US 11608726
Switchable apparatus, well site and control method thereof, device, and storage medium
Granted 2023-03-21 · Filed 2021-07-08 · Application 17/370,856 · Utility · Kind B2 · Prior publication US 2022/0220836 A1, 2022-07-14
- Assignee as printed
- Yantai Jereh Petroleum Equipment & Technologies Co., Ltd., Yantai (CN)
- Inventors
- Peng Zhang, Shandong (CN); Liang Lv, Shandong (CN); Rikui Zhang, Shandong (CN); Zhuqing Mao, Shandong (CN); Jianwei Wang, Shandong (CN); Chunqiang Lan, Shandong (CN); Yipeng Wu, Shandong (CN); Xincheng Li, Shandong (CN)
- CPC, current
- E21B43/2607; F04B17/05; E21B41/0085; F01D15/10; F04B9/02; F04B17/03; F04B23/06; F04B49/007; H02K7/1823; E21B43/26
Abstract
A fracturing and power generation switchable apparatus, a well site, a control method of the well site, a control device, and a storage medium are provided. The fracturing and power generation switchable apparatus includes a power device, a speed transmission device, and a bearing base. The switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a fracturing apparatus, and under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the switchable apparatus is supplied as a power generation apparatus.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A system comprising a fracturing and power generation switchable apparatus, the fracturing and power generation switchable apparatus comprising:
- Claim 1, element e1a power device, a speed transmission device, connected with the power device, and a bearing base, configured for carrying and fixing a plunger pump or an electric generator, 148–320
- Claim 1, element e2wherein: 322–329
- Claim 1, element e3the fracturing and power generation switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a fracturing apparatus, under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a power generation apparatus, the bearing base comprises a first side frame structure and a second side frame structure opposite to the first side frame structure, the first side frame structure and the second side frame structure being connected by a plurality of bridging structures, each of the first side frame structure and second side frame structure comprises a top supporting plate, a bottom supporting plate, and a relief groove along and between the top supporting plate and the bottom supporting plate, the relief groove being configured to accommodate a forklift arm, and the top supporting plate of the first side frame structure and the top supporting plate of the second side frame structure are each bolted with at least a first set of fixing plates directly above the relief groove for fixing the plunger pump and a second set of fixing plates directly above the relief groove for fixing the electric generator.331–1808
8 dependent claims: 2 to 9 (2, 8, 9 on claim 1; 3 on 2; 4, 6, 7 on 3; 5 on 4)
Claim 2
Depends on claim 1.
2. The fracturing and power generation switchable apparatus according to claim 1, wherein
- Claim 2, element e1each of the electric generator and the plunger pump is detachably provided with a first connection unit, the electric generator is connected with cables required for an operation of the electric generator via the first connection unit, and the plunger pump is connected with cables and/or fluid lines required for an operation of the plunger pump via the first connection unit.90–466
Claim 3
Depends on claim 2.
3. The fracturing and power generation switchable apparatus according to claim 2, wherein:
- Claim 3, element e1the first connection unit comprises a base and a connection structure, the connection structure is movably connected with the base, the connection structure comprises a plurality of interfaces, the plurality of interfaces being configured to connect the cables and/or fluid lines required for the operation of the plunger pump or the cables required for the operation of the electric generator, and the plurality of interfaces passing through a plug-in surface of the connection structure, when the connection structure is not connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure overlaps with a surface of the base, and the plug-in surface is located at a main surface of the connection structure.91–943
Claim 4
Depends on claim 3.
4. The fracturing and power generation switchable apparatus according to claim 3, wherein:
- Claim 4, element e1the connection structure is rotatably connected with the base, when the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure rotates toward a side away from the surface of the base, so that the plug-in surface is perpendicular to the surface of the base, and the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump.91–715
Claim 5
Depends on claim 4.
5. The fracturing and power generation switchable apparatus according to claim 4, wherein
- Claim 5, element e1the power device comprises a turbine engine, and the speed transmission device comprises a speed reducer, an output shaft of the turbine engine is connected with an input shaft of the speed reducer by a flange, and an output shaft of the speed reducer is connected directly or via a coupler with an input hole of the electric generator or an input shaft of the plunger pump.90–463
Claim 6
Depends on claim 3.
6. The fracturing and power generation switchable apparatus according to claim 3, wherein:
- Claim 6, element e1when the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure moves to a side away from the base, so that an orthographic projection of the plug-in surface of the connection structure on a plane parallel to the surface of the base is at least partially outside the surface of the base, and the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump.91–746
Claim 7
Depends on claim 3.
7. The fracturing and power generation switchable apparatus according to claim 3, wherein:
- Claim 7, element e1the plurality of interfaces are configured to connect with at least one of lubrication pipelines, control cables, sensor wires, and hydraulic pipelines.91–242
Claim 8
Depends on claim 1.
