US 11624326
Methods and systems for supplying fuel to gas turbine engines
Granted 2023-04-11 · Filed 2020-12-14 · Application 17/120,460 · Utility · Kind B2 · Prior publication US 2021/0095601 A1, 2021-04-01
- Assignee as printed
- BJ Energy Solutions, LLC, Houston, TX (US)
- Inventors
- Tony Yeung, Tomball, TX (US); Ricardo Rodriguez-Ramon, Tomball, TX (US); Joseph Foster, Tomball, TX (US)
- CPC, current
- F02C9/40; E21B4/02; E21B43/00; E21B43/16; E21B43/247; E21B43/26; E21B43/2607; F02C7/232; F02C7/236; F02C9/42; F02D2041/224; F02D2200/0602; F05D2270/3015; F05D2270/31; F23N2241/20
Abstract
Methods and systems for supply of fuel for a turbine-driven fracturing pump system used in hydraulic fracturing may be configured to identify when the supply pressure of primary fuel to a plurality of gas turbine engines of a plurality of hydraulic fracturing units falls below a set point, identify a gas turbine engine of the fleet of hydraulic fracturing units operating on primary fuel with highest amount of secondary fuel available, and to selectively transfer the gas turbine engine operating on primary fuel with the highest amount of secondary fuel from primary fuel operation to secondary fuel operation. Some methods and systems may be configured to transfer all gas turbine engines to secondary fuel operation and individually and/or sequentially restore operation to primary fuel operation and/or to manage primary fuel operation and/or secondary fuel operation for portions of the plurality of gas turbine engines.
The claims as the USPTO long-text file prints them (text data version 20261117.3), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A method of controlling fuel supply to a plurality of gas turbine engines associated with a hydraulic fracturing system, the method comprising:
- Claim 1, element e1(a) receiving a signal indicating that supply pressure of primary fuel to one or more gas turbine engines of the plurality of gas turbine engines falls below a set point; 151–316
- Claim 1, element e2(b) based at least in part on the signal: 322–358
- Claim 1, element e3initiating a timer; and 360–378
- Claim 1, element e4increasing a data sampling rate associated with the plurality of gas turbine engines; 384–468
- Claim 1, element e5(c) determining that the supply pressure of primary fuel to the one or more gas turbine engines remains below the set point when the timer reaches a predetermined end time; 475–642
- Claim 1, element e6(d) identifying a gas turbine engine of the plurality of gas turbine engines operating on primary fuel having a highest amount of secondary fuel available; and 648–798
- Claim 1, element e7(e) causing supply of secondary fuel to the identified gas turbine engine in place of at least some of the primary fuel supplied to the identified gas turbine engine.808–969
9 dependent claims: 2 to 10 (2, 3, 5, 6, 7, 8, 9, 10 on claim 1; 4 on 3)
Claim 2
Depends on claim 1.
2. The method of claim 1, further comprising
- Claim 2, element e1repeating steps (a), (b), (c), (d), and (e) for at least some gas turbine engines still operating using primary fuel.45–161
Claim 3
Depends on claim 1.
3. The method of claim 1, further comprising:
- Claim 3, element e1receiving a second signal indicating that supply pressure of primary fuel to the one or more gas turbine engines rises above a second set point; 46–189
- Claim 3, element e2based at least in part on the second signal, initiating a second timer; 191–261
- Claim 3, element e3determining that the supply pressure of primary fuel to the one or more gas turbine engines remains above the second set point when the second timer reaches a second predetermined end time; and 263–451
- Claim 3, element e4transferring the one or more gas turbine engines to primary fuel operation.457–531
Claim 4
Depends on claim 3.
4. The method of claim 3, further comprising
- Claim 4, element e1decreasing the data sampling rate for the one or more gas turbine engines operating on primary fuel operation.45–154
Claim 5
Depends on claim 1.
5. The method of claim 1, wherein
- Claim 5, element e1the identifying the gas turbine engine of the plurality of gas turbine engines operating on primary fuel with highest volume of secondary fuel comprises comparing level sensor measurements from the plurality of gas turbine engines.34–264
Claim 6
Depends on claim 1.
6. The method of claim 1, wherein
- Claim 6, element e1the increasing the data sampling rate comprises increasing the data sampling rate by a factor of at least 2.34–141
Claim 7
Depends on claim 1.
7. The method of claim 1, further comprising:
- Claim 7, element e1receiving an indication of secondary fuel level below a minimum level for one or more gas turbine engines operating on secondary fuel; and 46–179
- Claim 7, element e2shutting down the one or more gas turbine engines operating on secondary fuel.185–262
Claim 8
Depends on claim 1.
