US 10912249

Prediction of amount of crop or product remaining for field

Granted 2021-02-09 · Filed 2018-12-19 · Application 16/225,859 · Utility · Kind B1

Assignee as printed
  • Ag Leader Technology, Inc., Ames, IA (US) · PatentsView label: Ag Leader Technology
Inventors
David Edward Wilson, Ames, IA (US)
CPC, current
A01B79/005; G05B13/026

Abstract

A method for managing agricultural operations by predicting amount of crop or product remaining for a field includes performing agricultural operations on at least a portion of a field using an agricultural machine, sensing data associated with the agricultural operations using sensors associated with the agricultural machine, communicating the data associated with the agricultural operations to a computing device, analyzing the data associated with the agricultural operations performed using the computing device to determine an area prediction for a remaining portion of the field upon which the agricultural operations are to be performed, and using the area prediction for the remaining portion of the field by the computing device to determine a time associated with completing the agricultural operations for the field or an amount of material or other resources associated with completing the agricultural operations for the field.

Claims

25 claims · independent 1, 12, 20 and 22

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A method for managing agricultural operations by predicting amount of crop or product remaining for a field, the method comprising:

  1. Claim 1, element e1performing agricultural operations on at least a portion of a field using an agricultural machine; 135–232
  2. Claim 1, element e2sensing data associated with the agricultural operations using sensors associated with the agricultural machine; 234–345
  3. Claim 1, element e3communicating the data associated with the agricultural operations to a computing device; 347–435
  4. Claim 1, element e4analyzing the data associated with the agricultural operations performed using the computing device to determine an area prediction for a remaining portion of the field upon which the agricultural operations are to be performed; 437–664
  5. Claim 1, element e5using the area prediction value for the remaining portion of the field by the computing device to determine (a) a time value associated with completing the agricultural operations for the field or (b) an amount of material value associated with completing the agricultural operations for the field.666–963
10 dependent claims: 2 to 11 (2, 4, 5, 6, 7, 8, 9, 11 on claim 1; 3 on 2; 10 on 9)

Claim 2

Depends on claim 1.

2. The method of claim 1 further comprising

  1. Claim 2, element e1displaying the time associated with completing the agricultural operations for the field or the amount of the material associated with completing the agricultural operations for the field at a display associated with the agricultural machine.44–285

Claim 3

Depends on claim 2.

3. The method of claim 2 further comprising

  1. Claim 3, element e1determining a number of vehicle loads associated with the agricultural operations to be performed on the remaining portion of the field.44–179

Claim 4

Depends on claim 1.

4. The method of claim 1 further comprising

  1. Claim 4, element e1wired or wirelessly communicating the time associated with completing the agricultural operations for the field or the amount of material associated with completing the agricultural operations for the field one at a time or concurrently to one or more devices either at the machine or remote from the machine to assist with logistics relative the field and other management decisions.44–427

Claim 5

Depends on claim 1.

5. The method of claim 1 further comprising

  1. Claim 5, element e1wired or wirelessly receiving additional data at the computing device and using the additional data in determining the time associated with completing the agricultural operations for the field or the amount of material associated with completing the agricultural operations for the field.44–331

Claim 6

Depends on claim 1.

6. The method of claim 1 further comprising

  1. Claim 6, element e1using historic data at the computing device and using the historic data in determining the time associated with completing the agricultural operations for the field or the amount of material associated with completing the agricultural operations for the field.44–303

Claim 7

Depends on claim 1.

7. The method of claim 1 further comprising

  1. Claim 7, element e1determining the amount of the crop or product remaining for the field at least partially based on the area prediction and/or historical data for the field including one or more of: 44–223
  2. Claim 7, element e2a. pre-designated areas upon which no operations are to be performed; 228–293
  3. Claim 7, element e3b. crop sensing information; 298–322
  4. Claim 7, element e4c. a yield monitor measurement; 327–354
  5. Claim 7, element e5d. an application rate measurement.359–390

Claim 8

Depends on claim 1.

8. The method of claim 1 further comprising

  1. Claim 8, element e1determining resources for use in the agricultural operations to be performed on the remaining portion of the field by one or more of an operator of the machine or a remote person or entity.44–232

Claim 9

Depends on claim 1.

9. The method of claim 1 wherein

  1. Claim 9, element e1the determining of the area prediction of the crop or product remaining for the field is also at least partially based on historical data for the field.33–184

Claim 10

Depends on claim 9.

10. The method of claim 9 wherein

  1. Claim 10, element e1the historical data is accessible through a cloud-based server.34–96

Claim 11

Depends on claim 1.