8. The fracturing and power generation switchable apparatus according to claim 1, wherein
- Claim 8, element e1a second connection unit is detachably provided at the fracturing and power generation switchable apparatus, and the second connection unit is configured to connect with an electric generator that supplies power to the fracturing and power generation switchable apparatus.90–361
Claim 9
Depends on claim 1.
9. The system of claim 1, further comprising:
- Claim 9, element e1a manifold, configured to transport fracturing fluid to a wellhead, and a plurality of fracturing and power generation switchable apparatuses, 46–187
- Claim 9, element e2wherein the plurality of fracturing and power generation switchable apparatuses are provided at two sides of the manifold and are connected with the manifold, and at least one of the plurality of fracturing and power generation switchable apparatuses is configured to operate in the first state.189–483
Claim 10
Independent claim.
10. A control method of a well site, comprising:
- Claim 10, element e1providing a plurality of fracturing and power generation switchable apparatus and a manifold connecting therewith, each fracturing and power generation switchable apparatus including a power device, a speed transmission device, connected with the power device, and a bearing base, configured for carrying and fixing a plunger pump or an electric generator, 49–404
- Claim 10, element e2wherein: 406–413
- Claim 10, element e3the fracturing and power generation switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a fracturing apparatus; 415–758
- Claim 10, element e4under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a power generation apparatus; 760–993
- Claim 10, element e5the bearing base comprises a first side frame structure and a second side frame structure opposite to the first side frame structure, the first side frame structure and the second side frame structure connected by a plurality of bridging structure; 995–1242
- Claim 10, element e6each of the first side frame structure and second side frame structure comprising a top supporting plate, a bottom supporting plate, and a relief groove between the top supporting plate and the bottom supporting plate, the relief groove being configured to accommodate a forklift arm; and 1244–1527
- Claim 10, element e7the top supporting plate of the first side frame structure and the top supporting plate of the second side frame structure are each bolted with at least a first set of fixing plates for fixing the plunger pump and a second set of fixing plates directly above the relief groove for fixing the electric generator, the method comprising: 1533–1866
- Claim 10, element e8in response to displacement data output by each of the plurality of fracturing and power generation switchable apparatuses in the first state, generating a displacement information, 1869–2049
- Claim 10, element e9wherein the displacement information comprises the displacement data of each of the plurality of fracturing and power generation switchable apparatuses in the first state and a total displacement value obtained by summing all of the displacement data; 2051–2301
- Claim 10, element e10obtaining a displacement demand input externally, when the total displacement value is greater than or equal to the displacement demand, outputting a compliance indication, otherwise, outputting non-compliance indication; 2303–2523
- Claim 10, element e11in response to the compliance indication, based on the displacement information and the displacement demand, selecting at least one candidate switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state and generating a number of the at least one candidate switchable apparatus; and 2525–2858
- Claim 10, element e12when the number of the at least one candidate switchable apparatus is greater than a number of electric generators in demand, further selecting a subset of switchable apparatuses with a same number of the electric generators in demand.2864–3098
7 dependent claims: 11 to 16 and 18 (11, 12, 14, 15, 16, 18 on claim 10; 13 on 12)
Claim 11
Depends on claim 10.
11. The control method according to claim 10, further comprising
- Claim 11, element e1switching the selected subset of switchable apparatus from the first state to the second state.65–159
Claim 12
Depends on claim 10.
12. The control method according to claim 10, wherein
- Claim 12, element e1selecting at least one candidate switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state comprises: 54–213
- Claim 12, element e2in response to the compliance indication, based on the displacement information and the displacement demand, calculating a difference between the total displacement value and the displacement demand, and recording the difference as a surplus displacement; 215–469
- Claim 12, element e3periodically selecting at least one switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state as a candidate switchable apparatus.471–659
Claim 13
Depends on claim 12.
13. The control method according to claim 12, wherein
- Claim 13, element e1a selection condition for periodically outselecting at least one switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state comprises: 54–245
- Claim 13, element e2periodically selecting at least one switchable apparatus according to the displacement data of the plurality of fracturing and power generation switchable apparatuses in the first state in an ascending order of displacement data of the plurality of fracturing and power generation switchable apparatuses, 247–550
- Claim 13, element e3wherein a sum of the displacement data of the at least one switchable apparatus so selected is smaller than the surplus displacement.552–684
Claim 14
Depends on claim 10.
14. The control method according to claim 10, further comprising:
- Claim 14, element e1when at least one switchable apparatus in the well site in the first state is powered off and compliance indication is not received, in response to a single-system power generation data and power demand data input externally, determining the number of electric generators in demand by rounding up a calculation result of dividing the power demand data by the single-system power generation data to a next nearest integer.66–486
Claim 15
Depends on claim 10.
