PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 10849180

Dynamic spectrum sharing in 4G and 5G

Granted 2020-11-24 · Filed 2018-12-04 · Application 16/209,688 · Utility · Kind B2 · Prior publication US 2020/0178334 A1, 2020-06-04

Assignee as printed
  • T-Mobile USA, Inc., Bellevue, WA (US)
Inventors
Yasmin Karimli, Kirkland, WA (US); Gunjan Nimbavikar, Bellevue, WA (US)
CPC, current
H04W16/14; H04W76/16; H04L5/0007; H04L5/0032; H04L5/0035; H04L5/0064; H04L5/0078; H04W28/0268; H04W28/0289; H04W48/06; H04W48/18; H04W72/0453; H04W88/06; H04W88/12

Abstract

Techniques for dynamically allocating frequency resources in accordance with wireless access technologies are discussed herein. For example, a base station can determine whether user equipment (UE) requesting communications at the base station are configured to operate in accordance with 4th Generation (5G) radio access technologies and/or in accordance with 5th Generation (5G) radio access technologies. Based on the number of 5G UEs and 4G UEs, a first portion of a frequency resource can be allocated to 5G and a second portion of the frequency resource can be allocated to 4G. In some examples, a first allocation strategy for a first frequency resource (e.g., Band 71) can be used to generate a second allocation strategy for a partially overlapping second frequency resource (e.g., Band 41).

Claims

17 claims · independent 1, 8 and 14

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A system comprising:

  1. Claim 1, element e1one or more processors; 24–46
  2. Claim 1, element e2a memory; and 48–56
  3. Claim 1, element e3one or more components stored in the memory and executable by the one or more processors to perform operations comprising: 62–183
  4. Claim 1, element e4receiving, from a first user equipment (UE), a first indication of a first communication request; 185–281
  5. Claim 1, element e5determining that the first UE is configured to communicate using a first radio access technology and a second radio access technology, 283–416
  6. Claim 1, element e6wherein the first radio access technology is a 5 th Generation (5G) radio access technology and wherein the second radio access technology is a 4 th Generation (4G) radio access technology; 418–606
  7. Claim 1, element e7determining a first number of a first plurality of UEs that are configured to communicate via the first radio access technology and the second radio access technology, 608–774
  8. Claim 1, element e8wherein the first UE is one of the first plurality of UEs; 776–833
  9. Claim 1, element e9receiving, from a second UE, a second indication of a second communication request; 835–917
  10. Claim 1, element e10determining that the second UE is configured to communicate via the second radio access technology and is not configured to communicate via the first radio access technology; 919–1092
  11. Claim 1, element e11determining a second number of a second plurality of UEs that are configured to communicate using the second radio access technology and not the first radio access technology, 1094–1268
  12. Claim 1, element e12wherein the second UE is one of the second plurality of UEs; 1270–1329
  13. Claim 1, element e13allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to a first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology; and 1331–1774
  14. Claim 1, element e14allocating, for the time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a third set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and a fourth set of frequency resources to the second base station configured to communicate in accordance with the second radio access technology, 1780–2229
  15. Claim 1, element e15wherein the first set of frequency resources and the second set of frequency resources are associated with a first frequency resource band, and wherein the third set of frequency resources and the fourth set of frequency resources are associated with a second frequency resource band.2231–2514
6 dependent claims: 2 to 7 (2, 3, 4, 5, 6, 7 on claim 1)

Claim 2

Depends on claim 1.

2. The system of claim 1 , wherein

  1. Claim 2, element e1the operations further comprise: 35–66
  2. Claim 2, element e2determining that the first communication request is associated with a non-guaranteed bit rate (GBR) communication type; and 68–186
  3. Claim 2, element e3determining that the second communication request is associated with the non-GBR communication type.192–291

Claim 3

Depends on claim 1.

3. The system of claim 1 , wherein

  1. Claim 3, element e1the second number of the second plurality of UEs is larger than the first number of the first plurality of UEs, and wherein the first set of frequency resources is larger than the second set of frequency resources.35–248

Claim 4

Depends on claim 1.

4. The system of claim 1 , wherein

  1. Claim 4, element e1the first frequency resource band comprises first frequency resources associated with a Long-Term Evolution (LTE) Band 71 or a 5G Band 71 and the second frequency resource band comprises second frequency resources associated with an LTE Band 41 or a 5G Band 41.35–295

Claim 5

Depends on claim 1.