11. The method of claim 1 wherein

  1. Claim 11, element e1the agricultural operations are selected from a set consisting of harvest operations, planting operations, spraying operations, fertilizing operations, pesticide operations, and crop sensing operation.34–234

Claim 12

Independent claim.

12. A method for managing agricultural operations by predicting amount of crop or product remaining for a field, the method comprising:

  1. Claim 12, element e1performing agricultural operations on at least a portion of a field using an agricultural machine; 136–233
  2. Claim 12, element e2sensing data associated with the agricultural operations using sensors associated with the agricultural machine; 235–346
  3. Claim 12, element e3communicating the data associated with the agricultural operations to a computing device; 348–436
  4. Claim 12, element e4analyzing the data associated with the agricultural operations performed using the computing device to determine an area prediction for a remaining portion of the field upon which the agricultural operations are to be performed; 438–665
  5. Claim 12, element e5using the area prediction value for the remaining portion of the field by the computing device to determine (a) a time value associated with completing the agricultural operations for the field or (b) an amount of material value associated with completing the agricultural operations for the field; 667–964
  6. Claim 12, element e6wherein the determining of the area prediction of the crop or product remaining for the field is also at least partially based on historical data for the field at or communicated to the computing device.966–1168
7 dependent claims: 13 to 19 (13, 14, 15, 16, 17, 18, 19 on claim 12)

Claim 13

Depends on claim 12.

13. The method of claim 12 further comprising

  1. Claim 13, element e1displaying the time associated with completing the agricultural operations for the field or the amount of the material associated with completing the agricultural operations for the field at a display associated with the agricultural machine.46–287

Claim 14

Depends on claim 12.

14. The method of claim 12 further comprising

  1. Claim 14, element e1using historic data at the computing device and using the historic data in determining the time associated with completing the agricultural operations for the field or the amount of material associated with completing the agricultural operations for the field.46–305

Claim 15

Depends on claim 12.

15. The method of claim 12 further comprising

  1. Claim 15, element e1determining the amount of the crop or product remaining for the field at least partially based on the area prediction and/or historical data for the field including one or more of: 46–225
  2. Claim 15, element e2a. pre-designated areas upon which no operations are to be performed; 230–295
  3. Claim 15, element e3b. crop sensing information; 300–324
  4. Claim 15, element e4c. a yield monitor measurement; 329–356
  5. Claim 15, element e5d. an application rate measurement.361–392

Claim 16

Depends on claim 12.

16. The method of claim 12 further comprising

  1. Claim 16, element e1determining a number of vehicle loads associated with the agricultural operations to be performed on the remaining portion of the field.46–181

Claim 17

Depends on claim 12.

17. The method of claim 12 further comprising

  1. Claim 17, element e1determining resources for use in the agricultural operations to be performed on the remaining portion of the field by one or more of an operator of the machine or a remote person or entity.46–234

Claim 18

Depends on claim 12.

18. The method of claim 12 wherein

  1. Claim 18, element e1the historical data is accessible through a cloud-based server.35–97

Claim 19

Depends on claim 12.

19. The method of claim 12 wherein

  1. Claim 19, element e1the agricultural operations are selected from a set consisting of harvest operations, planting operations, spraying operations, fertilizing operations, pesticide operations, and crop sensing operations.35–236

Claim 20

Independent claim.

20. A system for managing agriculture operations by predicting amount of crop or product remaining for a field, the system comprising:

  1. Claim 20, element e1a. an agricultural machine capable of traversing the field; 138–193
  2. Claim 20, element e2b. one or more sensors on-board the machine capable of sensing data associated with the agricultural operations; 198–306
  3. Claim 20, element e3c. a mobile communications device associated with an operator of the machine; 311–384
  4. Claim 20, element e4d. one or more additional mobile communication devices associated with one or more interested parties or entities; 389–499
  5. Claim 20, element e5e. a computing device wherein the computing device comprises: 504–561
  6. Claim 20, element e6i. a display, or a dedicated computer and display; 566–612
  7. Claim 20, element e7ii. in communication with the one or more sensors to receive the sensing data; 618–691
  8. Claim 20, element e8iii. adapted to analyze the data related to one or more of: 698–751
  9. Claim 20, element e9(1) agricultural operations performed on the field; 757–803
  10. Claim 20, element e10(2) historical data about the field; 809–840
  11. Claim 20, element e11(3) crop sensing data; 846–863
  12. Claim 20, element e12iv. a calculation of an area prediction for a remaining portion the field upon which the agricultural operations are to be performed; 869–997
  13. Claim 20, element e13v. a display of an indication of the area prediction; 1002–1051
  14. Claim 20, element e14f. a communications link between at least two of the mobile communications device and additional mobile communications devices; 1056–1179
  15. Claim 20, element e15g. so that the area prediction can be utilized to instruct or plan for logistics related to managing the agricultural operations.1184–1309
1 dependent claim: 21 (21 on claim 20)

Claim 21

Depends on claim 20.

