PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 11173597

Systems and methods for controlling a robotic manipulator or associated tool

Granted 2021-11-16 · Filed 2018-11-09 · Application 16/185,867 · Utility · Kind B2 · Prior publication US 2019/0143506 A1, 2019-05-16

Assignee as printed
  • INTUITIVE SURGICAL OPERATIONS, INC., Sunnyvale, TX (US)
Inventors
Dinesh Rabindran, Cupertino, CA (US); Simon P. DiMaio, Redwood City, CA (US); Kollin M. Tierling, Los Altos, CA (US)
CPC, current
B25J9/1607; A61B34/35; A61B34/37; B25J3/04; B25J9/06; B25J9/163; B25J9/1641; B25J9/1689; G05B19/00; A61B2034/2048; A61B2034/2051; A61B2034/2055; A61B2034/2059; A61B2034/2061; A61B2090/371; B25J9/1694; G05B2219/37388

Abstract

A system includes a robotic manipulator including a serial chain comprising a first joint, a first link, and a second link. The second link is between the first joint and the first link in the serial chain. The system further includes a processing unit including one or more processors. The processing unit is configured to receive first link data from a first sensor system located at the first link, generate a first joint state estimate of the first joint based on the first link data and a kinematic model of the robotic manipulator, and control the first joint based on the first joint state estimate.

Claims

26 claims · independent 1, 9, 16 and 21

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A system comprising:

  1. Claim 1, element e1a robotic manipulator including a serial chain comprising a first joint, a first link, and a second link, 24–128
  2. Claim 1, element e2wherein the second link is between the first joint and the first link in the serial chain; 130–219
  3. Claim 1, element e3a processing unit including one or more processors, the processing unit configured to: 221–306
  4. Claim 1, element e4receive first link data from a first sensor system located at the first link; 308–384
  5. Claim 1, element e5generate a first joint state estimate of the first joint based on the first link data and a kinematic model of the robotic manipulator; 386–520
  6. Claim 1, element e6control the first joint based on the first joint state estimate; and 522–585
  7. Claim 1, element e7control a second joint in the serial chain based on the first link data.591–662
7 dependent claims: 2 to 8 (2, 3, 4, 5, 8 on claim 1; 6, 7 on 5)

Claim 2

Depends on claim 1.

2. The system of claim 1 , wherein

  1. Claim 2, element e1to generate the first joint state estimate, the processing unit is configured to: 35–115
  2. Claim 2, element e2determine a Jacobian of the first sensor system based on the kinematic model of the robotic manipulator; and 117–220
  3. Claim 2, element e3generate the first joint state estimate based on the first link data and the Jacobian.226–311

Claim 3

Depends on claim 1.

3. The system of claim 1 , wherein

  1. Claim 3, element e1the first joint state estimate includes a joint acceleration estimate.35–104

Claim 4

Depends on claim 1.

4. The system of claim 1 , wherein

  1. Claim 4, element e1the first link data includes angular velocity data and translational acceleration data of the first sensor system.35–148

Claim 5

Depends on claim 1.

5. The system of claim 1 wherein

  1. Claim 5, element e1the serial chain further includes a third link, 33–79
  2. Claim 5, element e2wherein the processing unit is further configured to: 81–133
  3. Claim 5, element e3receive second link data from a second sensor system located at the third link; and 135–213
  4. Claim 5, element e4generate a second joint state estimate of the first joint based on the second link data, and wherein to control the first joint, the processing unit is configured to: 219–384
  5. Claim 5, element e5control the first joint based on the first joint state estimate and second joint state estimate.386–481

Claim 6

Depends on claim 5.

6. The system of claim 5 , wherein

  1. Claim 6, element e1the serial chain includes a fourth link, and wherein the fourth link is between the first joint and the third link in the serial chain.35–169

Claim 7

Depends on claim 5.

