US 11016553
Methods and systems for distributed power control of flexible datacenters
Granted 2021-05-25 · Filed 2018-09-14 · Application 16/132,092 · Utility · Kind B2 · Prior publication US 2020/0089307 A1, 2020-03-19
- Assignee as printed
- LANCIUM LLC, Houston, TX (US)
- Inventors
- Michael T. McNamara, Newport Beach, CA (US); David J. Henson, Houston, TX (US); Raymond E. Cline, Jr., Houston, TX (US)
- CPC, current
- G06F1/20; G06F1/3234; G06F1/26; G06F1/3203; G06F1/324; G06F1/3287; G06F1/329; G06F1/3296; H02J7/35; H02J9/06; Y02B10/70; Y02D10/00; Y02E10/50; Y02P90/50
Abstract
In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A distributed power control system comprising:
- Claim 1, element e1a flexible datacenter comprising (i) a plurality of computing systems powered by a behind-the-meter power input system, (ii) the behind-the-meter power input system configured to receive power from a power generation system prior to the power undergoing step-up transformation for transmission to a grid and deliver the power to the plurality of computing systems, and (iii) a datacenter control system configured to control the plurality of computing systems and the behind-the-meter power input system; 50–553
- Claim 1, element e2a remote master control system configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter; 555–729
- Claim 1, element e3one or more processors; and 731–753
- Claim 1, element e4data storage comprising a first set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: 759–930
- Claim 1, element e5receiving a first operational directive from a local station control system, 932–1007
- Claim 1, element e6wherein the local station control system is configured to at least partially control the power generation system, 1009–1121
- Claim 1, element e7wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption, and in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.1123–1481
15 dependent claims: 2 to 16 (2, 4, 5, 6, 7, 8, 9, 10 on claim 1; 3 on 2; 11, 12, 13, 14, 15, 16 on 10)
Claim 2
Depends on claim 1.
2. The distributed power control system of claim 1 , wherein
- Claim 2, element e1the first operational directive is associated with a reduced power generation condition of the power generation system.61–179
Claim 3
Depends on claim 2.
3. The distributed power control system of claim 2 , wherein
- Claim 3, element e1the reduced power generation condition is associated with a current or expected reduction in available behind-the-meter power below a predetermined availability level.61–227
Claim 4
Depends on claim 1.
4. The distributed power control system of claim 1 , wherein
- Claim 4, element e1causing the plurality of computing systems of the flexible datacenter to perform the first set of predetermined operations results in reduced consumption of the behind-the-meter power by the plurality of computing systems.61–282
Claim 5
Depends on claim 1.
5. The distributed power control system of claim 1 , wherein
- Claim 5, element e1the first set of predetermined operations comprise reducing a computational speed of one or more computing systems of the plurality of computing systems.61–213
Claim 6
Depends on claim 1.
6. The distributed power control system of claim 1 , wherein
- Claim 6, element e1the first set of predetermined operations comprise turning off one or more computing systems of the plurality of computing systems.61–191
Claim 7
Depends on claim 1.
7. The distributed power control system of claim 1 , wherein
- Claim 7, element e1before the datacenter control system receives the first operational directive, the plurality of computing systems are currently performing or scheduled to perform a computational task, and wherein the first set of predetermined computational operations comprise (i) completing a portion of the computational task, (ii) communicating, to the datacenter control system, a result of the completed portion of the computational task, and (iii) ramping down power consumption and entering a reduced-power operational state.61–577
Claim 8
Depends on claim 1.
8. The distributed power control system of claim 1 , wherein
- Claim 8, element e1the first set of predetermined operations comprise reducing a load factor of one or more computing systems of the plurality of computing systems.61–205
Claim 9
Depends on claim 1.
9. The distributed power control system of claim 1 , wherein
- Claim 9, element e1the data storage further comprises a second set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: 61–244
- Claim 9, element e2in response to receiving the first operational directive, causing the behind-the-meter power input system to reduce the power delivered to the plurality of computing systems.246–419
Claim 10
Depends on claim 1.
