US 10841236
Distributed computer task management of interrelated network computing tasks
Granted 2020-11-17 · Filed 2018-03-30 · Application 15/941,654 · Utility · Kind B1
- Assignee as printed
- Electronic Arts Inc., Redwood City, CA (US)
- Inventors
- Yu Jin, Fremont, CA (US); Sundeep Narravula, Saratoga, CA (US); Navid Aghdaie, San Jose, CA (US); Kazi Atif-Uz Zaman, Foster City, CA (US); Preethi Ganeshan, Redwood City, CA (US); Tushar Agarwal, Redwood City, CA (US); Cong Feng, San Jose, CA (US); Drew John Zagieboylo, Ithaca, NY (US)
- CPC, current
- H04L43/0876; G06F9/5005; G06F9/5072; G06F9/5077; G06N20/00; G06N20/10; G06N20/20; H04L41/147; H04L41/149; H04L47/83; H04L67/10; H04L67/1008; H04L67/1014; H04L67/1023; G06F2209/5019; H04L41/145; H04L41/5019
Abstract
A system can manage distribution of computing jobs among a plurality of third-party network or cloud computing providers to maximize utilization of available computing resources purchased or otherwise obtained by an entity. The system can determine a dependency relationship between jobs and distribute the jobs among the network computing providers based at least in part on the dependency relationship between the jobs. Moreover, the system can use machine learning algorithms to generate one or more prediction algorithms to predict future computing resource usage demands for performing a set of scheduled and unscheduled jobs. Based at least in part on the resource prediction, the dependency relationship between jobs, service level agreements with network computing service providers, and job resource requirements, the system can determine an improved or optimal distribution of jobs among the network computing service providers that satisfies or best satisfies one or more objective functions to maximize resource utilization.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A computer-implemented method comprising:
- Claim 1, element e1as implemented by an interactive computing system configured with specific computer-executable instructions, receiving a plurality of job requests, the job requests corresponding to a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, 45–407
- Claim 1, element e2wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; 409–563
- Claim 1, element e3generating a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; 565–688
- Claim 1, element e4determining a predicted computer resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as inputs to a prediction model, 690–906
- Claim 1, element e5wherein the prediction model predicts computing resource usage to complete sets of jobs, 908–995
- Claim 1, element e6wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; 997–1310
- Claim 1, element e7determining a network resource allocation at the plurality of computing clusters based at least in part on the predicted computer resource usage; 1312–1456
- Claim 1, element e8allocating network computing resources at the plurality of computing clusters based at least in part on the network resource allocation determined based at least in part on the predicted computer resource usage; and 1458–1668
- Claim 1, element e9distributing the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated network computing resources, 1674–1847
- Claim 1, element e10wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.1849–2010
9 dependent claims: 2 to 10 (2, 3, 4, 5, 6, 7, 9, 10 on claim 1; 8 on 7)
Claim 2
Depends on claim 1.
2. The computer-implemented method of claim 1 , wherein
- Claim 2, element e1each of a plurality of data centers that host the plurality of computing clusters is associated with a different entity than the interactive computing system, and wherein at least one of the plurality of data centers is associated with a different entity than at least one other of the plurality of data centers.56–367
Claim 3
Depends on claim 1.
3. The computer-implemented method of claim 1 , wherein
- Claim 3, element e1the job dependency topology further indicates a dependency relationship between a first portion of a job of the plurality of jobs and a second portion of a job of the plurality of jobs.56–240
Claim 4
Depends on claim 1.
4. The computer-implemented method of claim 1 , wherein
- Claim 4, element e1the job dependency topology indicates that at least one job from the plurality of jobs is not dependent on another job from the plurality of jobs.56–201
Claim 5
Depends on claim 1.
5. The computer-implemented method of claim 1 , wherein
- Claim 5, element e1the job metadata comprises data relating to at least one of a job type, a job priority level, a job owner that requested the job, or a job due date.56–203
Claim 6
Depends on claim 1.
6. The computer-implemented method of claim 1 , further comprising
- Claim 6, element e1generating the prediction model based at least in part on a machine learning algorithm.67–153
Claim 7
Depends on claim 1.
