US 11022526

Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit

Granted 2021-06-01 · Filed 2020-06-09 · Application 16/946,172 · Utility · Kind B1

Assignee as printed
  • BJ Energy Solutions, LLC, Houston, TX (US)
Inventors
Tony Yeung, Tomball, TX (US); Ricardo Rodriguez-Ramon, Tomball, TX (US); Joseph Foster, Tomball, TX (US)
CPC, current
G01M99/005; E21B43/2607; F04B17/05; F04B51/00; F04B15/02

Abstract

Systems and methods to monitor a condition of a fracturing component section including a section frame and a hydraulic fracturing component of a hydraulic fracturing unit to pump fracturing fluid connected to the section frame may include a condition monitoring controller configured to receive one or more signals from one or more sensors configured to be connected to the fracturing component section and generate signals indicative of operating parameters associated with operation of the fracturing component. The condition monitoring controller may be configured to generate, based at least in part on the signals, condition signals indicative of approaching maintenance due to be performed, predicted component damage, predicted component failure, existing component damage, existing component failure, irregularities of component operation, and/or operation exceeding rated operation. The systems and methods also may include exchanging the fracturing component for another fracturing component based at least in part on the condition signals.

Claims

14 claims · independent 1, 13 and 14

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A method to monitor a condition of a first fracturing component section including a first hydraulic fracturing component of a hydraulic fracturing unit and to exchange the first fracturing component section for a second fracturing component section including a second hydraulic fracturing component, each of the first and second fracturing component sections being fracturing unit components, the method comprising:

  1. Claim 1, element e1receiving, via a condition monitoring controller, one or more signals from one or more of a plurality of sensors connected to the first fracturing component section; and 419–583
  2. Claim 1, element e2generating, based at least in part on the one or more signals, one or more condition signals associated with the first fracturing component section; 589–736
  3. Claim 1, element e3communicating the one or more condition signals: 738–785
  4. Claim 1, element e4(a) via an output device in communication with the condition monitoring controller, 791–869
  5. Claim 1, element e5(b) to an on-site operator of the first fracturing component section, or (c) via a transmitter to a location remote from the first fracturing component section; and 875–1030
  6. Claim 1, element e6exchanging, based at least in part on the communicating, the first fracturing component section for the second fracturing component section including the second hydraulic fracturing component, the first and second fracturing component sections each being supported by first and second section frames, respectively, the first and second section frames each including a base that supports the first and second fracturing component sections, respectively, the exchanging being done by moving the first and second fracturing component sections together with the first and second section frames, respectively, and the exchanging comprises: 1036–1669
  7. Claim 1, element e7(a) disconnecting and connecting one or more electrical and fluid couplers connected to at least one coupling plate attached to an outside portion of each of the first and second section frames, 1675–1864
  8. Claim 1, element e8(b) disconnecting the first fracturing component section from another fracturing component section of the hydraulic fracturing unit, the first fracturing component section and another fracturing component section including one or more of a functioning pump, transmission or internal combustion engine of a hydraulic fracturing system, at least one of the at least one or more functioning pump, transmission or internal combustion engine includes auxiliary components used to operate the first fracturing component section, 1870–2387
  9. Claim 1, element e9(c) disconnecting a first section frame of the first fracturing component section from a platform supporting a plurality of fracturing component sections of the hydraulic fracturing unit, the first section frame including a base that supports the first fracturing component section, and one or more opposing guide rails, the opposing guide rails configured to assist with at least one of alignment of the first fracturing component section on the platform, and alignment of the first fracturing component section with the another fracturing component section, 2393–2947
  10. Claim 1, element e10(d) separating the first fracturing component section from the platform, 2953–3020
  11. Claim 1, element e11(e) positioning the second fracturing component section at a position of the platform previously occupied by the first fracturing component section, the second fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system and corresponding to the disconnected and separated first fracturing component section, 3026–3419
  12. Claim 1, element e12(f) securing the second fracturing component section to the platform, and 3425–3489
  13. Claim 1, element e13(g) connecting the second fracturing component section to another fracturing component section of the hydraulic fracturing unit.3499–3622
11 dependent claims: 2 to 12 (2, 3, 4, 8, 9, 10, 11, 12 on claim 1; 5, 6, 7 on 4)

Claim 2

Depends on claim 1.