10. The distributed power control system of claim 1 , wherein
- Claim 10, element e1the data storage further comprises a second set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: 62–245
- Claim 10, element e2receiving a second operational directive from the local station control system; 247–325
- Claim 10, element e3in response to receiving the second operational directive, determining whether a ramp-up condition exists; and 327–432
- Claim 10, element e4in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.438–670
Claim 11
Depends on claim 10.
11. The distributed power control system of claim 10 , wherein
- Claim 11, element e1the second operational directive is associated with a non-reduced power generation condition of the power generation system, and wherein the non-reduced power generation condition is associated with a current or expected increase in available behind-the-meter power above a predetermined availability level.63–369
Claim 12
Depends on claim 10.
12. The distributed power control system of claim 10 , wherein
- Claim 12, element e1the second operational directive is an operational directive that the flexible datacenter is permitted to ramp-up power consumption.63–194
Claim 13
Depends on claim 10.
13. The distributed power control system of claim 10 , wherein
- Claim 13, element e1causing the plurality of computing systems of the flexible datacenter to perform the second set of predetermined operations results in increased consumption of the behind-the-meter power by the plurality of computing systems.63–287
Claim 14
Depends on claim 10.
14. The distributed power control system of claim 10 , wherein
- Claim 14, element e1the second set of predetermined operations comprise increasing the computational speed of one or more computing systems of the plurality of computing systems.63–220
Claim 15
Depends on claim 10.
15. The distributed power control system of claim 10 , wherein
- Claim 15, element e1the second set of predetermined operations comprise turning on one or more computing systems of the plurality of computing systems.63–193
Claim 16
Depends on claim 10.
16. The distributed power control system of claim 10 , wherein
- Claim 16, element e1the data storage further comprises a third set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations that comprise: 63–248
- Claim 16, element e2in response to determining that the ramp-up condition exists, causing the behind-the-meter power input system to increase the power delivered to the plurality of computing systems.250–429
Claim 17
Independent claim.
17. A method performed by a datacenter control system of a flexible datacenter, wherein the flexible datacenter further comprises (i) a plurality of computing systems powered by a behind-the-meter power input system and (ii) the behind-the-meter power input system configured to receive power from a power generation system prior to the power undergoing step-up transformation for transmission to the grid and deliver the power to the plurality of computing systems, wherein the datacenter control system is configured to control the plurality of computing systems and the behind-the-meter power input system, and wherein a remote master control system is configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter, the method comprising:
- Claim 17, element e1receiving a first operational directive from a local station control system, 824–899
- Claim 17, element e2wherein the local station control system is configured to at least partially control the power generation system, 901–1013
- Claim 17, element e3wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption; and 1015–1141
- Claim 17, element e4in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.1147–1373
1 dependent claim: 18 (18 on claim 17)
Claim 18
Depends on claim 17.
18. The method of claim 17 , further comprising:
- Claim 18, element e1receiving a second operational directive from the local station control system, 49–127
- Claim 18, element e2wherein the second operational directive is associated with a non-reduced power generation condition of the power generation system; 129–260
- Claim 18, element e3in response to receiving the second operational directive, determining whether a ramp-up condition exists; and 262–367
- Claim 18, element e4in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.373–605
Claim 19
Independent claim.
19. A non-transitory computer readable medium having stored thereon instructions, that when executed by one or more processors of a datacenter control system of a flexible datacenter, cause the datacenter control system to perform operations comprising:
- Claim 19, element e1receiving a first operational directive from a local station control system, 254–329
- Claim 19, element e2wherein the local station control system is configured to at least partially control a power generation system, 331–441
- Claim 19, element e3wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption, 443–569
- Claim 19, element e4wherein the flexible datacenter further comprises (i) a plurality of computing systems powered by a behind-the-meter power input system and (ii) the behind-the-meter power input system configured to receive power from the power generation system prior to the power undergoing step-up transformation for transmission to a grid and deliver the power to the plurality of computing systems, 571–956
- Claim 19, element e5wherein the datacenter control system is configured to control the plurality of computing systems and the behind-the-meter power input system, and wherein a remote master control system is configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter; and 958–1290
- Claim 19, element e6in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.1296–1522
1 dependent claim: 20 (20 on claim 19)
Claim 20
Depends on claim 19.