7. The computer-implemented method of claim 1 , wherein
- Claim 7, element e1determining the network resource allocation comprises providing the predicted computer resource usage to an objective function that determines the network resource allocation based on an objective.56–252
Claim 8
Depends on claim 7.
8. The computer-implemented method of claim 7 , wherein
- Claim 8, element e1the objective comprises one or more of reducing processing time, reducing cost, increasing utilization of available computing resources, or satisfying a service level agreement.56–232
Claim 9
Depends on claim 1.
9. The computer-implemented method of claim 1 , further comprising
- Claim 9, element e1updating the job dependency topology based at least in part on the network resource allocation to identify network computing resources assigned to each job within the job dependency topology.67–257
Claim 10
Depends on claim 1.
10. The computer-implemented method of claim 1 , wherein
- Claim 10, element e1allocating the network computing resources at the plurality of computing clusters further comprises maintaining an unallocated portion of network computing resources available at the plurality of computing clusters to enable the processing of unscheduled jobs.57–316
Claim 11
Independent claim.
11. A system comprising:
- Claim 11, element e1an electronic data store system configured to store job dependency topologies; and 25–102
- Claim 11, element e2a computing task management system comprising one or more hardware processors, the computing task management system configured to execute specific computer-executable instructions to at least: 108–299
- Claim 11, element e3receive a plurality of job requests, the job requests corresponding to a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, 301–552
- Claim 11, element e4wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; 554–708
- Claim 11, element e5generate a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; 710–831
- Claim 11, element e6store the job dependency topology at the electronic data store; 833–895
- Claim 11, element e7determine a predicted computing resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as input to a prediction model, 897–1111
- Claim 11, element e8wherein the prediction model predicts computing resource usage to complete sets of jobs, 1113–1200
- Claim 11, element e9wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; 1202–1515
- Claim 11, element e10determine a computing resource allocation at the plurality of computing clusters based at least in part on the predicted computing resource usage; 1517–1662
- Claim 11, element e11allocate computing resources at the plurality of computing clusters based at least in part on the computing resource allocation determined based at least in part on the predicted computing resource usage; and 1664–1867
- Claim 11, element e12distribute the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated computing resources, 1873–2036
- Claim 11, element e13wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.2038–2199
4 dependent claims: 12 to 15 (12, 13, 14, 15 on claim 11)
Claim 12
Depends on claim 11.
12. The system of claim 11 , wherein
- Claim 12, element e1the dependency relationship between the two or more jobs comprises a dependency between a portion of a first job of the plurality of jobs and a portion of a second job of the plurality of jobs.37–229
Claim 13
Depends on claim 11.
13. The system of claim 11 , wherein
- Claim 13, element e1the computing task management system is further configured to generate the prediction model based at least in part on a machine learning algorithm.37–183
Claim 14
Depends on claim 11.
14. The system of claim 11 , wherein
- Claim 14, element e1the computing task management system is further configured to execute specific computer-executable instructions to at least determine the computing resource allocation using an objective function configured to maximize computing resource utilization of available computing resources at the plurality of computing clusters.37–358
Claim 15
Depends on claim 11.
15. The system of claim 11 , wherein
- Claim 15, element e1the computing task management system is further configured to execute specific computer-executable instructions to at least allocate a subset of the computing resources at the plurality of computing clusters to process one or more unscheduled jobs received separately from the plurality of job requests, and wherein the plurality of job requests comprise scheduled jobs.37–406
Claim 16
Independent claim.
