PatentRef

Data version 20261117.2, as of 2026-11-17. Free beta.

US 11469992

Systems and methods for managing multi-layer communication networks

Granted 2022-10-11 · Filed 2019-10-07 · Application 16/594,080 · Utility · Kind B2 · Prior publication US 2020/0036628 A1, 2020-01-30

Assignee as printed
  • SEDONASYS SYSTEMS LTD, Raanana (IL)
Inventors
Ornan Gerstel, Herzliya (IL)
CPC, current
H04L45/28; H04L41/0668; H04L41/40; H04L45/028; H04L45/22; H04L69/16; H04L41/0213; H04L43/0876; H04L45/02; H04L45/62; H04Q2011/0081

Abstract

A computerized system for performing preparation operations for a maintenance activity that causes a disruption in a communication path of traffic over a multi-layer network. The system comprising: a maintenance tool configured to coordinate maintenance activities of the multi-layer network based on maintenance activity data, a storage unit to store the maintenance activity data; and a multi-layer control system comprising a processor, wherein said processor is configured to: receive from the maintenance tool an indication that one or more maintenance activities are required on an indicated optical resource, determine an affected optical path, determine an affected IP link utilizing said affected optical path; remove traffic from the affected IP link; remove the affected optical path; activate an alternative optical path; configure the packet switching layer to utilize the alternative optical path; and repeat for each affected optical path and each affected IP link.

Claims

16 claims · independent 1, 6 and 11

The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.

Claim 1

Independent claim.

1. A system for restoring a network state after performing a maintenance activity that causes a disruption in a communication path of traffic over a multi-layer network, wherein the multi-layer network comprises a packet switching layer and an optical layer, wherein the packet switching layer comprises IP links and IP nodes, wherein the optical layer comprises optical links and optical nodes, the system comprising:

  1. Claim 1, element e1a maintenance tool that coordinates maintenance activities of the multi-layer network based on maintenance activity data; and 419–539
  2. Claim 1, element e2a multi-layer control system comprising a processor and computer-executable instructions that, when executed by the processor, cause the processor to: 545–694
  3. Claim 1, element e3determine that a first optical path of the optical paths is affected, or will be affected, by the maintenance activity; 696–814
  4. Claim 1, element e4determine a metric associated with the first optical path; 816–873
  5. Claim 1, element e5configure a second optical path, according to the metric, in the optical layer to reduce traffic congestion that is caused by the first optical path being affected by the maintenance activity, 875–1066
  6. Claim 1, element e6wherein the second optical path is configured, at least in part, according to at least one of the following constraints: 1068–1187
  7. Claim 1, element e7a length of time associated with configuring the second optical path; or 1189–1257
  8. Claim 1, element e8a number of operations required to configure the second optical path; 1262–1330
  9. Claim 1, element e9receive an indication from the maintenance tool that the maintenance activity for an optical resource associated with the optical layer is completed; 1333–1481
  10. Claim 1, element e10determine that the maintenance activity resulted in a particular link of the IP links transitioning from utilizing the first optical path to communicate traffic to utilizing the second optical path; 1483–1680
  11. Claim 1, element e11instruct the packet switching layer to remove traffic from the particular IP link by rerouting the traffic to other IP links; 1682–1806
  12. Claim 1, element e12instruct the optical layer to reroute traffic passing via the second optical path to the first optical path, 1808–1915
  13. Claim 1, element e13wherein the first optical path includes the optical resource; and 1917–1977
  14. Claim 1, element e14instruct the packet switching layer to reroute traffic back to the particular IP link.1983–2068
4 dependent claims: 2 to 5 (2, 3, 4, 5 on claim 1)

Claim 2

Depends on claim 1.