2. The method of claim 1 , wherein

  1. Claim 2, element e1generating the one or more condition signals associated with the first fracturing component section comprises generating one or more signals indicative of one or more of approaching maintenance due to be performed, predicted component damage, predicted component failure, existing component damage, existing component failure, irregularities of component operation, or operation exceeding rated operation.35–439

Claim 3

Depends on claim 1.

3. The method of claim 1 , wherein

  1. Claim 3, element e1receiving the one or more signals comprises receiving one or more signals generated by one or more of a pressure sensor, a vibration sensor, a temperature sensor, or a fluid condition sensor, the method further comprising: 35–256
  2. Claim 3, element e2identifying, via the condition monitoring controller, one or more of excessive pressure, excessive vibration, excessive temperature, fluid contamination, or fluid degradation associated with the first fracturing component section.258–487

Claim 4

Depends on claim 1.

4. The method of claim 1 , wherein

  1. Claim 4, element e1the condition monitoring controller comprises a first condition monitoring controller, and the second fracturing component section comprises a second condition monitoring controller, the method further comprising: 35–247
  2. Claim 4, element e2generating, via the second condition monitoring controller, one or more second condition signals associated with the second fracturing component section.249–401

Claim 5

Depends on claim 4.

5. The method of claim 4 , further comprising

  1. Claim 5, element e1one or more of communicating the one or more second condition signals: 46–115
  2. Claim 5, element e2via a second output device in communication with the second condition monitoring controller, with an on-site operator; or 117–234
  3. Claim 5, element e3via a second transmitter in communication with the second condition monitoring controller, to a location remote from the second fracturing component section.239–395

Claim 6

Depends on claim 4.

6. The method of claim 4 , wherein

  1. Claim 6, element e1generating the one or more second condition signals associated with the second fracturing component section comprises generating, via the second condition monitoring controller, one or more signals indicative of one or more of: 35–261
  2. Claim 6, element e2(a) approaching maintenance due to be performed on the second fracturing component section, 267–353
  3. Claim 6, element e3(b) predicted component damage associated with the second fracturing component section, 359–441
  4. Claim 6, element e4(c) predicted component failure associated with the second fracturing component section, 447–530
  5. Claim 6, element e5(d) existing component damage associated with the second fracturing component section, 536–617
  6. Claim 6, element e6(e) existing component failure associated with the second fracturing component section, 623–705
  7. Claim 6, element e7(f) irregularities of component operation associated with the second fracturing component section, or (g) operation exceeding rated operation associated with the second fracturing component section.711–904

Claim 7

Depends on claim 4.

7. The method claim 4 , further comprising:

  1. Claim 7, element e1comparing (1) the one or more condition signals associated with the first fracturing component section with (2) the one or more second condition signals associated with the second fracturing component section; and 44–252
  2. Claim 7, element e2wherein the exchanging is based at least in part on the comparing, 258–323
  3. Claim 7, element e3wherein each of the first fracturing component section and the second fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system.325–545

Claim 8

Depends on claim 1.

8. The method of claim 1 , further comprising:

  1. Claim 8, element e1disconnecting one or more of (1) a first component electrical assembly of the first fracturing component section from electrical cables of the hydraulic fracturing unit or (2) a first component fluid assembly of the first fracturing component section from fluid conduits of the hydraulic fracturing unit; and 47–350
  2. Claim 8, element e2connecting one or more of (1) a second component electrical assembly of the second fracturing component section to the electrical cables of the hydraulic fracturing unit or (2) connecting a second component fluid assembly of the second fracturing component section to the fluid conduits of a hydraulic fracturing unit, 356–673
  3. Claim 8, element e3wherein the disconnecting of the first component electrical assembly and the first component fluid assembly and connecting of the second component electrical assembly and second component fluid assembly comprises disconnecting and connecting the one or more electrical and fluid couplers.675–962

Claim 9

Depends on claim 1.