20. The non-transitory computer readable medium of claim 19 , the operations further comprising:
- Claim 20, element e1receiving a second operational directive from the local station control system, 97–175
- Claim 20, element e2wherein the second operational directive is associated with a non-reduced power generation condition of the power generation system; 177–308
- Claim 20, element e3in response to receiving the second operational directive, determining whether a ramp-up condition exists; and 310–415
- Claim 20, element e4in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.421–653
1. A distributed power control system comprising: a flexible datacenter comprising (i) a plurality of computing systems powered by a behind-the-meter power input system, (ii) the behind-the-meter power input system configured to receive power from a power generation system prior to the power undergoing step-up transformation for transmission to a grid and deliver the power to the plurality of computing systems, and (iii) a datacenter control system configured to control the plurality of computing systems and the behind-the-meter power input system; a remote master control system configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter; one or more processors; and data storage comprising a first set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: receiving a first operational directive from a local station control system, wherein the local station control system is configured to at least partially control the power generation system, wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption, and in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.
2. The distributed power control system of claim 1 , wherein the first operational directive is associated with a reduced power generation condition of the power generation system.
3. The distributed power control system of claim 2 , wherein the reduced power generation condition is associated with a current or expected reduction in available behind-the-meter power below a predetermined availability level.
4. The distributed power control system of claim 1 , wherein causing the plurality of computing systems of the flexible datacenter to perform the first set of predetermined operations results in reduced consumption of the behind-the-meter power by the plurality of computing systems.
5. The distributed power control system of claim 1 , wherein the first set of predetermined operations comprise reducing a computational speed of one or more computing systems of the plurality of computing systems.
6. The distributed power control system of claim 1 , wherein the first set of predetermined operations comprise turning off one or more computing systems of the plurality of computing systems.
7. The distributed power control system of claim 1 , wherein before the datacenter control system receives the first operational directive, the plurality of computing systems are currently performing or scheduled to perform a computational task, and wherein the first set of predetermined computational operations comprise (i) completing a portion of the computational task, (ii) communicating, to the datacenter control system, a result of the completed portion of the computational task, and (iii) ramping down power consumption and entering a reduced-power operational state.
8. The distributed power control system of claim 1 , wherein the first set of predetermined operations comprise reducing a load factor of one or more computing systems of the plurality of computing systems.
9. The distributed power control system of claim 1 , wherein the data storage further comprises a second set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: in response to receiving the first operational directive, causing the behind-the-meter power input system to reduce the power delivered to the plurality of computing systems.
10. The distributed power control system of claim 1 , wherein the data storage further comprises a second set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations comprising: receiving a second operational directive from the local station control system; in response to receiving the second operational directive, determining whether a ramp-up condition exists; and in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.
11. The distributed power control system of claim 10 , wherein the second operational directive is associated with a non-reduced power generation condition of the power generation system, and wherein the non-reduced power generation condition is associated with a current or expected increase in available behind-the-meter power above a predetermined availability level.
12. The distributed power control system of claim 10 , wherein the second operational directive is an operational directive that the flexible datacenter is permitted to ramp-up power consumption.
13. The distributed power control system of claim 10 , wherein causing the plurality of computing systems of the flexible datacenter to perform the second set of predetermined operations results in increased consumption of the behind-the-meter power by the plurality of computing systems.
14. The distributed power control system of claim 10 , wherein the second set of predetermined operations comprise increasing the computational speed of one or more computing systems of the plurality of computing systems.