15. The control method according to claim 10, further comprising
- Claim 15, element e1when the number of the at least one candidate switchable apparatus is not greater than the number of the electric generators in demand: 65–199
- Claim 15, element e2switching all of the at least one candidate switchable apparatus from the first state to the second state, and generating a corresponding warning information.201–358
Claim 16
Depends on claim 10.
16. The control method according to claim 10, wherein
- Claim 16, element e1selecting the subset of switchable apparatuses with the same number of the electric generators in demand comprises: 54–168
- Claim 16, element e2selecting the subset of switchable apparatuses with the same number of electric generators in demand according to an ascending order of the displacement data of the at least one candidate switchable apparatus in the first state.170–397
Claim 18
Depends on claim 10.
18. A computer readable storage medium, having an executable code stored thereon, wherein when the executable code is executed by a processor, the processor executes the control method according to claim 10.
Claim 17
Independent claim.
17. A control device, comprising:
- Claim 17, element e1a processor; and 34–45
- Claim 17, element e2a memory, 51–59
- Claim 17, element e3wherein a computer executable code is stored in the memory, when the computer executable code is run by the processor, the control method according to claim 10 is executed.61–232
1. A system comprising a fracturing and power generation switchable apparatus, the fracturing and power generation switchable apparatus comprising: a power device, a speed transmission device, connected with the power device, and a bearing base, configured for carrying and fixing a plunger pump or an electric generator, wherein: the fracturing and power generation switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a fracturing apparatus, under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a power generation apparatus, the bearing base comprises a first side frame structure and a second side frame structure opposite to the first side frame structure, the first side frame structure and the second side frame structure being connected by a plurality of bridging structures, each of the first side frame structure and second side frame structure comprises a top supporting plate, a bottom supporting plate, and a relief groove along and between the top supporting plate and the bottom supporting plate, the relief groove being configured to accommodate a forklift arm, and the top supporting plate of the first side frame structure and the top supporting plate of the second side frame structure are each bolted with at least a first set of fixing plates directly above the relief groove for fixing the plunger pump and a second set of fixing plates directly above the relief groove for fixing the electric generator.
2. The fracturing and power generation switchable apparatus according to claim 1, wherein each of the electric generator and the plunger pump is detachably provided with a first connection unit, the electric generator is connected with cables required for an operation of the electric generator via the first connection unit, and the plunger pump is connected with cables and/or fluid lines required for an operation of the plunger pump via the first connection unit.
3. The fracturing and power generation switchable apparatus according to claim 2, wherein: the first connection unit comprises a base and a connection structure, the connection structure is movably connected with the base, the connection structure comprises a plurality of interfaces, the plurality of interfaces being configured to connect the cables and/or fluid lines required for the operation of the plunger pump or the cables required for the operation of the electric generator, and the plurality of interfaces passing through a plug-in surface of the connection structure, when the connection structure is not connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure overlaps with a surface of the base, and the plug-in surface is located at a main surface of the connection structure.
4. The fracturing and power generation switchable apparatus according to claim 3, wherein: the connection structure is rotatably connected with the base, when the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure rotates toward a side away from the surface of the base, so that the plug-in surface is perpendicular to the surface of the base, and the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump.
5. The fracturing and power generation switchable apparatus according to claim 4, wherein the power device comprises a turbine engine, and the speed transmission device comprises a speed reducer, an output shaft of the turbine engine is connected with an input shaft of the speed reducer by a flange, and an output shaft of the speed reducer is connected directly or via a coupler with an input hole of the electric generator or an input shaft of the plunger pump.
6. The fracturing and power generation switchable apparatus according to claim 3, wherein: when the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump, the plug-in surface of the connection structure moves to a side away from the base, so that an orthographic projection of the plug-in surface of the connection structure on a plane parallel to the surface of the base is at least partially outside the surface of the base, and the connection structure is connected with the cables required for the operation of the electric generator or the cables and/or fluid lines required for the operation of the plunger pump.
7. The fracturing and power generation switchable apparatus according to claim 3, wherein: the plurality of interfaces are configured to connect with at least one of lubrication pipelines, control cables, sensor wires, and hydraulic pipelines.
8. The fracturing and power generation switchable apparatus according to claim 1, wherein a second connection unit is detachably provided at the fracturing and power generation switchable apparatus, and the second connection unit is configured to connect with an electric generator that supplies power to the fracturing and power generation switchable apparatus.
9. The system of claim 1, further comprising: a manifold, configured to transport fracturing fluid to a wellhead, and a plurality of fracturing and power generation switchable apparatuses, wherein the plurality of fracturing and power generation switchable apparatuses are provided at two sides of the manifold and are connected with the manifold, and at least one of the plurality of fracturing and power generation switchable apparatuses is configured to operate in the first state.