9. The method of claim 1 , wherein:

  1. Claim 9, element e1the internal combustion engine of the first fracturing component section supplies power to the pump of the another fracturing component section; and 36–179
  2. Claim 9, element e2disconnecting the first fracturing component section from another fracturing component section of the hydraulic fracturing unit comprises disconnecting an output shaft of the internal combustion engine of the first fracturing component section from a driveshaft of the transmission of the another fracturing component section; and 185–510
  3. Claim 9, element e3disconnecting the first section frame of the first fracturing component from the platform comprises using a lifting eye formed in the first section frame.516–669

Claim 10

Depends on claim 1.

10. The method of claim 1 , wherein:

  1. Claim 10, element e1the transmission of the first fracturing component section connects an output of the internal combustion engine of the another fracturing component section to a pump of a third fracturing component section; and 37–242
  2. Claim 10, element e2disconnecting the first fracturing component section from another fracturing component of the hydraulic fracturing unit comprises: 248–377
  3. Claim 10, element e3disconnecting a driveshaft of the transmission of the first fracturing component section from an output shaft of the internal combustion engine of the another fracturing component section; and 379–566
  4. Claim 10, element e4disconnecting an output shaft of the transmission of the first fracturing component section from a driveshaft shaft of the pump of the third fracturing component section.572–741

Claim 11

Depends on claim 1.

11. The method of claim 1 , the first fracturing component section comprises

  1. Claim 11, element e1a hydraulic fracturing pump; and 77–104
  2. Claim 11, element e2disconnecting the first fracturing component section from the another fracturing component section of the hydraulic fracturing unit comprises disconnecting a driveshaft shaft of the pump of the first fracturing component section from an output shaft of the transmission of the another fracturing component section.110–423

Claim 12

Depends on claim 1.

12. The method of claim 1 , wherein

  1. Claim 12, element e1the electrical and fluid couplers are quick-connect electrical couplers and quick-connect fluid couplers, respectively.36–154

Claim 13

Independent claim.

13. A method to monitor a condition of a first fracturing component section including a first hydraulic fracturing component of a hydraulic fracturing unit and to exchange the first fracturing component section for a second fracturing component section including a second hydraulic fracturing component, the method comprising:

  1. Claim 13, element e1(1) receiving, via a condition monitoring controller, one or more signals from one or more of a plurality of sensors connected to the first fracturing component section; and 331–495
  2. Claim 13, element e2(2) generating, based at least in part on the one or more signals, one or more condition signals associated with the first fracturing component section; 505–652
  3. Claim 13, element e3(3) communicating the one or more condition signals: 658–705
  4. Claim 13, element e4(a) via an output device in communication with the condition monitoring controller, 711–789
  5. Claim 13, element e5(b) to an on-site operator of the first fracturing component section, or (c) via a transmitter to a location remote from the first fracturing component section; and 795–950
  6. Claim 13, element e6(4) exchanging, based at least in part on the communicating, the first fracturing component section for the second fracturing component section including the second hydraulic fracturing component, the first and second fracturing component sections each comprise a first and second section frame, respectively, and each section frame comprises a base for supporting a corresponding fracturing component section, the exchanging being done by moving the first and second fracturing component sections together with the first and second section frames, respectively, the exchanging comprises (a) disconnecting and connecting one or more electrical and fluid couplers connected to at least one coupling plate attached to an outside portion of each of the first and second section frames, (b), disconnecting the first fracturing component section from another fracturing component section of the hydraulic fracturing unit, the first fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system, (c) disconnecting a first section frame of the first fracturing component section from a platform supporting a plurality of fracturing component sections of the hydraulic fracturing unit, separating the first fracturing component section from the platform, the separating of the first fracturing component section from the platform includes use of one or more recesses formed in opposing guide rails of each base that support a fracturing component section, (d) positioning the second fracturing component section at a position of the platform previously occupied by the first fracturing component section, the second fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system and corresponding to the disconnected and separated first fracturing component section, (e) securing the second fracturing component section to the platform, and (f) connecting the second fracturing component section to the another fracturing component section of the hydraulic fracturing unit.960–3097

Claim 14

Independent claim.

