US 11025060
Providing computational resource availability based on power-generation signals
Granted 2021-06-01 · Filed 2018-09-14 · Application 16/132,098 · Utility · Kind B2 · Prior publication US 2020/0091717 A1, 2020-03-19
- Assignee as printed
- LANCIUM LLC, Houston, TX (US)
- Inventors
- Michael T. McNamara, Newport Beach, CA (US); David J. Henson, Houston, TX (US); Raymond E. Cline, Jr., Houston, TX (US)
- CPC, current
- G05F1/66; G05B15/02; H02J3/14; H02J3/18; H02J2101/20; H02J2300/20; H02J2310/16; H02J2310/64; Y02B90/20; Y04S20/00; Y04S50/10
Abstract
Example embodiments for providing computation resource availability based on power-generation signals are presented herein. An embodiment may involve receive information indicative of power-generation economic signals at a first control system and identifying at least one of: (i) a change in a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit. Responsive to the identification, the embodiment involves performing at least one of: (i) adjusting a rate of power use by a flexible datacenter, and (ii) providing an indication of computation resource availability to a second control system. The flexible datacenter may include a behind-the-meter power input system, a power distribution system, and computing systems configured to receive power from the behind-the-meter power input system via the power distribution system.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A method comprising:
- Claim 1, element e1receiving, at a first control system, information indicative of a plurality of power-generation economic signals; 24–136
- Claim 1, element e2based on the received information, identifying, by the first control system, at least one of: 138–230
- Claim 1, element e3(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 236–520
- Claim 1, element e4based on the identification, performing at least one of: 526–581
- Claim 1, element e5(i) adjusting a rate of power use by a flexible datacenter and (ii) determining and providing an indication of computation resource availability to a second control system, 587–754
- Claim 1, element e6wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system and wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.756–1203
13 dependent claims: 2 to 14 (2, 4, 5, 7, 8, 9, 11, 12, 13, 14 on claim 1; 3 on 2; 6 on 5; 10 on 9)
Claim 2
Depends on claim 1.
2. The method of claim 1 , wherein
- Claim 2, element e1the first control system comprises a datacenter control system collocated with the flexible datacenter.35–137
Claim 3
Depends on claim 2.
3. The method of claim 2 , wherein
- Claim 3, element e1the first control system is configured to receive power from a power grid.35–108
Claim 4
Depends on claim 1.
4. The method of claim 1 , wherein
- Claim 4, element e1the first control system comprises a remote master control system located remote from the flexible datacenter.35–144
Claim 5
Depends on claim 1.
5. The method of claim 1 , wherein
- Claim 5, element e1the second control system comprises a datacenter control system collocated with the flexible datacenter.35–138
Claim 6
Depends on claim 5.
6. The method of claim 5 , wherein
- Claim 6, element e1the second control system is configured to receive power from a power grid.35–109
Claim 7
Depends on claim 1.
7. The method of claim 1 , wherein
- Claim 7, element e1the second control system comprises a remote master control system located remote from the flexible datacenter.35–145
Claim 8
Depends on claim 1.
8. The method of claim 1 , wherein
- Claim 8, element e1the first control system and the second control system are the same control system.35–117
Claim 9
Depends on claim 1.
9. The method of claim 1 , wherein
- Claim 9, element e1the plurality of computing systems are further configured to also receive power from a power grid via the power distribution system.35–166
Claim 10
Depends on claim 9.
10. The method of claim 9 , wherein
- Claim 10, element e1the plurality of computing systems are capable of switching between receiving behind-the-meter power and grid power.36–151
Claim 11
Depends on claim 1.
11. The method of claim 1 , wherein
- Claim 11, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost of power received from a power grid.36–200
Claim 12
Depends on claim 1.
12. The method of claim 1 , wherein
- Claim 12, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.36–224
Claim 13
Depends on claim 1.
13. The method of claim 1 , wherein
- Claim 13, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost associated with selling power from an amount of behind-the-meter power to a power grid.36–251
Claim 14
Depends on claim 1.
14. The method of claim 1 , wherein
- Claim 14, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.36–262
Claim 15
Independent claim.
15. A system comprising:
- Claim 15, element e1a flexible datacenter comprising: 25–57
- Claim 15, element e2a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; and 59–270
- Claim 15, element e3a first control system configured to: 276–312
- Claim 15, element e4receive information indicative of a plurality of power-generation economic signals; 314–396
- Claim 15, element e5based on the received information, identify at least one of: 398–457
- Claim 15, element e6(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 463–747
- Claim 15, element e7based on the identification, perform at least one of: 753–805
- Claim 15, element e8(i) adjusting a rate of power use by a flexible datacenter comprising a plurality of computing systems, and (ii) determining and providing an indication of computation resource availability to a second control system; 811–1023
- Claim 15, element e9wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.1025–1214
4 dependent claims: 16 to 19 (16, 17, 18, 19 on claim 15)
Claim 16
Depends on claim 15.
16. The system of claim 15 , wherein
- Claim 16, element e1the first control system comprises a datacenter control system collocated with the flexible datacenter.37–139
Claim 17
Depends on claim 15.