2. The system of claim 1, comprising

  1. Claim 2, element e1further computer-executable instructions that cause the processor to: 37–105
  2. Claim 2, element e2identify multiple IP links of the IP links that were affected, or are affected, by the maintenance activity; 107–214
  3. Claim 2, element e3determine, for each of the multiple IP links, measures of impact caused by the maintenance activity on the multiple optical links; and 216–345
  4. Claim 2, element e4reroute traffic for the multiple IP links based at least in part on the measures of impact.351–441

Claim 3

Depends on claim 1.

3. The system of claim 1, comprising

  1. Claim 3, element e1further computer-executable instructions that cause the processor to: 37–105
  2. Claim 3, element e2identify, using network topology data indicating a network topology of the multi-layer network, multiple optical links or multiple optical nodes that are not affected by the maintenance activity; and 107–301
  3. Claim 3, element e3determine, using the multiple optical links or multiple optical nodes, that the second optical path circumvents the optical resource associated with the maintenance activity, 307–480
  4. Claim 3, element e4wherein the second optical path is configured based on the second optical path circumventing the optical resource.482–595

Claim 4

Depends on claim 1.

4. The system of claim 1, comprising

  1. Claim 4, element e1further computer-executable instructions that cause the processor to: 37–105
  2. Claim 4, element e2determine to configure the second optical path based at least in part on determining a likelihood that the second optical path will experience a failure.107–259

Claim 5

Depends on claim 1.

5. The system of claim 1, comprising

  1. Claim 5, element e1further computer-executable instructions that cause the processor to, prior to performing the maintenance activity: 37–151
  2. Claim 5, element e2simulate a removal of traffic from the first optical path; 153–210
  3. Claim 5, element e3simulate a use of the second optical path during while the removal of the traffic from the first optical path is simulated; and 212–334
  4. Claim 5, element e4determine to configure the second optical path during the maintenance activity based at least in part on the simulating the use of the second optical path.340–494

Claim 6

Independent claim.

6. A computer-implemented method for restoring a network state after performing a maintenance activity that causes a disruption in a communication path of traffic over a multi-layer network, wherein the multi-layer network comprises a packet switching layer and an optical layer, wherein the packet switching layer comprises IP links and IP nodes, wherein the optical layer comprises optical links and optical nodes, the computer-implemented method comprising:

  1. Claim 6, element e1determining that a first optical path of the optical paths is affected, or will be affected, by the maintenance activity; 461–581
  2. Claim 6, element e2determining a metric associated with the first optical path; 583–642
  3. Claim 6, element e3configuring a second optical path, according to the metric, in the optical layer to reduce traffic congestion that is caused by the first optical path being affected by the maintenance activity, 644–837
  4. Claim 6, element e4wherein the second optical path is configured, at least in part, according to at least one of the following constraints: 839–958
  5. Claim 6, element e5a length of time associated with configuring the second optical path; or 960–1028
  6. Claim 6, element e6a number of operations required to configure the second optical path; 1033–1101
  7. Claim 6, element e7receiving an indication that the maintenance activity for an optical resource associated with the optical layer is completed; 1104–1228
  8. Claim 6, element e8determining that the maintenance activity resulted in a particular link of the IP links transitioning from utilizing the first optical path to communicate traffic to utilizing the second optical path; 1230–1429
  9. Claim 6, element e9instructing the packet switching layer to remove traffic from the particular IP link by rerouting the traffic to other IP links; 1431–1558
  10. Claim 6, element e10instructing the optical layer to reroute traffic passing via the second optical path to the first optical path, 1560–1670
  11. Claim 6, element e11wherein the first optical path includes the optical resource; and 1672–1732
  12. Claim 6, element e12instructing the packet switching layer to reroute traffic back to the particular IP link.1738–1826
4 dependent claims: 7 to 10 (7, 8, 9, 10 on claim 6)

Claim 7

Depends on claim 6.

7. The computer-implemented method of claim 6, further comprising:

  1. Claim 7, element e1identifying multiple IP links of the IP links that were affected, or are affected, by the maintenance activity; 67–177
  2. Claim 7, element e2determining, for each of the multiple IP links, measures of impact caused by the maintenance activity on the multiple optical links; and 179–310
  3. Claim 7, element e3rerouting traffic for the multiple IP links based at least in part on the measures of impact.316–408

Claim 8

Depends on claim 6.

