PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 11099956

Snapshot-based disaster recovery orchestration of virtual machine failover and failback operations

Granted 2021-08-24 · Filed 2020-03-26 · Application 16/831,562 · Utility · Kind B1

Assignee as printed
  • Commvault Systems, Inc., Tinton Falls, NJ (US)
Inventors
Rajesh Polimera, Freehold, NJ (US); Sarath Cheriyan Joseph, Eatontown, NJ (US); Kuldeep Kumar, Eatontown, NJ (US); Venkata Chalapathi Sucheth Ramgiri, Eatontown, NJ (US); Ashwin Gautamchand Sancheti, Marlboro, NJ (US); Madhumitha Mani, Campbell, CA (US); Henry Wallace Dornemann, Eatontown, NJ (US)
CPC, current
G06F11/2028; G06F11/2094; G06F9/45558; G06F11/1451; G06F11/1469; G06F11/2038; G06F11/2048; G06F11/2069; G06F2009/45583; G06F2201/815; G06F2201/82; G06F2201/84

Abstract

Snapshot-based disaster recovery (DR) orchestration systems and methods for virtual machine (VM) failover and failback do not require that VMs or their corresponding datastores be actively operating at the DR site before a DR orchestration job is initiated, i.e., before failover. An illustrative data storage management system deploys proprietary components at source data center(s) and at DR site(s). The proprietary components (e.g., storage manager, data agents, media agents, backup nodes, etc.) interoperate with each other and with the source and DR components to ensure that VMs will successfully failover and/or failback. DR orchestration jobs are suitable for testing VM failover scenarios (“clone testing”), for conducting planned VM failovers, and for unplanned VM failovers. DR orchestration jobs also handle failback and integration of DR-generated data into the failback site, including restoring VMs that never failed over to fully re-populate the source/failback site.

Claims

20 claims · independent 1, 8 and 15

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A data storage management system for orchestrating virtual machine failover, the system comprising:

  1. Claim 1, element e1a first computing device comprising one or more hardware processors and computer memory; 103–190
  2. Claim 1, element e2wherein the first computing device is configured to: 192–243
  3. Claim 1, element e3initiate a snapshot backup job by causing a primary data storage (i) to take a first snapshot of a first data storage volume hosting a first datastore for a first virtual machine, and (ii) to store the first snapshot at the primary data storage, 245–489
  4. Claim 1, element e4wherein the first virtual machine executes on a first virtual machine host computing device comprising one or more hardware processors, computer memory, and a hypervisor; 491–660
  5. Claim 1, element e5initiate an auxiliary copy job by causing the primary data storage to replicate the first snapshot to a failover data storage configured for disaster recovery, resulting in a second snapshot stored in a second data storage volume at the failover data storage, 662–920
  6. Claim 1, element e6wherein the primary data storage and the failover data storage have a mirror-relationship that enables replication of snapshots therebetween; 922–1062
  7. Claim 1, element e7initiate a disaster recovery orchestration job for the first virtual machine to fail over to a second virtual machine that is currently powered off, 1064–1211
  8. Claim 1, element e8wherein the first virtual machine is included in a failover group administered in the data storage management system, and wherein the failover group maps the first virtual machine to fail over to the second virtual machine, and wherein the first computing device is further configured to: 1213–1500
  9. Claim 1, element e9cause a failover virtualization manager to create, for the second virtual machine, a second datastore based on the second snapshot in a second data storage volume at the failover data storage; 1502–1693
  10. Claim 1, element e10cause the failover virtualization manager to cause a second virtual machine host computing device to power up the second virtual machine and to provide the second virtual machine with access to the second datastore at the failover data storage, 1695–1938
  11. Claim 1, element e11wherein the second virtual machine operates with data in the second datastore replicated from the first snapshot; and 1940–2052
  12. Claim 1, element e12wherein the data storage management system is configured to create the second datastore and to power up the second virtual machine with access to the second datastore on-demand after initiating the disaster recovery orchestration job.2058–2291
6 dependent claims: 2 to 7 (2, 3, 4, 5, 6 on claim 1; 7 on 6)

Claim 2

Depends on claim 1.

