US 11377943
Wellbore hydraulic fracturing through a common pumping source
Granted 2022-07-05 · Filed 2020-05-28 · Application 16/886,123 · Utility · Kind B2 · Prior publication US 2021/0010363 A1, 2021-01-14
- Assignee as printed
- Halliburton Energy Services, Inc., Houston, TX (US)
- Inventors
- Oscar Andres Cabada Kriebel, Houston, TX (US); Kurt Harpold, Kingwood, TX (US); Ronald Glen Dusterhoft, Katy, TX (US); Jonathan P. Smith, Katy, TX (US); Ubong Inyang, Humble, TX (US)
- CPC, current
- E21B43/2607; E21B21/08; E21B43/116; E21B43/26; E21B43/267; F04B13/02; F04B15/02; F04B23/04; F04B49/007; F04B49/065; E21B43/14
Abstract
Aspects of the subject technology relate to systems and methods for pumping multiple wellbores from a common pumping source. A fluid pump of known operating pump capacity can be selected. The pump can be fluidly connected to a common pumping source that is fluidly connected with each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores. Each of the plurality of wellbores can have at least one perforation through a casing of the wellbore with a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation. Further, the wellbores can be configured so that the common pumping source provides fracturing fluid to each of the perforations within the known rate range of the respective perforation to successfully fracture the subterranean formation.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A method for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the method comprising:
- Claim 1, element e1selecting a fluid pump of known operating pump capacity, 168–223
- Claim 1, element e2wherein the operating pump capacity is measurable in barrels per minute; 225–296
- Claim 1, element e3fluidly connecting the pump to a common pumping source that is fluidly connected with each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, 298–513
- Claim 1, element e4wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and 515–840
- Claim 1, element e5configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of the of the fluid pump, so that the common pumping source: 846–1076
- Claim 1, element e6concurrently provides fracturing fluid to each of the wellbores; and 1078–1141
- Claim 1, element e7concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.1147–1360
9 dependent claims: 2 to 10 (2, 3, 9 on claim 1; 4, 5, 6, 7, 8 on 3; 10 on 9)
Claim 2
Depends on claim 1.
2. The method as recited in claim 1 , wherein
- Claim 2, element e1the common pumping source is a reservoir, tank or manifold that receives pumped fluid from the pump and supplies pumped fluid to the plurality of wellbores.46–201
Claim 3
Depends on claim 1.
3. The method as recited in claim 1 , further comprising:
- Claim 3, element e1mixing a plurality of separately pumped fluid streams at or near a head of each of the wellbores and thereby providing a mixed fluid stream into the wellbore, the streams comprising: 58–239
- Claim 3, element e2(i) a liquid-phase-only fluid stream and (ii) a solids-laden fluid stream.245–314
Claim 4
Depends on claim 3.
4. The method as recited in claim 3 , wherein
- Claim 4, element e1the solids-laden fluid stream comprises about eight pounds of solids per gallon of liquid.46–135
Claim 5
Depends on claim 3.
5. The method as recited in claim 3 , wherein
- Claim 5, element e1solids in the solids-laden fluid stream comprise proppant.46–103
Claim 6
Depends on claim 3.
6. The method as recited in claim 3 , wherein
- Claim 6, element e1a proportion at which the solids-laden fluid stream is admixed with the liquid-phase-only fluid stream is less than (i) 1-to-2, (ii) 1-to-3, (iii) 1-to-4, or (iv) 1-to-5.46–215
Claim 7
Depends on claim 3.
7. The method as recited in claim 3 , further comprising:
- Claim 7, element e1admixing a solids-suspension-assistance additive to the mixed fluid stream thereby maintaining proppant suspension in the mixed fluid stream from the corresponding head of each of the wellbores to one or more target perforations.58–286
Claim 8
Depends on claim 3.
8. The method as recited in claim 3 , wherein
- Claim 8, element e1solids in the solids-laden fluid stream comprise proppant and a concentration and type of proppant is matched with a concentration and type of a solids suspending agent thereby assuring that the proppant remains in suspension in the mixed fluid stream from the corresponding head of each of the wellbores to one or more target perforations.46–385
Claim 9
Depends on claim 1.
9. The method as recited in claim 1 , wherein
- Claim 9, element e1the pump is operated in a damage avoidance mode while operating to pump fracturing fluid from the common pumping source to fracture the subterranean formation.46–204
Claim 10
Depends on claim 9.
10. The method as recited in claim 9 , wherein
- Claim 10, element e1operation of the pump in the damage avoidance mode at either or both: 47–115
- Claim 10, element e2(i) a fluid velocity at about or below an erosion-inducing value associated with components of the pump and (ii) a fluid pressure at about or below a fatigue-inducing value associated with the fluid end of the pump.121–331
Claim 11
Independent claim.