14. A method to monitor a condition of a first fracturing component section including a first hydraulic fracturing component of a hydraulic fracturing unit and to exchange the first fracturing component section for a second fracturing component section including a second hydraulic fracturing component, each of the first and second fracturing component sections being fracturing unit components, the method comprising:

  1. Claim 14, element e1(1) receiving, via a condition monitoring controller, one or more signals from one or more of a plurality of sensors connected to the first fracturing component section; and 424–588
  2. Claim 14, element e2(2) generating, based at least in part on the one or more signals, one or more condition signals associated with the first fracturing component section; 598–745
  3. Claim 14, element e3(3) communicating the one or more condition signals: 751–798
  4. Claim 14, element e4(a) via an output device in communication with the condition monitoring controller, 804–882
  5. Claim 14, element e5(b) to an on-site operator of the first fracturing component section, or (c) via a transmitter to a location remote from the first fracturing component section; and 888–1043
  6. Claim 14, element e6(4) exchanging, based at least in part on the communicating, the first fracturing component section for the second fracturing component section including the second hydraulic fracturing component, the first and second fracturing component sections each being supported by first and second section frames, respectively, the first and second section frames each including a base that supports the first and second fracturing component sections, respectively, the exchanging being done by moving the first and second fracturing component sections together with the first and second section frames, respectively, and the exchanging comprises: 1053–1686
  7. Claim 14, element e7(a) disconnecting and connecting one or more electrical and fluid couplers connected to at least one coupling plate attached to an outside portion of each of the first and second section frames, 1692–1881
  8. Claim 14, element e8(b) disconnecting the first fracturing component section from another fracturing component section of the hydraulic fracturing unit, the first fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system, 1887–2176
  9. Claim 14, element e9(c) disconnecting a first section frame of the first fracturing component section from a platform supporting a plurality of fracturing component sections of the hydraulic fracturing unit, the disconnecting comprising disconnecting fasteners received in holes formed in the base, 2182–2455
  10. Claim 14, element e10(d) separating the first fracturing component section from the platform, 2461–2528
  11. Claim 14, element e11(e) positioning the second fracturing component section at a position of the platform previously occupied by the first fracturing component section, the second fracturing component section including one or more of a functioning pump, transmission, or internal combustion engine of a hydraulic fracturing system and corresponding to the disconnected and separated first fracturing component section, 2534–2927
  12. Claim 14, element e12(f) securing the second fracturing component section to the platform, and 2933–2997
  13. Claim 14, element e13(g) connecting the second fracturing component section to another fracturing component section of the hydraulic fracturing unit.3007–3130

Status

expired_fee_nonpayment

As of 2026-11-17, the USPTO maintenance-fee record for US 11022526 has an entry dated 2025-07-07 recording that the patent expired for nonpayment of a maintenance fee, and no reinstatement after it (data version 20261117.2).

Basis
fee_lapse:2025-07-07 · term_20y (fee-lapse entry dated 2025-07-07, 20 years from filing)
Term end
2040-06-09 Computed from the dates in the USPTO recordThe maintenance-fee entry dated 2025-07-07 records an expiry for nonpayment; the date in this row is computed without the maintenance-fee record.
Fee lapse
2025-07-07
Reinstatement
none on record; reinstatement_possible: unknown, 37 CFR 1.378: a petition to accept a delayed maintenance fee on the basis of unintentional delay has no fixed time limit; the fee-event record shows no reinstatement as of 2026-11-17
As of
2026-11-17
Data version
20261117.2

A petition under 37 CFR 1.378 has no fixed time limit; the record does not show whether one would be granted.

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 208 US patent documents · Cited by: 81 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11022526/ (needs a free key, as the links under Get this as data)

Family outside the US

Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11022526 (read 2026-10-15). Their legal status is not shown here.

OfficeNumberKindPublished
CA3114005A12021-12-09
CA3114005C2024-01-02

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11022526",
 "status": "expired_fee_nonpayment",
 "basis": [
  "fee_lapse:2025-07-07",
  "term_20y"
 ],
 "reinstatement_possible": "unknown",
 "reinstatement_basis": "37 CFR 1.378: a petition to accept a delayed maintenance fee on the basis of unintentional delay has no fixed time limit; the fee-event record shows no reinstatement as of 2026-11-17",
 "expiry_date_estimated": "2040-06-09",
 "lapse_date": "2025-07-07",
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11022526?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11022526?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11022526/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11022526",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11022526?v=20261117.2

Data 20261117.2 · as of 2026-11-17