2. The system of claim 1 , wherein

  1. Claim 2, element e1the disaster recovery orchestration job is for an unplanned failover of the first virtual machine to the second virtual machine, based on using administrative settings in a storage manager that executes on the first computing device.35–267

Claim 3

Depends on claim 1.

3. The system of claim 1 , wherein

  1. Claim 3, element e1the disaster recovery orchestration job is initiated based on detecting a failure at one or more of: 35–134
  2. Claim 3, element e2(i) the first virtual machine host computing device, (ii) the primary data storage, and (iii) a first virtualization manager associated with the first virtual machine host computing device.140–324

Claim 4

Depends on claim 1.

4. The system of claim 1 , wherein

  1. Claim 4, element e1as part of the disaster recovery orchestration job, the first computing device is further configured to activate, on-demand, a data agent associated with the failover virtualization manager and a media agent associated with the failover data storage.35–284

Claim 5

Depends on claim 1.

5. The system of claim 1 , wherein

  1. Claim 5, element e1the first virtual machine executes in one of: 35–79
  2. Claim 5, element e2a first virtualized data center and a first cloud computing environment; and 81–152
  3. Claim 5, element e3wherein after the disaster recovery orchestration job, the second virtual machine executes in one of: 158–258
  4. Claim 5, element e4another distinct virtualized data center configured for disaster recovery and another cloud computing environment configured for disaster recovery.260–406

Claim 6

Depends on claim 1.

6. The system of claim 1 , wherein

  1. Claim 6, element e1the first computing device is further configured to: 35–86
  2. Claim 6, element e2initiate a second disaster recovery orchestration job that causes the second virtual machine to fail back to the first virtual machine, 88–222
  3. Claim 6, element e3wherein the second disaster recovery orchestration job causes a first virtualization manager to re-activate the first virtual machine and establishes in the primary data storage the first datastore of the re-activated first virtual machine based on a snapshot replicated from the failover data storage.224–525

Claim 7

Depends on claim 6.

7. The system of claim 6 , wherein

  1. Claim 7, element e1the first computing device is further configured to, while performing the second disaster recovery orchestration job: 35–151
  2. Claim 7, element e2determine that a third virtual machine not included in the failover group is powered off and did not fail over in the disaster recovery orchestration job for the first virtual machine; 153–336
  3. Claim 7, element e3identify a backup copy of the third virtual machine; and 338–389
  4. Claim 7, element e4initiate a restore job that restores the backup copy of the third virtual machine to a third datastore at the primary data storage and cause the first virtualization manager to re-activate the third virtual machine with access to the third datastore.395–644

Claim 8

Independent claim.

8. A method for orchestrating virtual machine failover, the method comprising:

  1. Claim 8, element e1by a data storage management system, initiating a disaster recovery orchestration job for a first virtual machine that is included in a failover group administered in the data storage management system, 79–280
  2. Claim 8, element e2wherein the disaster recovery orchestration job comprises: 282–339
  3. Claim 8, element e3powering off the first virtual machine having a corresponding first datastore in a primary data storage; 341–444
  4. Claim 8, element e4causing the primary data storage (i) to take a first snapshot of a first data storage volume hosting the first datastore, and (ii) to store the first snapshot at the primary data storage; 446–632
  5. Claim 8, element e5causing the primary data storage to replicate the first snapshot to a failover data storage configured for disaster recovery, resulting in a second snapshot stored in a second data storage volume at the failover data storage, 634–858
  6. Claim 8, element e6wherein the primary data storage and the failover data storage have a mirror-relationship that enables replication of snapshots therebetween; 860–1000
  7. Claim 8, element e7causing the mirror-relationship to break; 1002–1042
  8. Claim 8, element e8causing the failover data storage to bring the second data storage volume online; 1044–1124
  9. Claim 8, element e9causing a failover virtualization manager to create, for a second virtual machine that is powered off, a second datastore based on the second snapshot in the second data storage volume at the failover data storage; 1126–1339
  10. Claim 8, element e10causing the failover virtualization manager to register the second virtual machine with the failover virtualization manager; 1341–1464
  11. Claim 8, element e11causing the failover virtualization manager to cause a virtual machine host computing device to power up the second virtual machine and to provide the second virtual machine with access to the second datastore at the failover data storage, 1466–1704
  12. Claim 8, element e12wherein the second virtual machine operates with data in the second datastore replicated from the first snapshot; and 1706–1818
  13. Claim 8, element e13wherein the data storage management system is configured to create the second datastore and to power up the second virtual machine with access to the second datastore on-demand after initiating the disaster recovery orchestration job.1824–2057
6 dependent claims: 9 to 14 (9, 10, 11, 12 on claim 8; 13, 14 on 12)