7. The system of claim 5 , wherein

  1. Claim 7, element e1to generate the first joint state estimate, the processing unit is configured to: 35–115
  2. Claim 7, element e2apply a first weight to the first joint state estimate to generate a weighted first joint state estimate; 117–221
  3. Claim 7, element e3apply a second weight to the second joint state estimate to generate a weighted second joint state estimate; and 223–330
  4. Claim 7, element e4combine the weighted first joint state estimate and the weighted second joint state estimate to generate a first fused joint state estimate of the first joint, and wherein to control the first joint, the processing unit is configured to: 336–572
  5. Claim 7, element e5control the first joint based on the first fused joint state estimate.574–643

Claim 8

Depends on claim 1.

8. The system of claim 1 , wherein

  1. Claim 8, element e1the processing unit is further configured to: 35–79
  2. Claim 8, element e2generate a joint state estimate of the second joint based on the first link data; and 81–161
  3. Claim 8, element e3control the second joint based on the joint state estimate of the second joint.167–245

Claim 9

Independent claim.

9. A system comprising:

  1. Claim 9, element e1a robotic manipulator comprising: 24–56
  2. Claim 9, element e2a first link; 58–70
  3. Claim 9, element e3a second link; and 72–85
  4. Claim 9, element e4a first section between the first and second links, the first section including a first joint, a third link, and a second joint, 91–218
  5. Claim 9, element e5wherein the first joint connects the first link and the third link, and the second joint connects the third link and the second link; 220–352
  6. Claim 9, element e6a processing unit including one or more processors, the processing unit configured to: 354–439
  7. Claim 9, element e7receive first link data from a first sensor system located at the first link; 441–517
  8. Claim 9, element e8receive second link data from a second sensor system located at the second link; 519–598
  9. Claim 9, element e9generate a first section state estimate of the first section based on the first link data and second link data; and 600–710
  10. Claim 9, element e10control the first section based on the first section state estimate.716–783
6 dependent claims: 10 to 15 (10, 13 on claim 9; 11, 12 on 10; 14 on 13; 15 on 14)

Claim 10

Depends on claim 9.

10. The system of claim 9 , wherein

  1. Claim 10, element e1to generate the first section state estimate, the processing unit is configured to: 36–118
  2. Claim 10, element e2generate differential link data of the second link with respect to the first link based on the first link data and the second link data; and 120–255
  3. Claim 10, element e3generate the first section state estimate based on the differential link data.261–338

Claim 11

Depends on claim 10.

11. The system of claim 10 , wherein

  1. Claim 11, element e1to generate the first section state estimate, the processing unit is configured to: 37–119
  2. Claim 11, element e2determine a Jacobian of the second sensor system with regard to the first sensor system based on a kinematic model of the first link, the second link and the first section; and 121–292
  3. Claim 11, element e3generate the first section state estimate based on the differential link data and the Jacobian.298–392

Claim 12

Depends on claim 10.

12. The system of claim 10 , wherein

  1. Claim 12, element e1the first link data includes first angular velocity data and first translational acceleration data of the first sensor system; 37–162
  2. Claim 12, element e2wherein the second link data includes second angular velocity data and second translational acceleration data of the second sensor system; and 164–301
  3. Claim 12, element e3wherein to generate the differential link data, the processing unit is configured to: 307–391
  4. Claim 12, element e4generate differential translational acceleration data of the differential link data based on the first translational acceleration data and second translational acceleration data; and 393–570
  5. Claim 12, element e5generate differential angular velocity data of the differential link data based on the first angular velocity data and second angular velocity data.576–723

Claim 13

Depends on claim 9.

13. The system of claim 9 , wherein

  1. Claim 13, element e1to generate the first section state estimate, the processing unit is configured to: 36–118
  2. Claim 13, element e2generate the first section state estimate based on a first dynamic model of the first joint.120–211

Claim 14

Depends on claim 13.

14. The system of claim 13 , wherein

  1. Claim 14, element e1the first section state estimate includes a first joint state estimate of the first joint and a second joint state estimate of the second joint, and wherein to generate the first section state estimate, the processing unit is configured to: 37–276
  2. Claim 14, element e2generate an initial first joint state estimate by solving forward dynamics based on a first force on the first joint and the first dynamic model; 278–422
  3. Claim 14, element e3generate an initial second joint state estimate by solving forward dynamics based on a second force on the second joint and a second dynamic model of the second joint; 424–590
  4. Claim 14, element e4determine a third link state estimate of the third link based on the first link data, initial first joint state estimate, second link data, and initial second joint state estimate; 592–771
  5. Claim 14, element e5determine the first joint state estimate based on the third link state estimate and the first link data; and 773–876
  6. Claim 14, element e6determine the second joint state estimate based on the third link state estimate and the second link data.882–987

Claim 15

Depends on claim 14.