15. The distributed power control system of claim 10 , wherein the second set of predetermined operations comprise turning on one or more computing systems of the plurality of computing systems.
16. The distributed power control system of claim 10 , wherein the data storage further comprises a third set of instructions that, when executed by the one or more processors, cause the datacenter control system to perform operations that comprise: in response to determining that the ramp-up condition exists, causing the behind-the-meter power input system to increase the power delivered to the plurality of computing systems.
17. A method performed by a datacenter control system of a flexible datacenter, wherein the flexible datacenter further comprises (i) a plurality of computing systems powered by a behind-the-meter power input system and (ii) the behind-the-meter power input system configured to receive power from a power generation system prior to the power undergoing step-up transformation for transmission to the grid and deliver the power to the plurality of computing systems, wherein the datacenter control system is configured to control the plurality of computing systems and the behind-the-meter power input system, and wherein a remote master control system is configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter, the method comprising: receiving a first operational directive from a local station control system, wherein the local station control system is configured to at least partially control the power generation system, wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption; and in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.
18. The method of claim 17 , further comprising: receiving a second operational directive from the local station control system, wherein the second operational directive is associated with a non-reduced power generation condition of the power generation system; in response to receiving the second operational directive, determining whether a ramp-up condition exists; and in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.
19. A non-transitory computer readable medium having stored thereon instructions, that when executed by one or more processors of a datacenter control system of a flexible datacenter, cause the datacenter control system to perform operations comprising: receiving a first operational directive from a local station control system, wherein the local station control system is configured to at least partially control a power generation system, wherein the first operational directive is an operational directive for the flexible datacenter to ramp-down power consumption, wherein the flexible datacenter further comprises (i) a plurality of computing systems powered by a behind-the-meter power input system and (ii) the behind-the-meter power input system configured to receive power from the power generation system prior to the power undergoing step-up transformation for transmission to a grid and deliver the power to the plurality of computing systems, wherein the datacenter control system is configured to control the plurality of computing systems and the behind-the-meter power input system, and wherein a remote master control system is configured to issue instructions to the flexible datacenter that affect an amount of behind-the-meter power consumed by the flexible datacenter; and in response to receiving the first operational directive, causing the plurality of computing systems of the flexible datacenter to perform a first set of predetermined operations correlated with the first operational directive.
20. The non-transitory computer readable medium of claim 19 , the operations further comprising: receiving a second operational directive from the local station control system, wherein the second operational directive is associated with a non-reduced power generation condition of the power generation system; in response to receiving the second operational directive, determining whether a ramp-up condition exists; and in response to determining that the ramp-up condition exists, causing the plurality of computing systems of the flexible datacenter to perform a second set of predetermined operations correlated with the second operational directive.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 11016553 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-11-19 (20 years from filing, plus 66 days of patent term adjustment), a date not yet passed (data version 20261117.2).
- Basis
- term_20y · pta_days:66 (20 years from filing, plus 66 days of patent term adjustment)
- Term end
- 2038-11-19 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 33 US patent documents · Cited by: 46 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11016553/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11016553 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| AU | 2019339494 | A1 | 2021-04-08 |
| CA | 3111583 | A1 | 2020-03-19 |
| EP | 3850465 | A1 | 2021-07-21 |
| EP | 3850465 | A4 | 2022-06-01 |
| EP | 3850465 | B1 | 2024-05-01 |
| ES | 2981318 | T3 | 2024-10-08 |
| WO | 2020056296 | A1 | 2020-03-19 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "11016553",
"status": "active",
"basis": [
"term_20y",
"pta_days:66"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2038-11-19",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/11016553?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/11016553?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/11016553/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=11016553",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/11016553/ - Status record
/api/v1/lapse/status/11016553/ - Claim tree
/api/v1/structure/claims/11016553/ - Brief
/api/v1/structure/brief/11016553/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.