computer readable storage medium of claim 15 , wherein
- Claim 16, element e1the first communication protocol corresponds to Fibre Channel Protocol (FCP) and wherein the second communication protocol corresponds to Non-Volatile Memory Express over Fibre Channel (NVMe/FC).78–272
Claim 17
Depends on claim 14.
17. The non-transitory computer readable storage medium of claim 14 , wherein
- Claim 17, element e1the processing device is further to instruct a Fibre Channel Host Bus Adapter (FC HBA) to route the first command to the first submission queue and the second command to the second submission queue.78–275
Claim 18
Depends on claim 14.
18. The non-transitory computer readable storage medium of claim 14 , wherein
- Claim 18, element e1the first submission queue and the second submission queue are to communicate concurrently with the initiator device.78–194
Claim 19
Depends on claim 17.
19. The non-transitory computer readable storage medium of claim 17 , wherein
- Claim 19, element e1the first command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the second command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.78–369
Claim 20
Depends on claim 14.
20. The non-transitory computer readable storage medium of claim 14 , wherein
- Claim 20, element e1the first command is to be routed through an FCP stack in the kernel space and wherein the second command is to be routed through an NVMe/FC stack in the user space.78–242
1. A system comprising: a storage controller comprising a plurality of submission queues corresponding to an initiator device and a processing device, the processing device to: send a Fibre Channel Protocol (FCP) command to a first submission queue of the plurality of submission queues, the first submission queue being reserved for use by a kernel space of the storage controller; and send a Non-Volatile Memory Express over Fibre Channel (NVMe/FC) command to a second submission queue of the plurality of submission queues without routing the NVMe/FC command through the kernel space, the second submission queue being reserved for direct access by the initiator device to a user space of the storage controller.
2. The system of claim 1 , wherein the processing device is to instruct a Fibre Channel Host Bus Adapter (FC HBA) of the storage controller to route the FCP command to the first submission queue and the NVMe/FC command to the second submission queue.
3. The system of claim 2 , wherein the FCP command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the NVMe/FC command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.
4. The system of claim 1 , wherein the first submission queue and the second submission queue are to communicate concurrently with the initiator device.
5. The system of claim 1 , the processing device further to: receive a new NVMe/FC command from the initiator device, wherein the new NVMe/FC command is to be routed through the kernel space; and send the new NVMe/FC command to a third submission queue of the plurality of submission queues.
6. The system of claim 1 , wherein the FCP command is to be routed through an FCP stack in the kernel space and wherein the NVMe/FC command is to be routed through an NVMe/FC stack in the user space.
7. A method comprising: sending, by a processing device, a first command to a first submission queue of a plurality of submission queues, the first submission queue being reserved for use by a kernel space of a storage controller; and sending, by the processing device, a second command to a second submission queue of the plurality of submission queues without routing the second command through the kernel space, the second submission queue being reserved for direct access by an initiator device to a user space of the storage controller.
8. The method of claim 7 , wherein the first command corresponds to a first communication protocol and wherein the second command corresponds to a second communication protocol.
9. The method of claim 8 , wherein the first communication protocol corresponds to Fibre Channel Protocol (FCP) and wherein the second communication protocol corresponds to Non-Volatile Memory Express over Fibre Channel (NVMe/FC).
10. The method of claim 7 , further comprising instructing a Fibre Channel Host Bus Adapter (FC HBA) to route the first command to the first submission queue and the second command to the second submission queue.
11. The method of claim 7 , wherein the first submission queue and the second submission queue are to communicate concurrently with the initiator device.
12. The method of claim 10 , wherein the first command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the second command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.
13. The method of claim 7 , wherein the first command is to be routed through an FCP stack in the kernel space and wherein the second command is to be routed through an NVMe/FC stack in the user space.
14. A non-transitory computer readable storage medium storing instructions, which when executed, cause a processing device to: send, by the processing device, a first command to a first submission queue of a plurality of submission queues, the first submission queue being reserved for use by a kernel space of a storage controller; and send, by the processing device, a second command to a second submission queue of the plurality of submission queues without routing the second command through the kernel space, the second submission queue being reserved for direct access by an initiator device to a user space of the storage controller.
15. The non-transitory computer readable storage medium of claim 14 , wherein the first command corresponds to a first communication protocol and wherein the second command corresponds to a second communication protocol.
16. The non-transitory computer readable storage medium of claim 15 , wherein the first communication protocol corresponds to Fibre Channel Protocol (FCP) and wherein the second communication protocol corresponds to Non-Volatile Memory Express over Fibre Channel (NVMe/FC).
17. The non-transitory computer readable storage medium of claim 14 , wherein the processing device is further to instruct a Fibre Channel Host Bus Adapter (FC HBA) to route the first command to the first submission queue and the second command to the second submission queue.
18. The non-transitory computer readable storage medium of claim 14 , wherein the first submission queue and the second submission queue are to communicate concurrently with the initiator device.
19. The non-transitory computer readable storage medium of claim 17 , wherein the first command from the initiator device is received by the FC HBA via a Small Computer System Interface (SCSI) of the storage controller and wherein the second command is received by the FC HBA via a fiber-channel non-volatile memory express (FC NVMe) interface of the storage controller.
20. The non-transitory computer readable storage medium of claim 14 , wherein the first command is to be routed through an FCP stack in the kernel space and wherein the second command is to be routed through an NVMe/FC stack in the user space.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 10756816 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record, leaving out a terminal disclaimer it shows without a date, is 2037-01-26 (20 years from the filing of a parent application on 2017-01-26), a date not yet passed; that disclaimer can only make the term end earlier (data version 20261117.2).
- Basis
- term_20y · terminal_disclaimer (20 years from the filing of a parent application on 2017-01-26, a terminal disclaimer on record without a date, which can only make the term end earlier than the date computed from the other dates)
- Term end
- 2037-01-26 Computed from the dates in the USPTO recordThis date leaves out a terminal disclaimer on record that has no date; that disclaimer can only make the term end earlier.
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 48 US patent documents · Cited by: 52 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10756816/ (needs a free key, as the links under Get this as data)
Family outside the US
Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "10756816",
"status": "active",
"basis": [
"term_20y",
"terminal_disclaimer"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2037-01-26",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/10756816?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/10756816?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/10756816/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=10756816",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/10756816/ - Status record
/api/v1/lapse/status/10756816/ - Claim tree
/api/v1/structure/claims/10756816/ - Brief
/api/v1/structure/brief/10756816/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.