10. A control method of a well site, comprising: providing a plurality of fracturing and power generation switchable apparatus and a manifold connecting therewith, each fracturing and power generation switchable apparatus including a power device, a speed transmission device, connected with the power device, and a bearing base, configured for carrying and fixing a plunger pump or an electric generator, wherein: the fracturing and power generation switchable apparatus is configured to switch between a first state and a second state, under the first state, the plunger pump is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a fracturing apparatus; under the second state, the electric generator is fixed on the bearing base and is connected with the speed transmission device, and the fracturing and power generation switchable apparatus is supplied as a power generation apparatus; the bearing base comprises a first side frame structure and a second side frame structure opposite to the first side frame structure, the first side frame structure and the second side frame structure connected by a plurality of bridging structure; each of the first side frame structure and second side frame structure comprising a top supporting plate, a bottom supporting plate, and a relief groove between the top supporting plate and the bottom supporting plate, the relief groove being configured to accommodate a forklift arm; and the top supporting plate of the first side frame structure and the top supporting plate of the second side frame structure are each bolted with at least a first set of fixing plates for fixing the plunger pump and a second set of fixing plates directly above the relief groove for fixing the electric generator, the method comprising: in response to displacement data output by each of the plurality of fracturing and power generation switchable apparatuses in the first state, generating a displacement information, wherein the displacement information comprises the displacement data of each of the plurality of fracturing and power generation switchable apparatuses in the first state and a total displacement value obtained by summing all of the displacement data; obtaining a displacement demand input externally, when the total displacement value is greater than or equal to the displacement demand, outputting a compliance indication, otherwise, outputting non-compliance indication; in response to the compliance indication, based on the displacement information and the displacement demand, selecting at least one candidate switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state and generating a number of the at least one candidate switchable apparatus; and when the number of the at least one candidate switchable apparatus is greater than a number of electric generators in demand, further selecting a subset of switchable apparatuses with a same number of the electric generators in demand.
11. The control method according to claim 10, further comprising switching the selected subset of switchable apparatus from the first state to the second state.
12. The control method according to claim 10, wherein selecting at least one candidate switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state comprises: in response to the compliance indication, based on the displacement information and the displacement demand, calculating a difference between the total displacement value and the displacement demand, and recording the difference as a surplus displacement; periodically selecting at least one switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state as a candidate switchable apparatus.
13. The control method according to claim 12, wherein a selection condition for periodically outselecting at least one switchable apparatus from the plurality of fracturing and power generation switchable apparatuses in the first state comprises: periodically selecting at least one switchable apparatus according to the displacement data of the plurality of fracturing and power generation switchable apparatuses in the first state in an ascending order of displacement data of the plurality of fracturing and power generation switchable apparatuses, wherein a sum of the displacement data of the at least one switchable apparatus so selected is smaller than the surplus displacement.
14. The control method according to claim 10, further comprising: when at least one switchable apparatus in the well site in the first state is powered off and compliance indication is not received, in response to a single-system power generation data and power demand data input externally, determining the number of electric generators in demand by rounding up a calculation result of dividing the power demand data by the single-system power generation data to a next nearest integer.
15. The control method according to claim 10, further comprising when the number of the at least one candidate switchable apparatus is not greater than the number of the electric generators in demand: switching all of the at least one candidate switchable apparatus from the first state to the second state, and generating a corresponding warning information.
16. The control method according to claim 10, wherein selecting the subset of switchable apparatuses with the same number of the electric generators in demand comprises: selecting the subset of switchable apparatuses with the same number of electric generators in demand according to an ascending order of the displacement data of the at least one candidate switchable apparatus in the first state.
17. A control device, comprising: a processor; and a memory, wherein a computer executable code is stored in the memory, when the computer executable code is run by the processor, the control method according to claim 10 is executed.
18. A computer readable storage medium, having an executable code stored thereon, wherein when the executable code is executed by a processor, the processor executes the control method according to claim 10.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 11608726 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2041-07-08 (20 years from filing), a date not yet passed (data version 20261117.2).
- Basis
- term_20y (20 years from filing)
- Term end
- 2041-07-08 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 27 US patent documents · Cited by: 54 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11608726/ (needs a free key, as the links under Get this as data)
Family outside the US
Publications outside the US that Google Patents Public Datasets lists in the same patent family as US 11608726 (read 2026-10-15). Their legal status is not shown here.
| Office | Number | Kind | Published |
|---|---|---|---|
| CA | 3173367 | A1 | 2022-07-14 |
| CN | 113047916 | A | 2021-06-29 |
| WO | 2022147946 | A1 | 2022-07-14 |
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "11608726",
"status": "active",
"basis": [
"term_20y"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2041-07-08",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/11608726?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/11608726?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/11608726/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=11608726",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/11608726/ - Status record
/api/v1/lapse/status/11608726/ - Claim tree
/api/v1/structure/claims/11608726/ - Brief
/api/v1/structure/brief/11608726/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.