Claim 9

Depends on claim 8.

9. The method of claim 8 , wherein

  1. Claim 9, element e1the disaster recovery orchestration job is for a planned failover of the first virtual machine to the second virtual machine, and wherein a storage manager initiates the disaster recovery orchestration job.35–240

Claim 10

Depends on claim 8.

10. The method of claim 8 , wherein

  1. Claim 10, element e1a first data agent instructs a first virtualization manager to power off the first virtual machine.36–134

Claim 11

Depends on claim 8.

11. The method of claim 8 , wherein

  1. Claim 11, element e1a first media agent associated with the primary data storage instructs the primary data storage to break the mirror-relationship to the failover data storage.36–193

Claim 12

Depends on claim 8.

12. The method of claim 8 , wherein

  1. Claim 12, element e1as part of the disaster recovery orchestration job, a storage manager that manages storage operations in the data storage management system activates a second data agent associated with the failover virtualization manager and further activates a second media agent associated with the failover data storage.36–342

Claim 13

Depends on claim 12.

13. The method of claim 12 , wherein

  1. Claim 13, element e1the second data agent and the second media agent execute on a backup node that comprises one or more hardware processors and computer memory, and wherein the backup node is communicatively coupled to the failover data storage and to the failover virtualization manager.37–305

Claim 14

Depends on claim 12.

14. The method of claim 12 , wherein

  1. Claim 14, element e1the second data agent and the second media agent execute on a backup node that comprises a virtual machine distinct from the second virtual machine, and wherein the backup node is communicatively coupled to the failover data storage and to the failover virtualization manager.37–312

Claim 15

Independent claim.

15. A method for orchestrating virtual machine failover, the method comprising:

  1. Claim 15, element e1by a storage manager that manages storage operations in a data storage management system, initiating a disaster recovery orchestration job for a first virtual machine that is included in a failover group administered at the storage manager, 80–319
  2. Claim 15, element e2wherein the disaster recovery orchestration job comprises: 321–378
  3. Claim 15, element e3powering off the first virtual machine having a corresponding first datastore in a primary data storage; 380–483
  4. Claim 15, element e4causing the primary data storage (i) to take a first snapshot of a first data storage volume hosting the first datastore, and (ii) to store the first snapshot at the primary data storage; 485–671
  5. Claim 15, element e5causing the primary data storage to replicate the first snapshot to a failover data storage configured for disaster recovery, resulting in a second snapshot stored in a second data storage volume at the failover data storage, 673–897
  6. Claim 15, element e6wherein the primary data storage and the failover data storage have a mirror-relationship that enables replication of snapshots therebetween; 899–1039
  7. Claim 15, element e7causing the mirror-relationship to break; 1041–1081
  8. Claim 15, element e8causing the failover data storage to bring the second data storage volume online; 1083–1163
  9. Claim 15, element e9causing a failover virtualization manager to create, for a second virtual machine that is powered off, a second datastore based on the second snapshot in the second data storage volume at the failover data storage; 1165–1378
  10. Claim 15, element e10causing the failover virtualization manager to register the second virtual machine with the failover virtualization manager; 1380–1503
  11. Claim 15, element e11causing the failover virtualization manager to cause a virtual machine host computing device to power up the second virtual machine and to provide the second virtual machine with access to the second datastore at the failover data storage, 1505–1743
  12. Claim 15, element e12wherein the second virtual machine operates with data in the second datastore replicated from the first snapshot; and 1745–1857
  13. Claim 15, element e13wherein the data storage management system is configured to create the second datastore and to power up the second virtual machine with access to the second datastore on-demand after initiating the disaster recovery orchestration job.1863–2096
5 dependent claims: 16 to 20 (16, 17, 18, 19 on claim 15; 20 on 19)