17. The system of claim 15 , wherein
- Claim 17, element e1the first control system comprises a remote master control system located remote from the flexible datacenter.37–146
Claim 18
Depends on claim 15.
18. The system of claim 15 , wherein
- Claim 18, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.37–225
Claim 19
Depends on claim 15.
19. The system of claim 15 , wherein
- Claim 19, element e1at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.37–263
Claim 20
Independent claim.
20. A non-transitory computer-readable medium configured to store instructions, that when executed by one or more processors, cause a control system to perform functions comprising:
- Claim 20, element e1receiving information indicative of a plurality of power-generation economic signals; 182–266
- Claim 20, element e2based on the received information, identifying at least one of: 268–330
- Claim 20, element e3(i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and 336–620
- Claim 20, element e4based on the identification, performing at least one of: 626–681
- Claim 20, element e5(i) adjusting a rate of power use by a flexible datacenter, and (ii) determining and providing an indication of computation resource availability to a second control system, 687–855
- Claim 20, element e6wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; 857–1110
- Claim 20, element e7wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.1112–1301
1. A method comprising: receiving, at a first control system, information indicative of a plurality of power-generation economic signals; based on the received information, identifying, by the first control system, at least one of: (i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and based on the identification, performing at least one of: (i) adjusting a rate of power use by a flexible datacenter and (ii) determining and providing an indication of computation resource availability to a second control system, wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system and wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.
2. The method of claim 1 , wherein the first control system comprises a datacenter control system collocated with the flexible datacenter.
3. The method of claim 2 , wherein the first control system is configured to receive power from a power grid.
4. The method of claim 1 , wherein the first control system comprises a remote master control system located remote from the flexible datacenter.
5. The method of claim 1 , wherein the second control system comprises a datacenter control system collocated with the flexible datacenter.
6. The method of claim 5 , wherein the second control system is configured to receive power from a power grid.
7. The method of claim 1 , wherein the second control system comprises a remote master control system located remote from the flexible datacenter.
8. The method of claim 1 , wherein the first control system and the second control system are the same control system.
9. The method of claim 1 , wherein the plurality of computing systems are further configured to also receive power from a power grid via the power distribution system.
10. The method of claim 9 , wherein the plurality of computing systems are capable of switching between receiving behind-the-meter power and grid power.
11. The method of claim 1 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost of power received from a power grid.
12. The method of claim 1 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.
13. The method of claim 1 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a cost associated with selling power from an amount of behind-the-meter power to a power grid.
14. The method of claim 1 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.
15. A system comprising: a flexible datacenter comprising: a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; and a first control system configured to: receive information indicative of a plurality of power-generation economic signals; based on the received information, identify at least one of: (i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and based on the identification, perform at least one of: (i) adjusting a rate of power use by a flexible datacenter comprising a plurality of computing systems, and (ii) determining and providing an indication of computation resource availability to a second control system; wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.
16. The system of claim 15 , wherein the first control system comprises a datacenter control system collocated with the flexible datacenter.
17. The system of claim 15 , wherein the first control system comprises a remote master control system located remote from the flexible datacenter.
18. The system of claim 15 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a purchase price for power associated with the flexible datacenter.
19. The system of claim 15 , wherein at least one or more power-generation economic signals of the plurality of power-generation economic signals are based on a comparison of a first price for power grid power relative to a second price for behind-the-meter power.
20. A non-transitory computer-readable medium configured to store instructions, that when executed by one or more processors, cause a control system to perform functions comprising: receiving information indicative of a plurality of power-generation economic signals; based on the received information, identifying at least one of: (i) a change indicative of a power-generation economic signal that exceeds a predefined threshold change, (ii) a power-generation economic signal that is below a predefined lower threshold limit, or (iii) a power-generation economic signal that is above a predefined upper threshold limit; and based on the identification, performing at least one of: (i) adjusting a rate of power use by a flexible datacenter, and (ii) determining and providing an indication of computation resource availability to a second control system, wherein the flexible datacenter comprises a behind-the-meter power input system, a power distribution system, and a plurality of computing systems configured to receive power from the behind-the-meter power input system via the power distribution system; wherein the adjusting a rate of power use by the flexible datacenter comprises ramping up, ramping down, or adjusting power consumption by at least one of the plurality of computing systems.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 11025060 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-09-14 (20 years from filing), a date not yet passed (data version 20261117.2).
- Basis
- term_20y (20 years from filing)
- Term end
- 2038-09-14 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 33 US patent documents · Cited by: 51 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11025060/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11025060 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| AU | 2019338540 | A1 | 2021-04-01 |
| CA | 3112037 | A1 | 2020-03-19 |
| EP | 3850463 | A1 | 2021-07-21 |
| EP | 3850463 | A4 | 2022-05-18 |
| WO | 2020056319 | A1 | 2020-03-19 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "11025060",
"status": "active",
"basis": [
"term_20y"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2038-09-14",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/11025060?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/11025060?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/11025060/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=11025060",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/11025060/ - Status record
/api/v1/lapse/status/11025060/ - Claim tree
/api/v1/structure/claims/11025060/ - Brief
/api/v1/structure/brief/11025060/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.