5. The system of claim 1 , wherein

  1. Claim 5, element e1determining that the first UE is configured to communicate using the first radio access technology and the second radio access technology is based at least in part on an International Mobile Equipment Identity (IMEI) number associated with the first UE.35–287

Claim 6

Depends on claim 1.

6. The system of claim 1 , wherein

  1. Claim 6, element e1allocating the first set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and the second set of frequency resources to the second base station configured to communicate in accordance with the second radio access technology is based at least in part on an allocation model.35–385

Claim 7

Depends on claim 1.

7. The system of claim 1 , wherein

  1. Claim 7, element e1the operations further comprise: 35–66
  2. Claim 7, element e2receiving, from a third UE, a third indication of a third communication request; 68–147
  3. Claim 7, element e3determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology; 149–286
  4. Claim 7, element e4determining a congestion level associated with the first set of frequency resources; 288–371
  5. Claim 7, element e5determining that the congestion level is above a threshold congestion level; and 373–448
  6. Claim 7, element e6increasing a number of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.454–603

Claim 8

Independent claim.

8. A first base station comprising:

  1. Claim 8, element e1one or more processors; 36–58
  2. Claim 8, element e2a memory; and 60–68
  3. Claim 8, element e3one or more components stored in the memory and executable by the one or more processors to perform operations comprising: 74–195
  4. Claim 8, element e4receiving, from a first user equipment (UE), a first indication of a first communication request; 197–293
  5. Claim 8, element e5determining a first number of a first plurality of UEs that are configured to communicate using a first radio access technology and a second radio access technology, 295–459
  6. Claim 8, element e6wherein the first UE is one of the first plurality of UEs, and wherein the first plurality of UEs have requested a first plurality of communications associated with a non-guaranteed bit rate (GBR) communication type; 461–676
  7. Claim 8, element e7receiving, from a second UE, a second indication of a second communication request; 678–760
  8. Claim 8, element e8determining a second number of a second plurality of UEs that are configured to communicate using the first radio access technology and not the second radio access technology, 762–936
  9. Claim 8, element e9wherein the second UE is one of the second plurality of UEs, and wherein the second plurality of UEs have requested second communications associated with the non-GBR communication type; 938–1122
  10. Claim 8, element e10allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to the first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology; 1124–1569
  11. Claim 8, element e11receiving, from a third UE, a third indication of a third communication request; 1571–1650
  12. Claim 8, element e12determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology; 1652–1789
  13. Claim 8, element e13determining a congestion level associated with the first set of frequency resources; 1791–1874
  14. Claim 8, element e14determining that the congestion level is above a threshold congestion level; and 1876–1951
  15. Claim 8, element e15increasing a size of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.1957–2104
5 dependent claims: 9 to 13 (9, 10, 11 on claim 8; 12 on 11; 13 on 12)

Claim 9

Depends on claim 8.

9. The first base station of claim 8 , wherein

  1. Claim 9, element e1the first radio access technology is a 5 th Generation (5G) radio access technology and wherein the second radio access technology is a 4 th Generation (4G) radio access technology.47–227

Claim 10

Depends on claim 8.

10. The first base station of claim 8 , wherein

  1. Claim 10, element e1a first coverage area associated with the first base station partially overlaps a second coverage area associated with the second base station.48–190

Claim 11

Depends on claim 8.

11. The first base station of claim 8 , wherein

  1. Claim 11, element e1the first base station is a gNodeB configured in accordance with a 5 th Generation (5G) radio access technology, and wherein the first base station is configurable to communicate with frequency resources associated with a long-term evolution (LTE) Band 71 or a 5G Band 71, an LTE Band 41 or a 5G Band 41, and a Citizens Broadband Radio Service (CBRS).48–398

Claim 12

Depends on claim 11.

12. The first base station of claim 11 , wherein

  1. Claim 12, element e1the first set of frequency resources allocated to the first base station is a first allocation, 49–143
  2. Claim 12, element e2wherein the first set of frequency resources include at least a portion of first frequencies associated with the LTE Band 71 or the 5G Band 71, and wherein the operations further comprise: 145–332
  3. Claim 12, element e3allocating, for the time period, and based at least in part on the first allocation, a second allocation including a third set of frequency resources to the first base station, 334–509
  4. Claim 12, element e4wherein the third set of frequency resources include a portion of second frequencies associated with the LTE Band 41 or the 5G Band 41.511–645

Claim 13

Depends on claim 12.