21. The system of claim 20 wherein:

  1. Claim 21, element e1a. the agricultural machine comprises: 39–73
  2. Claim 21, element e2i. a harvester; 78–89
  3. Claim 21, element e3ii. an agricultural product applicator; or 95–129
  4. Claim 21, element e4iii. an aerial device; 139–155
  5. Claim 21, element e5b. the sensor comprises: 160–180
  6. Claim 21, element e6i. a yield monitor; 185–200
  7. Claim 21, element e7ii. an application rate sensor; or 206–232
  8. Claim 21, element e8iii. a crop sensor; 242–255
  9. Claim 21, element e9c. the mobile communications device comprises: 260–302
  10. Claim 21, element e10i. a cell phone; 307–319
  11. Claim 21, element e11ii. a tablet computer with a communications module; 325–371
  12. Claim 21, element e12iii. a lap top computer with a communications module; 378–425
  13. Claim 21, element e13iv. a wired phone; or 431–444
  14. Claim 21, element e14v. a two-way radio; 452–467
  15. Claim 21, element e15d. the communications link comprises: 472–505
  16. Claim 21, element e16i. a cellular network; 510–528
  17. Claim 21, element e17ii. a radio network; 534–549
  18. Claim 21, element e18iii. a landline network; or 556–574
  19. Claim 21, element e19iv. the internet; and 583–595
  20. Claim 21, element e20e. the logistics are related to: 604–632
  21. Claim 21, element e21i. transport vehicles to supply the machine or carry products from the machine; 637–712
  22. Claim 21, element e22ii. a remote supplier or storage facility; or 718–755
  23. Claim 21, element e23iii. a management entity.765–784

Claim 22

Independent claim.

22. A method for managing agricultural operations by predicting amount of crop or product remaining for a field, the method comprising:

  1. Claim 22, element e1performing agricultural operations on at least a portion of a field using an agricultural machine; 136–233
  2. Claim 22, element e2sensing data associated with the agricultural operations using sensors associated with the agricultural machine; 235–346
  3. Claim 22, element e3communicating the data associated with the agricultural operations to a computing device; 348–436
  4. Claim 22, element e4analyzing the data associated with the agricultural operations performed using the computing device to determine an area prediction for a remaining portion of the field upon which the agricultural operations are to be performed; 438–665
  5. Claim 22, element e5using the area prediction value for the remaining portion of the field by the computing device and a user-entered modifier to determine (a) a time value associated with completing the agricultural operations for the field or (b) an amount of material value associated with completing the agricultural operations for the field.667–992
3 dependent claims: 23 to 25 (23 on claim 22; 24 on 23; 25 on 24)

Claim 23

Depends on claim 22.

23. The method of claim 22 wherein

  1. Claim 23, element e1the user-entered modification comprises subtracting an amount from a time value or an amount value.35–133

Claim 24

Depends on claim 23.

24. The method of claim 23 wherein

  1. Claim 24, element e1the subtracted amount relates to a container level associated with one or more agricultural machines.35–135

Claim 25

Depends on claim 24.

25. The method of claim 24 wherein

  1. Claim 25, element e1the container level comprises: 35–64
  2. Claim 25, element e2a. amount of harvested product from the field in a container associated with an agricultural machine; 69–166
  3. Claim 25, element e3b. amount of product to be applied to the field in a container associated with an agricultural machine.171–270

Status

active

As of 2026-11-17, the USPTO record for US 10912249 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2036-08-28 (20 years from the filing of a parent application on 2016-03-01, plus 180 days of patent term adjustment), a date not yet passed (data version 20261117.2).

Basis
term_20y · pta_days:180 (20 years from the filing of a parent application on 2016-03-01, plus 180 days of patent term adjustment)
Term end
2036-08-28 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 3 US patent documents · Cited by: 69 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/10912249/ (needs a free key, as the links under Get this as data)

Family outside the US

Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "10912249",
 "status": "active",
 "basis": [
  "term_20y",
  "pta_days:180"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2036-08-28",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/10912249?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/10912249?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/10912249/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=10912249",
   "audience": "agent"
  }
 ]
}

Get this as data