16. A non-transitory computer-readable storage medium storing computer executable instructions that, when executed by one or more computing devices, configure the one or more computing devices to perform operations comprising:
- Claim 16, element e1receiving a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, 227–417
- Claim 16, element e2wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; 419–573
- Claim 16, element e3generating a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; 575–698
- Claim 16, element e4determining a predicted computing resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as input to a prediction model, 700–916
- Claim 16, element e5wherein the prediction model predicts computing resource usage to complete sets of jobs, 918–1005
- Claim 16, element e6wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; 1007–1320
- Claim 16, element e7determining a computing resource allocation at the plurality of computing clusters based at least in part on the predicted computing resource usage; 1322–1469
- Claim 16, element e8allocating computing resources at the plurality of computing clusters based at least in part on the computing resource allocation determined based at least in part on the predicted computing resource usage; and 1471–1676
- Claim 16, element e9distributing the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated computing resources, 1682–1847
- Claim 16, element e10wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.1849–2010
4 dependent claims: 17 to 20 (17, 18, 19, 20 on claim 16)
Claim 17
Depends on claim 16.
17. The non-transitory computer-readable storage medium of claim 16 , wherein
- Claim 17, element e1the job dependency topology further indicates a dependency relationship between a first portion of a job of the plurality of jobs and a second portion of the job of the plurality of jobs.78–264
Claim 18
Depends on claim 16.
18. The non-transitory computer-readable storage medium of claim 16 , further comprising
- Claim 18, element e1generating the prediction model based at least in part on an application of historical computing task data to a machine learning algorithm.89–227
Claim 19
Depends on claim 16.
19. The non-transitory computer-readable storage medium of claim 16 , wherein
- Claim 19, element e1the operations further comprise redistributing at least some of the plurality of jobs based at least in part on receiving a set of unscheduled jobs.78–225
Claim 20
Depends on claim 16.
20. The non-transitory computer-readable storage medium of claim 16 , wherein
- Claim 20, element e1the operations further comprise redistributing at least some of the plurality of jobs based at least in part on a change in availability of computing resources of at least one of the plurality of computing clusters.78–292
1. A computer-implemented method comprising: as implemented by an interactive computing system configured with specific computer-executable instructions, receiving a plurality of job requests, the job requests corresponding to a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; generating a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; determining a predicted computer resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as inputs to a prediction model, wherein the prediction model predicts computing resource usage to complete sets of jobs, wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; determining a network resource allocation at the plurality of computing clusters based at least in part on the predicted computer resource usage; allocating network computing resources at the plurality of computing clusters based at least in part on the network resource allocation determined based at least in part on the predicted computer resource usage; and distributing the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated network computing resources, wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.
2. The computer-implemented method of claim 1 , wherein each of a plurality of data centers that host the plurality of computing clusters is associated with a different entity than the interactive computing system, and wherein at least one of the plurality of data centers is associated with a different entity than at least one other of the plurality of data centers.
3. The computer-implemented method of claim 1 , wherein the job dependency topology further indicates a dependency relationship between a first portion of a job of the plurality of jobs and a second portion of a job of the plurality of jobs.
4. The computer-implemented method of claim 1 , wherein the job dependency topology indicates that at least one job from the plurality of jobs is not dependent on another job from the plurality of jobs.
5. The computer-implemented method of claim 1 , wherein the job metadata comprises data relating to at least one of a job type, a job priority level, a job owner that requested the job, or a job due date.
6. The computer-implemented method of claim 1 , further comprising generating the prediction model based at least in part on a machine learning algorithm.
7. The computer-implemented method of claim 1 , wherein determining the network resource allocation comprises providing the predicted computer resource usage to an objective function that determines the network resource allocation based on an objective.
8. The computer-implemented method of claim 7 , wherein the objective comprises one or more of reducing processing time, reducing cost, increasing utilization of available computing resources, or satisfying a service level agreement.
9. The computer-implemented method of claim 1 , further comprising updating the job dependency topology based at least in part on the network resource allocation to identify network computing resources assigned to each job within the job dependency topology.
10. The computer-implemented method of claim 1 , wherein allocating the network computing resources at the plurality of computing clusters further comprises maintaining an unallocated portion of network computing resources available at the plurality of computing clusters to enable the processing of unscheduled jobs.
