PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 11108587

Building management system with space graphs

Granted 2021-08-31 · Filed 2019-11-19 · Application 16/688,819 · Utility · Kind B2 · Prior publication US 2020/0092127 A1, 2020-03-19

Assignee as printed
  • Johnson Controls Tyco IP Holdings LLP, Milwaukee, WI (US)
Inventors
Youngchoon Park, Brookfield, WI (US); Sudhi R. Sinha, Milwaukee, WI (US)
CPC, current
H04L12/2827; G06F16/9024; H04L12/2809; H04L12/2812; H04L12/2832

Abstract

A building system for operating a building and managing building information causes one or more processors to receive building data from one or more building data sources, generate relationships between entities based on the building data, wherein the relationships comprises a pair of relationships between a first entity and a second entity of the entities representing two different types of relationships, wherein the pair of relationships comprises a first relationship between the first entity and the second entity and a second relationship between the second entity and the first entity, and update a space graph by causing the space graph to store nodes representing the entities and edges between the nodes representing the relationships, wherein the space graph is a graph data structure.

Claims

30 claims · independent 1, 12, 23 and 28

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A building system for operating a building and managing building information, the building system comprising

  1. Claim 1, element e1one or more memory devices configured to store instructions thereon, the instructions causing one or more processors to: 112–231
  2. Claim 1, element e2receive building data from one or more building data sources; 233–293
  3. Claim 1, element e3generate a plurality of relationships between a plurality of entities based on the building data, 295–391
  4. Claim 1, element e4wherein the plurality of relationships comprises a pair of relationships between a first entity and a second entity of the plurality of entities representing two different types of relationships, 393–587
  5. Claim 1, element e5wherein the pair of relationships comprises a first relationship between the first entity and the second entity and a second relationship between the second entity and the first entity; 589–773
  6. Claim 1, element e6update a space graph by causing the space graph to store a plurality of nodes representing the plurality of entities and a plurality of edges between the plurality of nodes representing the plurality of relationships, 775–991
  7. Claim 1, element e7wherein the space graph is a graph data structure; 993–1042
  8. Claim 1, element e8ingest data values of the building data, or a link to the data values, into the space graph, the data values associated with the plurality of entities; and 1044–1194
  9. Claim 1, element e9perform one or more operations with the space graph based on the data values ingested into the space graph.1200–1306
10 dependent claims: 2 to 11 (2, 3, 4, 6, 8, 10 on claim 1; 5 on 4; 7 on 6; 9 on 8; 11 on 10)

Claim 2

Depends on claim 1.

2. The building system of claim 1 , wherein

  1. Claim 2, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 2, element e2perform the one or more operations with the space graph based on both the plurality of relationships of the plurality of entities and the data values ingested into the space graph.98–277

Claim 3

Depends on claim 1.

3. The building system of claim 1 , wherein

  1. Claim 3, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 3, element e2receive new building data from the one or more building data sources; 98–166
  3. Claim 3, element e3generate, based on the new building data, a new relationship between the first entity and the second entity; and 168–275
  4. Claim 3, element e4update the space graph with the new relationship by causing the space graph to store a new edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity.281–528

Claim 4

Depends on claim 1.

4. The building system of claim 1 , wherein

  1. Claim 4, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 4, element e2receive a query for information of the space graph from a requesting device, 98–173
  3. Claim 4, element e3wherein the information is included by one of the plurality of nodes of the space graph; 175–262
  4. Claim 4, element e4retrieve the information from the space graph by traversing at least some of the plurality of entities and at least some of the plurality of edges to identify the information without traversing other entities or other relationships of a data structure other than the space graph; and 264–542
  5. Claim 4, element e5provide the information to the requesting device.548–596

Claim 5

Depends on claim 4.

5. The building system of claim 4 , wherein

  1. Claim 5, element e1the query comprises an indication of the at least some of the plurality of nodes and the at least some of the plurality of entities to traverse to identify the information.44–215

Claim 6

Depends on claim 1.

6. The building system of claim 1 , wherein

  1. Claim 6, element e1the instructions cause the one or more processors to generate a control algorithm based on the space graph and operate one or more pieces of building equipment based on the control algorithm.44–234

Claim 7

Depends on claim 6.

7. The building system of claim 6 , wherein

  1. Claim 7, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 7, element e2receive new building data from the one or more building data sources; 98–166
  3. Claim 7, element e3generate a new relationship between the first entity and the second entity; 168–242
  4. Claim 7, element e4update the space graph with the new relationship by causing the space graph to store a new edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity; and 244–491
  5. Claim 7, element e5update the control algorithm based on the new edge of the updated space graph and operate the one or more pieces of building equipment based on the updated control algorithm.497–670

Claim 8

Depends on claim 1.