11. A method for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the method comprising:
- Claim 11, element e1selecting a plurality of fluid pumps, each having a known operating pump capacity, 169–250
- Claim 11, element e2wherein the operating pump capacity is measurable in barrels per minute; 252–323
- Claim 11, element e3fluidly connecting the pumps to a common pumping source that is fluidly connected with each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, 325–541
- Claim 11, element e4wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and 543–868
- Claim 11, element e5configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of each of the of the fluid pumps, so that the common pumping source: 874–1113
- Claim 11, element e6concurrently provides fracturing fluid to each of the wellbores; and 1115–1178
- Claim 11, element e7concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.1184–1397
8 dependent claims: 12 to 19 (12, 13, 19 on claim 11; 14, 15, 16, 17, 18 on 13)
Claim 12
Depends on claim 11.
12. The method as recited in claim 11 , wherein
- Claim 12, element e1the common pumping source is a reservoir, tank or manifold that receives pumped fluid from the plurality of pumps and supplies pumped fluid to the plurality of wellbores.48–217
Claim 13
Depends on claim 11.
13. The method as recited in claim 11 , further comprising:
- Claim 13, element e1mixing a plurality of separately pumped fluid streams at or near a head of each of the wellbores and thereby providing a mixed fluid stream into the wellbore, the streams comprising: 60–241
- Claim 13, element e2(i) a liquid-phase-only fluid stream and (ii) a solids-laden fluid stream.247–316
Claim 14
Depends on claim 13.
14. The method as recited in claim 13 , wherein
- Claim 14, element e1the solids-laden fluid stream comprises about eight pounds of solids per gallon of liquid.48–137
Claim 15
Depends on claim 13.
15. The method as recited in claim 13 , wherein
- Claim 15, element e1solids in the solids-laden fluid stream comprise proppant.48–105
Claim 16
Depends on claim 13.
16. The method as recited in claim 13 , wherein
- Claim 16, element e1a proportion at which the solids-laden fluid stream is admixed with the liquid-phase-only fluid stream is less than (i) 1-to-2, (ii) 1-to-3, (iii) 1-to-4, or (iv) 1-to-5.48–217
Claim 17
Depends on claim 13.
17. The method as recited in claim 13 , further comprising:
- Claim 17, element e1admixing a solids-suspension-assistance additive to the mixed fluid stream thereby maintaining proppant suspension in the mixed fluid stream from the corresponding head of each of the wellbores to all one or more target perforations.60–292
Claim 18
Depends on claim 13.
18. The method as recited in claim 13 , wherein
- Claim 18, element e1solids in the solids-laden fluid stream comprise proppant and a concentration and type of proppant is matched with a concentration and type of a solids suspending agent thereby assuring that the proppant remains in suspension in the mixed fluid stream the corresponding head of each of the wellbores to one or more target perforations.48–382
Claim 19
Depends on claim 11.
19. The method as recited in claim 11 , wherein
- Claim 19, element e1the plurality of pumps are operated in a damage avoidance mode while operating to pump fracturing fluid from the common pumping source to fracture the subterranean formation.48–221
Claim 20
Independent claim.
20. A system for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the system comprising:
- Claim 20, element e1one or more fluid pumps having a known pump capacity, 169–221
- Claim 20, element e2wherein the operating pump capacity is measurable in barrels per minute; 223–294
- Claim 20, element e3a common pumping source that is fluidly connected with the one or more fluid pumps and each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, 296–512
- Claim 20, element e4wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and 514–839
- Claim 20, element e5configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of each of the one or more fluid pumps, so that the common pumping source: 845–1089
- Claim 20, element e6concurrently provides fracturing fluid to each of the wellbores; and 1091–1154
- Claim 20, element e7concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.1160–1373
1. A method for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the method comprising: selecting a fluid pump of known operating pump capacity, wherein the operating pump capacity is measurable in barrels per minute; fluidly connecting the pump to a common pumping source that is fluidly connected with each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of the of the fluid pump, so that the common pumping source: concurrently provides fracturing fluid to each of the wellbores; and concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.
2. The method as recited in claim 1 , wherein the common pumping source is a reservoir, tank or manifold that receives pumped fluid from the pump and supplies pumped fluid to the plurality of wellbores.
3. The method as recited in claim 1 , further comprising: mixing a plurality of separately pumped fluid streams at or near a head of each of the wellbores and thereby providing a mixed fluid stream into the wellbore, the streams comprising: (i) a liquid-phase-only fluid stream and (ii) a solids-laden fluid stream.
4. The method as recited in claim 3 , wherein the solids-laden fluid stream comprises about eight pounds of solids per gallon of liquid.
5. The method as recited in claim 3 , wherein solids in the solids-laden fluid stream comprise proppant.
6. The method as recited in claim 3 , wherein a proportion at which the solids-laden fluid stream is admixed with the liquid-phase-only fluid stream is less than (i) 1-to-2, (ii) 1-to-3, (iii) 1-to-4, or (iv) 1-to-5.
7. The method as recited in claim 3 , further comprising: admixing a solids-suspension-assistance additive to the mixed fluid stream thereby maintaining proppant suspension in the mixed fluid stream from the corresponding head of each of the wellbores to one or more target perforations.