Claim 16

Depends on claim 15.

16. The method of claim 15 , wherein

  1. Claim 16, element e1the disaster recovery orchestration job is for a planned failover of the first virtual machine to the second virtual machine, based on using administrative settings in the storage manager.37–224

Claim 17

Depends on claim 15.

17. The method of claim 15 , wherein

  1. Claim 17, element e1as part of the disaster recovery orchestration job, the storage manager activates a second data agent associated with the failover virtualization manager and further activates a second media agent associated with the failover data storage; 37–275
  2. Claim 17, element e2wherein the second media agent instructs the failover data storage to bring the second data storage volume online for access by the second virtual machine; 277–431
  3. Claim 17, element e3wherein the second data agent instructs the failover virtualization manager to create the second datastore; and 433–539
  4. Claim 17, element e4wherein the second data agent further instructs the failover virtualization manager to power up the second virtual machine with access to the second datastore.545–703

Claim 18

Depends on claim 15.

18. The method of claim 15 , wherein

  1. Claim 18, element e1the data storage management system comprises a first data agent associated with a first virtualization manager that powers off the first virtual machine; 37–189
  2. Claim 18, element e2wherein the data storage management system comprises a first media agent associated with the primary data storage; 191–304
  3. Claim 18, element e3wherein the data storage management system comprises a second data agent associated with the failover virtualization manager; and 306–430
  4. Claim 18, element e4wherein the data storage management system comprises a second media agent associated with the failover data storage.436–551

Claim 19

Depends on claim 15.

19. The method of claim 15 further comprising:

  1. Claim 19, element e1by the storage manager, initiating a second disaster recovery orchestration job that causes the second virtual machine to fail back to the first virtual machine, 47–207
  2. Claim 19, element e2wherein the second disaster recovery orchestration job causes a first virtualization manager to re-activate the first virtual machine and establishes in the primary data storage the first datastore of the re-activated first virtual machine based on a snapshot replicated from the failover data storage.209–510

Claim 20

Depends on claim 19.

20. The method of claim 19 , wherein

  1. Claim 20, element e1the second disaster recovery orchestration job comprises: 37–93
  2. Claim 20, element e2by the storage manager, determining that a third virtual machine not included in the failover group administered at the storage manager is powered off and did not fail over in the disaster recovery orchestration job for the first virtual machine; 95–340
  3. Claim 20, element e3by the storage manager, identifying a backup copy of the third virtual machine; and 342–420
  4. Claim 20, element e4by the storage manager, initiating a restore job that restores the backup copy of the third virtual machine to a third datastore at the primary data storage and cause the first virtualization manager to re-activate the third virtual machine with access to the third datastore.426–701

Status

active

As of 2026-11-17, the USPTO record for US 11099956 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2040-03-26 (20 years from filing), a date not yet passed (data version 20261117.2).

Basis
term_20y (20 years from filing)
Term end
2040-03-26 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 124 US patent documents · Cited by: 50 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11099956/ (needs a free key, as the links under Get this as data)

Family outside the US

Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11099956",
 "status": "active",
 "basis": [
  "term_20y"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2040-03-26",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11099956?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11099956?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11099956/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11099956",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11099956?v=20261117.2

Data 20261117.2 · as of 2026-11-17