8. The building system of claim 1 , wherein

  1. Claim 8, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 8, element e2receive new building data from the one or more building data sources; 98–166
  3. Claim 8, element e3generate a temporary relationship between the first entity and the second entity based on the new building data; 168–279
  4. Claim 8, element e4cause the space graph to include the temporary relationship by storing a temporary edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity; and 281–520
  5. Claim 8, element e5perform one or more control operations based on the space graph including the temporary edge.526–618

Claim 9

Depends on claim 8.

9. The building system of claim 8 , wherein

  1. Claim 9, element e1the instructions cause the one or more processors to: 44–96
  2. Claim 9, element e2receive additional new building data from the one or more building data sources, the additional new building data based on the one or more control operations based on the space graph including the temporary edge; 98–309
  3. Claim 9, element e3determine whether to generate a formal relationship to replace the temporary relationship based on the new building data; and 311–431
  4. Claim 9, element e4update the space graph by causing the formal relationship to replace the temporary relationship of the space graph in response to a determination to generate the formal relationship to replace the temporary relationship by causing a formal edge to replace the temporary edge.437–711

Claim 10

Depends on claim 1.

10. The building system of claim 1 , wherein

  1. Claim 10, element e1the instructions cause the one or more processors to: 45–97
  2. Claim 10, element e2receive new building data from the one or more building data sources; 99–167
  3. Claim 10, element e3identify, based on the building data, an indirect relationship between the first entity and the second entity of the space graph, the indirect relationship caused by a control algorithm of the space graph; and 169–373
  4. Claim 10, element e4update the space graph with the indirect relationship by causing the space graph to include an indirect relationship edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity.379–652

Claim 11

Depends on claim 10.

11. The building system of claim 10 , wherein

  1. Claim 11, element e1the instructions cause the one or more processors to: 46–98
  2. Claim 11, element e2update the control algorithm of the space graph based on the indirect relationship edge; and 100–187
  3. Claim 11, element e3operate one or more pieces of building equipment based on the updated control algorithm.193–280

Claim 12

Independent claim.

12. A method for a building system, the method comprising:

  1. Claim 12, element e1receiving, by a processing circuit, building data from one or more building data sources; 59–147
  2. Claim 12, element e2generating, by the processing circuit, a plurality of relationships between a plurality of entities based on the building data, 149–275
  3. Claim 12, element e3wherein the plurality of relationships comprises a pair of relationships between a first entity and a second entity of the plurality of entities representing two different types of relationships, 277–471
  4. Claim 12, element e4wherein the pair of relationships comprises a first relationship between the first entity and the second entity and a second relationship between the second entity and the first entity; 473–657
  5. Claim 12, element e5updating, by the processing circuit, a space graph by causing the space graph to store a plurality of nodes representing the plurality of entities and a plurality of edges between the plurality of nodes representing the plurality of relationships, 659–905
  6. Claim 12, element e6wherein the space graph is a graph data structure; 907–956
  7. Claim 12, element e7ingesting, by the processing circuit, data values of the building data, or a link to the data values, into the space graph, the data values associated with the plurality of entities; and 958–1139
  8. Claim 12, element e8performing, by the processing circuit, one or more operations with the space graph based on the data values ingested into the space graph.1145–1282
10 dependent claims: 13 to 22 (13, 14, 15, 17, 19, 21 on claim 12; 16 on 15; 18 on 17; 20 on 19; 22 on 21)

Claim 13

Depends on claim 12.

13. The method of claim 12 , wherein

  1. Claim 13, element e1performing, by the processing circuit, the one or more operations comprises performing the one or more operations based on both the plurality of relationships of the plurality of entities and the data values ingested into the space graph.37–274

Claim 14

Depends on claim 12.

14. The method of claim 12 , further comprising:

  1. Claim 14, element e1receiving, by the processing circuit, new building data from the one or more building data sources; 49–147
  2. Claim 14, element e2generating, by the processing circuit, based on the new building data, a new relationship between the first entity and the second entity; and 149–285
  3. Claim 14, element e3updating, by the processing circuit, the space graph with the new relationship by causing the space graph to store a new edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity.291–568

Claim 15

Depends on claim 12.

15. The method of claim 12 , further comprising:

  1. Claim 15, element e1receiving, by the processing circuit, a query for information of the space graph from a requesting device, 49–154
  2. Claim 15, element e2wherein the information is included by one of the plurality of nodes of the space graph; 156–243
  3. Claim 15, element e3retrieving, by the processing circuit, the information from the space graph by traversing at least some of the plurality of entities and at least some of the plurality of edges to identify the information without traversing other entities or other relationships of a data structure other than the space graph; and 245–553
  4. Claim 15, element e4providing, by the processing circuit, the information to the requesting device.559–637

Claim 16

Depends on claim 15.