8. The computer-implemented method of claim 6, further comprising:

  1. Claim 8, element e1identifying, using network topology data indicating a network topology of the multi-layer network, multiple optical links or multiple optical nodes that are not affected by the maintenance activity; and 67–264
  2. Claim 8, element e2determining, using the multiple optical links or multiple optical nodes, that the second optical path circumvents the optical resource associated with the maintenance activity, 270–445
  3. Claim 8, element e3wherein the second optical path is configured based on the second optical path circumventing the optical resource.447–560

Claim 9

Depends on claim 6.

9. The computer-implemented method of claim 6, further comprising:

  1. Claim 9, element e1determining to configure the second optical path based at least in part on determining a likelihood that the second optical path will experience a failure.67–221

Claim 10

Depends on claim 6.

10. The computer-implemented method of claim 6, further comprising,

  1. Claim 10, element e1prior to performing the maintenance activity: 68–112
  2. Claim 10, element e2simulating a removal of traffic from the first optical path; 114–173
  3. Claim 10, element e3simulating a use of the second optical path during while the removal of the traffic from the first optical path is simulated; and 175–299
  4. Claim 10, element e4determining to configure the second optical path during the maintenance activity based at least in part on the simulating the use of the second optical path.305–461

Claim 11

Independent claim.

11. One or more non-transitory computer-readable media storing computer-executable instructions that, when executed by one or more processors, cause the one or more processors to perform operations comprising:

  1. Claim 11, element e1determining that a first optical path of optical paths is affected, or will be affected, by a maintenance activity; 210–324
  2. Claim 11, element e2determining a metric associated with the first optical path; 326–385
  3. Claim 11, element e3configuring a second optical path, according to the metric, in an optical layer of a multi-layer network to reduce traffic congestion that is caused by the first optical path being affected by the maintenance activity, 387–604
  4. Claim 11, element e4wherein the second optical path is configured, at least in part, according to at least one of the following constraints: 606–725
  5. Claim 11, element e5a length of time associated with configuring the second optical path; or 727–795
  6. Claim 11, element e6a number of operations required to configure the second optical path; 800–868
  7. Claim 11, element e7receiving an indication that the maintenance activity for an optical resource associated with the optical layer is completed; 871–995
  8. Claim 11, element e8determining that the maintenance activity resulted in a particular link of IP links in the multi-layer network transitioning from utilizing the first optical path to communicate traffic to utilizing the second optical path; 997–1219
  9. Claim 11, element e9instructing a packet switching layer of the multi-layer network to remove traffic from the particular IP link by rerouting the traffic to other IP links; 1221–1373
  10. Claim 11, element e10instructing the optical layer to reroute traffic passing via the second optical path to the first optical path, 1375–1485
  11. Claim 11, element e11wherein the first optical path includes the optical resource; and 1487–1547
  12. Claim 11, element e12instructing the packet switching layer to reroute traffic back to the particular IP link.1553–1641
5 dependent claims: 12 to 16 (12, 13, 14, 15, 16 on claim 11)

Claim 12

Depends on claim 11.

12. The one or more non-transitory computer-readable media of claim 11, the operations further comprising:

  1. Claim 12, element e1identifying multiple IP links of the IP links that were affected, or are affected, by the maintenance activity; 107–217
  2. Claim 12, element e2determining, for each of the multiple IP links, measures of impact caused by the maintenance activity on the multiple optical links; and 219–350
  3. Claim 12, element e3rerouting traffic for the multiple IP links based at least in part on the measures of impact.356–448

Claim 13

Depends on claim 11.