15. The system of claim 14 , wherein

  1. Claim 15, element e1to generate the third link state estimate of the third link, the processing unit is configured to: 37–134
  2. Claim 15, element e2determine a forward third link state estimate of the third link by forward propagating kinematics based on the first link data and the initial first joint state estimate; 136–305
  3. Claim 15, element e3determine a backward third link state estimate of the third link by backward propagating kinematics based on the second link data and the initial second joint state estimate; and 307–480
  4. Claim 15, element e4generate the third link state estimate of the third link based on the forward third link state estimate and backward third link state estimate.486–628

Claim 16

Independent claim.

16. A method comprising:

  1. Claim 16, element e1receiving first link data from a first sensor system located at a first link of a robotic manipulator including a serial chain comprising a first joint, the first link, and a second link, 25–211
  2. Claim 16, element e2wherein the second link is between the first joint and the first link in the serial chain; 213–302
  3. Claim 16, element e3generating a first joint state estimate of the first joint based on the first link data and a kinematic model of the robotic manipulator; 304–440
  4. Claim 16, element e4controlling the first joint based on the first joint state estimate; and 442–509
  5. Claim 16, element e5controlling a second joint in the serial chain based on the first link data.515–590
4 dependent claims: 17 to 20 (17, 20 on claim 16; 18, 19 on 17)

Claim 17

Depends on claim 16.

17. The method of claim 16 , further comprising:

  1. Claim 17, element e1receiving second link data from a second sensor system located at a third link in the serial chain; and 49–147
  2. Claim 17, element e2generating a second joint state estimate of the first joint based on the second link data; 153–242
  3. Claim 17, element e3wherein the controlling the first joint includes: 244–292
  4. Claim 17, element e4controlling the first joint based on the first joint state estimate and second joint state estimate.294–393

Claim 18

Depends on claim 17.

18. The method of claim 17 , wherein

  1. Claim 18, element e1the serial chain includes a fourth link, and wherein the fourth link is between the first joint and the third link in the serial chain.37–171

Claim 19

Depends on claim 17.

19. The method of claim 17 , wherein

  1. Claim 19, element e1the generating the first joint state estimate includes: 37–91
  2. Claim 19, element e2applying a first weight to the first joint state estimate to generate a weighted first joint state estimate; 93–200
  3. Claim 19, element e3applying a second weight to the second joint state estimate to generate a weighted second joint state estimate; and 202–312
  4. Claim 19, element e4combining the weighted first joint state estimate and the weighted second joint state estimate to generate a first fused joint state estimate of the first joint; 318–478
  5. Claim 19, element e5wherein the controlling the first joint includes: 480–528
  6. Claim 19, element e6controlling the first joint based on the first fused joint state estimate.530–603

Claim 20

Depends on claim 16.

20. The method of claim 16 , further comprising:

  1. Claim 20, element e1generating a joint state estimate of the second joint based on the first link data; and 49–131
  2. Claim 20, element e2controlling the second joint based on the joint state estimate of the second joint.137–219

Claim 21

Independent claim.

21. A method comprising:

  1. Claim 21, element e1receiving first link data from a first sensor system located at a first link in a robotic manipulator, 25–126
  2. Claim 21, element e2wherein the robotic manipulator includes the first link, a second link, and a first section between the first and second links, 128–254
  3. Claim 21, element e3wherein the first section includes a first joint, a third link, and a second joint, and wherein the first joint connects the first link and the third link, and the second joint connects the third link and the second link; 256–476
  4. Claim 21, element e4receiving second link data from a second sensor system located at the second link; 478–559
  5. Claim 21, element e5generating a first section state estimate of the first section based on the first link data and second link data; and 561–673
  6. Claim 21, element e6controlling the first section based on the first section state estimate.679–750
5 dependent claims: 22 to 26 (22, 25 on claim 21; 23, 24 on 22; 26 on 25)

Claim 22

Depends on claim 21.