16. The method of claim 15 , wherein

  1. Claim 16, element e1the query comprises an indication of the at least some of the plurality of nodes and the at least some of the plurality of entities to traverse to identify the information.37–208

Claim 17

Depends on claim 12.

17. The method of claim 12 , further comprising

  1. Claim 17, element e1generating, by the processing circuit, a control algorithm based on the space graph and operate one or more pieces of building equipment based on the control algorithm.48–215

Claim 18

Depends on claim 17.

18. The method of claim 17 , further comprising:

  1. Claim 18, element e1receiving, by the processing circuit, new building data from the one or more building data sources; 49–147
  2. Claim 18, element e2generating, by the processing circuit, a new relationship between the first entity and the second entity; 149–253
  3. Claim 18, element e3updating, by the processing circuit, the space graph with the new relationship by causing the space graph to store a new edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity; and 255–532
  4. Claim 18, element e4updating, by the processing circuit, the control algorithm based on the new edge of the updated space graph and operate the one or more pieces of building equipment based on the updated control algorithm.538–741

Claim 19

Depends on claim 12.

19. The method of claim 12 , further comprising:

  1. Claim 19, element e1receiving, by the processing circuit, new building data from the one or more building data sources; 49–147
  2. Claim 19, element e2generating, by the processing circuit, a temporary relationship between the first entity and the second entity based on the new building data; 149–290
  3. Claim 19, element e3causing, by the processing circuit, the space graph to include the temporary relationship by storing a temporary edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity; and 292–561
  4. Claim 19, element e4performing, by the processing circuit, one or more control operations based on the space graph including the temporary edge.567–690

Claim 20

Depends on claim 19.

20. The method of claim 19 , further comprising:

  1. Claim 20, element e1receiving, by the processing circuit, additional new building data from the one or more building data sources, the additional new building data based on the one or more control operations based on the space graph including the temporary edge; 49–290
  2. Claim 20, element e2determining, by the processing circuit, whether to generate a formal relationship to replace the temporary relationship based on the new building data; and 292–442
  3. Claim 20, element e3updating, by the processing circuit, the space graph by causing the formal relationship to replace the temporary relationship of the space graph in response to a determination to generate the formal relationship to replace the temporary relationship by causing a formal edge to replace the temporary edge.448–752

Claim 21

Depends on claim 12.

21. The method of claim 12 , further comprising:

  1. Claim 21, element e1receiving, by the processing circuit, new building data from the one or more building data sources; 49–147
  2. Claim 21, element e2identifying, by the processing circuit, based on the building data, an indirect relationship between the first entity and the second entity of the space graph, the indirect relationship caused by a control algorithm of the space graph; and 149–383
  3. Claim 21, element e3updating, by the processing circuit, the space graph with the indirect relationship by causing the space graph to include an indirect relationship edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity.389–692

Claim 22

Depends on claim 21.

22. The method of claim 21 , further comprising:

  1. Claim 22, element e1updating, by the processing circuit, the control algorithm of the space graph based on the indirect relationship edge; and 49–166
  2. Claim 22, element e2operating, by the processing circuit, one or more pieces of building equipment based on the updated control algorithm.172–289

Claim 23

Independent claim.

23. A building management system for operating a building and managing building information, the building management system comprising

  1. Claim 23, element e1one or more memory devices configured to store instructions thereon; and 135–202
  2. Claim 23, element e2one or more processors configured to execute the instructions to: 208–272
  3. Claim 23, element e3receive building data from one or more building data sources; 274–334
  4. Claim 23, element e4generate a plurality of relationships between a plurality of entities based on the building data, 336–432
  5. Claim 23, element e5wherein the plurality of relationships comprises a pair of relationships between a first entity and a second entity of the plurality of entities representing two different types of relationships, 434–628
  6. Claim 23, element e6wherein the pair of relationships comprises a first relationship between the first entity and the second entity and a second relationship between the second entity and the first entity; 630–814
  7. Claim 23, element e7update a space graph by causing the space graph to store a plurality of nodes representing the plurality of entities and a plurality of edges between the plurality of nodes representing the plurality of relationships, 816–1032
  8. Claim 23, element e8wherein the space graph is a graph data structure; 1034–1083
  9. Claim 23, element e9ingest data values of the building data into the space graph, the data values associated with the plurality of entities; and 1085–1204
  10. Claim 23, element e10perform one or more operations with the space graph based on both the plurality of relationships of the plurality of entities and the data values ingested into the space graph.1210–1385
4 dependent claims: 24 to 27 (24, 25, 27 on claim 23; 26 on 25)

Claim 24

Depends on claim 23.