11. A system comprising: an electronic data store system configured to store job dependency topologies; and a computing task management system comprising one or more hardware processors, the computing task management system configured to execute specific computer-executable instructions to at least: receive a plurality of job requests, the job requests corresponding to a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; generate a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; store the job dependency topology at the electronic data store; determine a predicted computing resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as input to a prediction model, wherein the prediction model predicts computing resource usage to complete sets of jobs, wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; determine a computing resource allocation at the plurality of computing clusters based at least in part on the predicted computing resource usage; allocate computing resources at the plurality of computing clusters based at least in part on the computing resource allocation determined based at least in part on the predicted computing resource usage; and distribute the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated computing resources, wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.
12. The system of claim 11 , wherein the dependency relationship between the two or more jobs comprises a dependency between a portion of a first job of the plurality of jobs and a portion of a second job of the plurality of jobs.
13. The system of claim 11 , wherein the computing task management system is further configured to generate the prediction model based at least in part on a machine learning algorithm.
14. The system of claim 11 , wherein the computing task management system is further configured to execute specific computer-executable instructions to at least determine the computing resource allocation using an objective function configured to maximize computing resource utilization of available computing resources at the plurality of computing clusters.
15. The system of claim 11 , wherein the computing task management system is further configured to execute specific computer-executable instructions to at least allocate a subset of the computing resources at the plurality of computing clusters to process one or more unscheduled jobs received separately from the plurality of job requests, and wherein the plurality of job requests comprise scheduled jobs.
16. A non-transitory computer-readable storage medium storing computer executable instructions that, when executed by one or more computing devices, configure the one or more computing devices to perform operations comprising: receiving a plurality of jobs to be performed at a plurality of computing clusters comprising one or more network computing systems, each computing cluster located at a different data center, wherein each of the one or more network computing systems provide computing resources that are capable of performing at least one of the plurality of jobs; generating a job dependency topology indicating a dependency relationship between two or more jobs of the plurality of jobs; determining a predicted computing resource usage to process the plurality of jobs by applying at least the job dependency topology and job metadata associated with the plurality of jobs as input to a prediction model, wherein the prediction model predicts computing resource usage to complete sets of jobs, wherein the prediction model is generated based at least in part on historical data relating to previously completed jobs, and wherein the prediction model comprises a set of weighted parameters that are combined to form the prediction model, the set of weighted parameters determined based on the historical data; determining a computing resource allocation at the plurality of computing clusters based at least in part on the predicted computing resource usage; allocating computing resources at the plurality of computing clusters based at least in part on the computing resource allocation determined based at least in part on the predicted computing resource usage; and distributing the plurality of jobs to the plurality of computing clusters based at least in part on the job dependency topology and the allocated computing resources, wherein at least one job is provided to a different computing cluster of the plurality of computing clusters than at least one other job of the plurality of jobs.
17. The non-transitory computer-readable storage medium of claim 16 , wherein the job dependency topology further indicates a dependency relationship between a first portion of a job of the plurality of jobs and a second portion of the job of the plurality of jobs.
18. The non-transitory computer-readable storage medium of claim 16 , further comprising generating the prediction model based at least in part on an application of historical computing task data to a machine learning algorithm.
19. The non-transitory computer-readable storage medium of claim 16 , wherein the operations further comprise redistributing at least some of the plurality of jobs based at least in part on receiving a set of unscheduled jobs.
20. The non-transitory computer-readable storage medium of claim 16 , wherein the operations further comprise redistributing at least some of the plurality of jobs based at least in part on a change in availability of computing resources of at least one of the plurality of computing clusters.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 10841236 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-07-16 (20 years from filing, plus 108 days of patent term adjustment), a date not yet passed (data version 20261117.2).
- Basis
- term_20y · pta_days:108 (20 years from filing, plus 108 days of patent term adjustment)
- Term end
- 2038-07-16 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 21 US patent documents · Cited by: 100 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10841236/ (needs a free key, as the links under Get this as data)
Family outside the US
Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "10841236",
"status": "active",
"basis": [
"term_20y",
"pta_days:108"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2038-07-16",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/10841236?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/10841236?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/10841236/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=10841236",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/10841236/ - Status record
/api/v1/lapse/status/10841236/ - Claim tree
/api/v1/structure/claims/10841236/ - Brief
/api/v1/structure/brief/10841236/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.