8. The method as recited in claim 3 , wherein solids in the solids-laden fluid stream comprise proppant and a concentration and type of proppant is matched with a concentration and type of a solids suspending agent thereby assuring that the proppant remains in suspension in the mixed fluid stream from the corresponding head of each of the wellbores to one or more target perforations.
9. The method as recited in claim 1 , wherein the pump is operated in a damage avoidance mode while operating to pump fracturing fluid from the common pumping source to fracture the subterranean formation.
10. The method as recited in claim 9 , wherein operation of the pump in the damage avoidance mode at either or both: (i) a fluid velocity at about or below an erosion-inducing value associated with components of the pump and (ii) a fluid pressure at about or below a fatigue-inducing value associated with the fluid end of the pump.
11. A method for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the method comprising: selecting a plurality of fluid pumps, each having a known operating pump capacity, wherein the operating pump capacity is measurable in barrels per minute; fluidly connecting the pumps to a common pumping source that is fluidly connected with each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of each of the of the fluid pumps, so that the common pumping source: concurrently provides fracturing fluid to each of the wellbores; and concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.
12. The method as recited in claim 11 , wherein the common pumping source is a reservoir, tank or manifold that receives pumped fluid from the plurality of pumps and supplies pumped fluid to the plurality of wellbores.
13. The method as recited in claim 11 , further comprising: mixing a plurality of separately pumped fluid streams at or near a head of each of the wellbores and thereby providing a mixed fluid stream into the wellbore, the streams comprising: (i) a liquid-phase-only fluid stream and (ii) a solids-laden fluid stream.
14. The method as recited in claim 13 , wherein the solids-laden fluid stream comprises about eight pounds of solids per gallon of liquid.
15. The method as recited in claim 13 , wherein solids in the solids-laden fluid stream comprise proppant.
16. The method as recited in claim 13 , wherein a proportion at which the solids-laden fluid stream is admixed with the liquid-phase-only fluid stream is less than (i) 1-to-2, (ii) 1-to-3, (iii) 1-to-4, or (iv) 1-to-5.
17. The method as recited in claim 13 , further comprising: admixing a solids-suspension-assistance additive to the mixed fluid stream thereby maintaining proppant suspension in the mixed fluid stream from the corresponding head of each of the wellbores to all one or more target perforations.
18. The method as recited in claim 13 , wherein solids in the solids-laden fluid stream comprise proppant and a concentration and type of proppant is matched with a concentration and type of a solids suspending agent thereby assuring that the proppant remains in suspension in the mixed fluid stream the corresponding head of each of the wellbores to one or more target perforations.
19. The method as recited in claim 11 , wherein the plurality of pumps are operated in a damage avoidance mode while operating to pump fracturing fluid from the common pumping source to fracture the subterranean formation.
20. A system for conducting a hydraulic fracturing job on a plurality of wellbores in a subterranean formation utilizing a common pumping source, the system comprising: one or more fluid pumps having a known pump capacity, wherein the operating pump capacity is measurable in barrels per minute; a common pumping source that is fluidly connected with the one or more fluid pumps and each of a plurality of cased wellbores in a subterranean formation for providing pumped fracturing fluid to each of the wellbores, wherein each of the plurality of wellbores has at least one perforation through a casing of the wellbore and each perforation has a known rate range within which fracturing fluid is required to be provided to the perforation to successfully fracture the subterranean formation outside the perforation, through the perforation; and configuring the wellbores that are fluidly connected to the common pumping source, based on the known rate range of each perforation and the known operating pump capacity of each of the one or more fluid pumps, so that the common pumping source: concurrently provides fracturing fluid to each of the wellbores; and concurrently provides fracturing fluid to perforations in each of the wellbores within the known rate range of the respective perforation to successfully fracture the subterranean formation outside the perforation.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 11377943 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record, leaving out a terminal disclaimer it shows without a date, is 2040-05-28 (20 years from filing), a date not yet passed; that disclaimer can only make the term end earlier (data version 20261117.2).
- Basis
- term_20y · terminal_disclaimer (20 years from filing, a terminal disclaimer on record without a date, which can only make the term end earlier than the date computed from the other dates)
- Term end
- 2040-05-28 Computed from the dates in the USPTO recordThis date leaves out a terminal disclaimer on record that has no date; that disclaimer can only make the term end earlier.
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 14 US patent documents · Cited by: 90 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11377943/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11377943 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| AR | 119325 | A1 | 2021-12-09 |
| AR | 119327 | A1 | 2021-12-09 |
| AR | 119380 | A1 | 2021-12-15 |
| SA | 120410827 | B1 | 2023-01-02 |
| SA | 120410823 | B1 | 2023-01-24 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "11377943",
"status": "active",
"basis": [
"term_20y",
"terminal_disclaimer"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2040-05-28",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/11377943?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/11377943?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/11377943/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=11377943",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/11377943/ - Status record
/api/v1/lapse/status/11377943/ - Claim tree
/api/v1/structure/claims/11377943/ - Brief
/api/v1/structure/brief/11377943/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.