13. The one or more non-transitory computer-readable media of claim 11, the operations further comprising:

  1. Claim 13, element e1identifying, using network topology data indicating a network topology of the multi-layer network, multiple optical links or multiple optical nodes that are not affected by the maintenance activity; and 107–304
  2. Claim 13, element e2determining, using the multiple optical links or multiple optical nodes, that the second optical path circumvents the optical resource associated with the maintenance activity, 310–485
  3. Claim 13, element e3wherein the second optical path is configured based on the second optical path circumventing the optical resource.487–600

Claim 14

Depends on claim 11.

14. The one or more non-transitory computer-readable media of claim 11, the operations further comprising:

  1. Claim 14, element e1determining to configure the second optical path based at least in part on determining a likelihood that the second optical path will experience a failure.107–261

Claim 15

Depends on claim 11.

15. The one or more non-transitory computer-readable media of claim 11, the operations further comprising,

  1. Claim 15, element e1prior to performing the maintenance activity: 107–151
  2. Claim 15, element e2simulating a removal of traffic from the first optical path; 153–212
  3. Claim 15, element e3simulating a use of the second optical path during while the removal of the traffic from the first optical path is simulated; and 214–338
  4. Claim 15, element e4determining to configure the second optical path during the maintenance activity based at least in part on the simulating the use of the second optical path.344–500

Claim 16

Depends on claim 11.

16. The one or more non-transitory computer-readable media of claim 11, wherein

  1. Claim 16, element e1determining the metric includes determining an amount of bandwidth resources provided by the first optical path.80–191

Status

active

As of 2026-11-17, the USPTO record for US 11469992 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2036-06-26 (20 years from the filing of a parent application on 2016-03-31, plus 87 days of patent term adjustment), a date not yet passed (data version 20261117.2).

Basis
term_20y · pta_days:87 (20 years from the filing of a parent application on 2016-03-31, plus 87 days of patent term adjustment)
Term end
2036-06-26 Computed from the dates in the USPTO record
Fee lapse
none on record
Reinstatement
none on record; reinstatement_possible: false, not lapsed
As of
2026-11-17
Data version
20261117.2

A fact about the record with its basis and its as-of date, not legal advice.

Citations

References cited on the grant: 2 US patent documents · Cited by: 134 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11469992/ (needs a free key, as the links under Get this as data)

Family outside the US

Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11469992 (read 2026-10-15). Their legal status is not shown here.

OfficeNumberKindPublished
AU2016242302A12017-10-19
BR112017020925A22018-07-10
CA2980834A12016-10-06
CA2980834C2022-01-25
EP3278480A22018-02-07
EP3278480A42018-10-03
MX2017012718A2018-05-15
MX378525B2025-03-11
WO2016157194A22016-10-06
WO2016157194A32017-01-05

This patent's family on USPTO Global Dossier

Family data from Google Patents Public Datasets, used under CC BY 4.0.

Record JSON
{
 "patent_id": "11469992",
 "status": "active",
 "basis": [
  "term_20y",
  "pta_days:87"
 ],
 "reinstatement_possible": false,
 "reinstatement_basis": "not lapsed",
 "expiry_date_estimated": "2036-06-26",
 "lapse_date": null,
 "reinstated_date": null,
 "as_of": "2026-11-17",
 "data_version": "20261117.2",
 "catalog_data_version": "20261117.2",
 "permalink": "https://patentref.io/p/11469992?v=20261117.2",
 "next_steps": [
  {
   "kind": "record",
   "url": "https://patentref.io/p/11469992?v=20261117.2",
   "audience": "human"
  },
  {
   "kind": "patent",
   "url": "https://patentref.io/api/v1/patent/11469992/",
   "audience": "agent"
  },
  {
   "kind": "fee_events",
   "tool": "uspto_patent_center",
   "url": "https://patentcenter.uspto.gov/applications?patentNumber=11469992",
   "audience": "agent"
  }
 ]
}

Get this as data

These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.

Elsewhere

Cite this record

https://patentref.io/p/11469992?v=20261117.2

Data 20261117.2 · as of 2026-11-17