PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 11025060

Providing computational resource availability based on power-generation signals

Granted 2021-06-01 · Filed 2018-09-14 · Application 16/132,098 · Utility · Kind B2 · Prior publication US 2020/0091717 A1, 2020-03-19

Assignee as printed
  • LANCIUM LLC, Houston, TX (US)
Inventors
Michael T. McNamara, Newport Beach, CA (US); David J. Henson, Houston, TX (US); Raymond E. Cline, Jr., Houston, TX (US)
CPC, current
G05F1/66; G05B15/02; H02J3/14; H02J3/18; H02J2101/20; H02J2300/20; H02J2310/16; H02J2310/64; Y02B90/20; Y04S20/00; Y04S50/10

Abstract

Example embodiments for providing computation resource availability based on power-generation signals are presented herein. An embodiment may involve receive information indicative of power-generation economic signals at a first control system and identifying at least one of: (i) a change in a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit. Responsive to the identification, the embodiment involves performing at least one of: (i) adjusting a rate of power use by a flexible datacenter, and (ii) providing an indication of computation resource availability to a second control system. The flexible datacenter may include a behind-the-meter power input system, a power distribution system, and computing systems configured to receive power from the behind-the-meter power input system via the power distribution system.

Claims

20 claims · independent 1, 15 and 20

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A method comprising:

  1. Claim 1, element e1receiving, at a first control system, information indicative of a plurality of power-generation economic signals; 24–136
  2. Claim 1, element e2based on the received information, identifying, by the first control system, at least one of: 138–230
  3. Claim 1, element e3(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 236–520
  4. Claim 1, element e4based on the identification, performing at least one of: 526–581
  5. Claim 1, element e5(i) adjusting a rate of power use by a flexible datacenter and (ii) determining and providing an indication of computation resource availability to a second control system, 587–754
  6. Claim 1, element e6wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system and wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.756–1203
13 dependent claims: 2 to 14 (2, 4, 5, 7, 8, 9, 11, 12, 13, 14 on claim 1; 3 on 2; 6 on 5; 10 on 9)

Claim 2

Depends on claim 1.

2. The method of claim 1 , wherein

  1. Claim 2, element e1the first control system comprises a datacenter control system collocated with the flexible datacenter.35–137

Claim 3

Depends on claim 2.

3. The method of claim 2 , wherein

  1. Claim 3, element e1the first control system is configured to receive power from a power grid.35–108

Claim 4

Depends on claim 1.

4. The method of claim 1 , wherein

  1. Claim 4, element e1the first control system comprises a remote master control system located remote from the flexible datacenter.35–144

Claim 5

Depends on claim 1.

5. The method of claim 1 , wherein

  1. Claim 5, element e1the second control system comprises a datacenter control system collocated with the flexible datacenter.35–138

Claim 6

Depends on claim 5.

6. The method of claim 5 , wherein

  1. Claim 6, element e1the second control system is configured to receive power from a power grid.35–109

Claim 7

Depends on claim 1.

7. The method of claim 1 , wherein

  1. Claim 7, element e1the second control system comprises a remote master control system located remote from the flexible datacenter.35–145

Claim 8

Depends on claim 1.

8. The method of claim 1 , wherein

  1. Claim 8, element e1the first control system and the second control system are the same control system.35–117

Claim 9

Depends on claim 1.

9. The method of claim 1 , wherein

  1. Claim 9, element e1the plurality of computing systems are further configured to also receive power from a power grid via the power distribution system.35–166

Claim 10

Depends on claim 9.

10. The method of claim 9 , wherein

  1. Claim 10, element e1the plurality of computing systems are capable of switching between receiving behind-the-meter power and grid power.36–151

Claim 11

Depends on claim 1.

11. The method of claim 1 , wherein

  1. Claim 11, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost of power received from a power grid.36–200

Claim 12

Depends on claim 1.

12. The method of claim 1 , wherein

  1. Claim 12, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.36–224

Claim 13

Depends on claim 1.

13. The method of claim 1 , wherein

  1. Claim 13, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost associated with selling power from an amount of behind-the-meter power to a power grid.36–251

Claim 14

Depends on claim 1.

14. The method of claim 1 , wherein

  1. Claim 14, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.36–262

Claim 15

Independent claim.

15. A system comprising:

  1. Claim 15, element e1a flexible datacenter comprising: 25–57
  2. Claim 15, element e2a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; and 59–270
  3. Claim 15, element e3a first control system configured to: 276–312
  4. Claim 15, element e4receive information indicative of a plurality of power-generation economic signals; 314–396
  5. Claim 15, element e5based on the received information, identify at least one of: 398–457
  6. Claim 15, element e6(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 463–747
  7. Claim 15, element e7based on the identification, perform at least one of: 753–805
  8. Claim 15, element e8(i) adjusting a rate of power use by a flexible datacenter comprising a plurality of computing systems, and (ii) determining and providing an indication of computation resource availability to a second control system; 811–1023
  9. Claim 15, element e9wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.1025–1214
4 dependent claims: 16 to 19 (16, 17, 18, 19 on claim 15)

Claim 16

Depends on claim 15.

16. The system of claim 15 , wherein

  1. Claim 16, element e1the first control system comprises a datacenter control system collocated with the flexible datacenter.37–139

Claim 17

Depends on claim 15.

17. The system of claim 15 , wherein

  1. Claim 17, element e1the first control system comprises a remote master control system located remote from the flexible datacenter.37–146

Claim 18

Depends on claim 15.

18. The system of claim 15 , wherein

  1. Claim 18, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.37–225

Claim 19

Depends on claim 15.

19. The system of claim 15 , wherein

  1. Claim 19, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.37–263

Claim 20

Independent claim.

20. A non-transitory computer-readable medium configured to store instructions, that when executed by one or more processors, cause a control system to perform functions comprising:

  1. Claim 20, element e1receiving information indicative of a plurality of power-generation economic signals; 182–266
  2. Claim 20, element e2based on the received information, identifying at least one of: 268–330
  3. Claim 20, element e3(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 336–620
  4. Claim 20, element e4based on the identification, performing at least one of: 626–681
  5. Claim 20, element e5(i) adjusting a rate of power use by a flexible datacenter, and (ii) determining and providing an indication of computation resource availability to a second control system, 687–855
  6. Claim 20, element e6wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; 857–1110
  7. Claim 20, element e7wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.1112–1301

Status

active

As of 2026-11-17, the USPTO record for US 11025060 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-09-14 (20 years from filing), a date not yet passed (data version 20261117.2).

Basis
term_20y (20 years from filing)
Term end
2038-09-14 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 33 US patent documents · Cited by: 51 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11025060/ (needs a free key, as the links under Get this as data)

Family outside the US

Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11025060 (read 2026-10-15). Their legal status is not shown here.

OfficeNumberKindPublished
AU2019338540A12021-04-01
CA3112037A12020-03-19
EP3850463A12021-07-21
EP3850463A42022-05-18
WO2020056319A12020-03-19

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11025060",
 "status": "active",
 "basis": [
  "term_20y"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2038-09-14",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11025060?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11025060?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11025060/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11025060",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11025060?v=20261117.2

Data 20261117.2 · as of 2026-11-17