22. The method of claim 21 , wherein

  1. Claim 22, element e1the generating the first section state estimate includes: 37–93
  2. Claim 22, element e2generating differential link data of the second link with respect to the first link based on the first link data and the second link data; and 95–232
  3. Claim 22, element e3generating the first section state estimate based on the differential link data.238–317

Claim 23

Depends on claim 22.

23. The method of claim 22 , wherein

  1. Claim 23, element e1the generating the first section state estimate includes: 37–93
  2. Claim 23, element e2determining a Jacobian of the second sensor system with regard to the first sensor system based on a kinematic model of the first link, the second link and the first section; and 95–268
  3. Claim 23, element e3generating the first section state estimate based on the differential link data and the Jacobian.274–370

Claim 24

Depends on claim 22.

24. The method of claim 22 , wherein

  1. Claim 24, element e1the first link data includes first angular velocity data and first translational acceleration data of the first sensor system; 37–162
  2. Claim 24, element e2wherein the second link data includes second angular velocity data and second translational acceleration data of the second sensor system; and 164–301
  3. Claim 24, element e3wherein the generating the differential link data includes: 307–365
  4. Claim 24, element e4generating differential translational acceleration data of the differential link data based on the first translational acceleration data and second translational acceleration data; and 367–546
  5. Claim 24, element e5generating differential angular velocity data of the differential link data based on the first angular velocity data and second angular velocity data.552–701

Claim 25

Depends on claim 21.

25. The method of claim 21 , wherein

  1. Claim 25, element e1the generating the first section state estimate includes generating the first section state estimate based on a first dynamic model of the first joint; 37–187
  2. Claim 25, element e2wherein the first section state estimate includes a first joint state estimate of the first joint and a second joint state estimate of the second joint; and 189–340
  3. Claim 25, element e3wherein the generating the first section state estimate includes: 346–410
  4. Claim 25, element e4generating an initial first joint state estimate by solving forward dynamics based on a first force on the first joint and the first dynamic model; 412–558
  5. Claim 25, element e5generating an initial second joint state estimate by solving forward dynamics based on a second force on the second joint and a second dynamic model of the second joint; 560–728
  6. Claim 25, element e6determining a third link state estimate of the third link based on the first link data, initial first joint state estimate, second link data, and initial second joint state estimate; 730–911
  7. Claim 25, element e7determining the first joint state estimate based on the third link state estimate and the first link data; and 913–1018
  8. Claim 25, element e8determining the second joint state estimate based on the third link state estimate and the second link data.1024–1131

Claim 26

Depends on claim 25.

26. The method of claim 25 , wherein

  1. Claim 26, element e1the generating the third link state estimate of the third link includes: 37–108
  2. Claim 26, element e2determining a forward third link state estimate of the third link by forward propagating kinematics based on the first link data and the initial first joint state estimate; 110–281
  3. Claim 26, element e3determining a backward third link state estimate of the third link by backward propagating kinematics based on the second link data and the initial second joint state estimate; and 283–458
  4. Claim 26, element e4generating the third link state estimate of the third link based on the forward third link state estimate and backward third link state estimate.464–608

Status

active

As of 2026-11-17, the USPTO record for US 11173597 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2039-09-18 (20 years from filing, plus 313 days of patent term adjustment), a date not yet passed (data version 20261117.2).

Basis
term_20y · pta_days:313 (20 years from filing, plus 313 days of patent term adjustment)
Term end
2039-09-18 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 11 US patent documents · Cited by: 62 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11173597/ (needs a free key, as the links under Get this as data)

Family outside the US

Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11173597",
 "status": "active",
 "basis": [
  "term_20y",
  "pta_days:313"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2039-09-18",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11173597?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11173597?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11173597/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11173597",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11173597?v=20261117.2

Data 20261117.2 · as of 2026-11-17