24. The building management system of claim 23 , wherein

  1. Claim 24, element e1the one or more processors are configured to execute the instructions to: 57–129
  2. Claim 24, element e2receive new building data from the one or more building data sources; 131–199
  3. Claim 24, element e3generate, based on the new building data, a new relationship between the first entity and the second entity; and 201–308
  4. Claim 24, element e4update the space graph with the new relationship by causing the space graph to store a new edge between a first node of the plurality of nodes representing the first entity and a second node of the plurality of nodes representing the second entity.314–561

Claim 25

Depends on claim 23.

25. The building management system of claim 23 , wherein

  1. Claim 25, element e1the one or more processors are configured to execute the instructions to: 57–129
  2. Claim 25, element e2receive a query for information of the space graph from a requesting device, 131–206
  3. Claim 25, element e3wherein the information is included by one of the plurality of nodes of the space graph; 208–295
  4. Claim 25, element e4retrieve the information from the space graph by traversing at least some of the plurality of entities and at least some of the plurality of edges to identify the information without traversing other entities or other relationships of a data structure other than the space graph; and 297–575
  5. Claim 25, element e5provide the information to the requesting device.581–629

Claim 26

Depends on claim 25.

26. The building management system of claim 25 , wherein

  1. Claim 26, element e1the query comprises an indication of the at least some of the plurality of nodes and the at least some of the plurality of entities to traverse to identify the information.57–228

Claim 27

Depends on claim 23.

27. The building management system of claim 23 , wherein

  1. Claim 27, element e1the one or more processors are configured to execute the instructions to generate a control algorithm based on the space graph and operate one or more pieces of building equipment based on the control algorithm.57–267

Claim 28

Independent claim.

28. An information management system comprising

  1. Claim 28, element e1a processing circuit configured to: 48–82
  2. Claim 28, element e2receive building data from one or more building data sources; 84–144
  3. Claim 28, element e3generate a plurality of relationships between a plurality of entities based on the building data, 146–242
  4. Claim 28, element e4wherein the plurality of relationships comprises a pair of relationships between a first entity and a second entity of the plurality of entities representing two different types of relationships, 244–438
  5. Claim 28, element e5wherein the pair of relationships comprises a first relationship between the first entity and the second entity and a second relationship between the second entity and the first entity; and 440–624
  6. Claim 28, element e6generate or update a digital twin of a building by causing the digital twin to indicate the plurality of entities and the plurality of relationships.630–778
2 dependent claims: 29 and 30 (29, 30 on claim 28)

Claim 29

Depends on claim 28.

29. The information management system of claim 28 , wherein

  1. Claim 29, element e1the digital twin is at least one of: 60–95
  2. Claim 29, element e2a three dimensional data structure comprising data graphically representing the building; or 97–185
  3. Claim 29, element e3a graph data structure comprising a plurality of nodes representing the plurality of entities and a plurality of edges between the plurality of nodes representing the plurality of relationships.190–383

Claim 30

Depends on claim 28.

30. The information management system of claim 28 , wherein

  1. Claim 30, element e1the digital twin is a graph data structure; 60–102
  2. Claim 30, element e2wherein the processing circuit is configured to: 104–151
  3. Claim 30, element e3ingest data values of the building data into the graph data structure, the data values associated with the plurality of entities; and 153–281
  4. Claim 30, element e4perform one or more operations with the graph data structure based on both the plurality of relationships of the plurality of entities and the data values ingested into the graph data structure.287–480

Status

active

As of 2026-11-17, the USPTO record for US 11108587 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record, leaving out a terminal disclaimer it shows without a date, is 2037-07-07 (20 years from the filing of a parent application on 2017-07-07), a date not yet passed; that disclaimer can only make the term end earlier (data version 20261117.2).

Basis
term_20y · terminal_disclaimer (20 years from the filing of a parent application on 2017-07-07, a terminal disclaimer on record without a date, which can only make the term end earlier than the date computed from the other dates)
Term end
2037-07-07 Computed from the dates in the USPTO recordThis date leaves out a terminal disclaimer on record that has no date; that disclaimer can only make the term end earlier.
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 21 US patent documents · Cited by: 147 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11108587/ (needs a free key, as the links under Get this as data)

Family outside the US

Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11108587",
 "status": "active",
 "basis": [
  "term_20y",
  "terminal_disclaimer"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2037-07-07",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11108587?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11108587?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11108587/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11108587",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11108587?v=20261117.2

Data 20261117.2 · as of 2026-11-17