13. The first base station of claim 12 , wherein

  1. Claim 13, element e1a first coverage area associated with the first set of frequency resources partially overlaps a second coverage area associated with the second set of frequency resources.49–219

Claim 14

Independent claim.

14. A method implemented by one or more processors, the method comprising:

  1. Claim 14, element e1receiving, from a first user equipment (UE), a first indication of a first communication request; 75–171
  2. Claim 14, element e2determining a first number of a first plurality of UEs that are configured to communicate using a first radio access technology and a second radio access technology, 173–337
  3. Claim 14, element e3wherein the first UE is one of the first plurality of UEs, and wherein the first plurality of UEs have requested a first plurality of communications associated with a non-guaranteed bit rate (GBR) communication type; 339–554
  4. Claim 14, element e4receiving, from a second UE, a second indication of a second communication request; 556–638
  5. Claim 14, element e5determining a second number of a second plurality of UEs that are configured to communicate using the first radio access technology and not the second radio access technology, 640–814
  6. Claim 14, element e6wherein the second UE is one of the second plurality of UEs, and wherein the second plurality of UEs have requested second communications associated with the non-GBR communication type; 816–1000
  7. Claim 14, element e7allocating, for a time period and based at least in part on the first number of the first plurality of UEs and the second number of the second plurality of UEs, a first set of frequency resources to a first base station configured to communicate in accordance with the first radio access technology and a second set of frequency resources to a second base station configured to communicate in accordance with the second radio access technology; 1002–1445
  8. Claim 14, element e8receiving, from a third UE, a third indication of a third communication request; 1447–1526
  9. Claim 14, element e9determining that the third UE is configured to communicate using the first radio access technology and the second radio access technology; 1528–1665
  10. Claim 14, element e10determining a congestion level associated with the first set of frequency resources; 1667–1750
  11. Claim 14, element e11determining that the congestion level is above a threshold congestion level; and 1752–1827
  12. Claim 14, element e12increasing a size of the first set of frequency resources based at least in part on the congestion level being above the threshold congestion level.1833–1980
3 dependent claims: 15 to 17 (15 on claim 14; 16 on 15; 17 on 16)

Claim 15

Depends on claim 14.

15. The method of claim 14 , wherein

  1. Claim 15, element e1the first base station is a gNodeB configured in accordance with a 5 th Generation (5G) radio access technology, and wherein the first base station is configurable to communicate with frequency resources associated with a long-term evolution (LTE) Band 71 or a 5G Band 71, an LTE Band 41 or a 5G Band 41, and a Citizens Broadband Radio Service (CBRS).37–387

Claim 16

Depends on claim 15.

16. The method of claim 15 , wherein

  1. Claim 16, element e1the first set of frequency resources allocated to the first base station is a first allocation, 37–131
  2. Claim 16, element e2wherein the first set of frequency resources include at least a portion of first frequencies associated with the LTE Band 71 or the 5G Band 71, and wherein the method further comprises: 133–317
  3. Claim 16, element e3allocating, for the time period, and based at least in part on the first allocation, a second allocation including a third set of frequency resources to the first base station, 319–494
  4. Claim 16, element e4wherein the third set of frequency resources include a portion of second frequencies associated with the LTE Band 41 or the 5G Band 41.496–630

Claim 17

Depends on claim 16.

17. The method of claim 16 , wherein

  1. Claim 17, element e1a first coverage area associated with the first set of frequency resources partially overlaps a second coverage area associated with the second set of frequency resources.37–207

Status

active

As of 2026-11-17, the USPTO record for US 10849180 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2039-03-14 (20 years from filing, plus 100 days of patent term adjustment), a date not yet passed (data version 20261117.2).

Basis
term_20y · pta_days:100 (20 years from filing, plus 100 days of patent term adjustment)
Term end
2039-03-14 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 1 US patent document · Cited by: 57 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10849180/ (needs a free key, as the links under Get this as data)

Family outside the US

Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 10849180 (read 2026-10-15). Their legal status is not shown here.

OfficeNumberKindPublished
EP3874787A12021-09-08
EP3874787A42022-06-08
EP3874787B12024-10-30
EP3874787C02024-10-30
WO2020117474A12020-06-11

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "10849180",
 "status": "active",
 "basis": [
  "term_20y",
  "pta_days:100"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2039-03-14",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/10849180?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/10849180?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/10849180/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=10849180",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/10849180?v=20261117.2

Data 20261117.2 · as of 2026-11-17