8. The method of claim 1, further comprising:
- Claim 8, element e1receiving a measurement of differential pressure for one or more primary fuel filters associated with each gas turbine engine operating on primary fuel; and 46–197
- Claim 8, element e2when the differential pressure increases above a predetermined differential pressure, transferring the associated gas turbine engine from primary fuel operation to secondary fuel operation.203–391
Claim 9
Depends on claim 1.
9. The method of claim 1, further comprising:
- Claim 9, element e1receiving a measurement of differential pressure for one or more primary fuel filters associated with each gas turbine engine operating on primary fuel.46–197
Claim 10
Depends on claim 1.
10. The method of claim 1, wherein
- Claim 10, element e1transferring the gas turbine engine from primary fuel operation to secondary fuel operation comprises gradually closing one or more valves associated with primary fuel operation while gradually opening one or more valves associated with secondary fuel operation.35–296
Claim 11
Independent claim.
11. A system for controlling fuel supply to a plurality of gas turbine engines associated with a hydraulic fracturing system, the system comprising:
- Claim 11, element e1a plurality of gas turbine engines associated with a plurality of pumps; and 149–220
- Claim 11, element e2a controller in communication with the plurality of gas turbine engines, the controller comprising a memory with computer-readable instructions operable to: 226–381
- Claim 11, element e3(a) receive a signal indicating when supply pressure of primary fuel to one or more gas turbine engines of the plurality of gas turbine engines falls below a set point; 387–550
- Claim 11, element e4(b) based at least in part on the signal: 556–592
- Claim 11, element e5initiate a timer; and 594–610
- Claim 11, element e6increase a data sampling rate associated with the plurality of gas turbine engines; 616–698
- Claim 11, element e7(c) determine that the supply pressure of primary fuel to the one or more gas turbine engines remains below the set point when the timer reaches a predetermined end time; 705–870
- Claim 11, element e8(d) identify a gas turbine engine of the plurality of gas turbine engines operating on primary fuel with a highest amount of secondary fuel available; and 876–1021
- Claim 11, element e9(e) transfer the gas turbine engine operating on primary fuel with highest amount of secondary fuel available from primary fuel operation to secondary fuel operation.1031–1192
11 dependent claims: 12 to 22 (12, 13, 14, 15, 17, 18, 19, 20, 21, 22 on claim 11; 16 on 15)
Claim 12
Depends on claim 11.
12. The system of claim 11, wherein
- Claim 12, element e1the controller further is operable to repeat steps (a), (b), (c), and (e) for at least some of the other gas turbine engines of the plurality of gas turbine engines.36–200
Claim 13
Depends on claim 11.
13. The system of claim 11, wherein
- Claim 13, element e1each of the plurality of gas turbine engines connects to a pump, and each of the gas turbine engines and connected pumps comprises a directly-driven turbine fracturing pump.36–208
Claim 14
Depends on claim 11.
14. The system of claim 11, wherein
- Claim 14, element e1the primary fuel comprises a gaseous fuel, and the secondary fuel comprises diesel fuel.36–123
Claim 15
Depends on claim 11.
15. The system of claim 11, wherein
- Claim 15, element e1the controller is further operable to: 36–73
- Claim 15, element e2receive a second signal indicating that a supply pressure of primary fuel to one or more gas turbine engines associated with the plurality of gas turbine engines rises above a second set point, based at least in part on the second signal, initiate a second timer, determine that the supply pressure of primary fuel to the one or more gas turbine engines remains above the second set point when the second timer reaches a second predetermined end time, and transfer the one or more gas turbine engines to primary fuel operation.75–601
Claim 16
Depends on claim 15.
16. The system of claim 15, wherein
- Claim 16, element e1the controller further is operable to decrease the data sampling rate for the one or more gas turbine engines operating on primary fuel operation.36–181
Claim 17
Depends on claim 11.
17. The system of claim 11, further comprising:
- Claim 17, element e1a plurality of secondary sensors configured to generate a secondary signal indicative of an amount of secondary fuel in a secondary fuel supply, and wherein the secondary sensors comprise one or more of a RADAR level sensor, a guided-wave RADAR level sensor, an ultrasonic level sensor, a capacitive level sensor, a hydrostatic level sensor, a probe-type level sensor, a float-type level sensor, a RF admittance level sensor, or an electro-optical level sensor.48–508
Claim 18
Depends on claim 11.
18. The system of claim 11, wherein
- Claim 18, element e1increasing the data sampling rate comprises increasing the data sampling rate by a factor of at least 2.36–139
Claim 19
Depends on claim 11.
19. The system of claim 11, wherein
- Claim 19, element e1the controller further is operable to: 36–73
- Claim 19, element e2receive a signal indicative of a secondary fuel level below a minimum level for one or more gas turbine engines operating on secondary fuel, and shut down the one or more gas turbine engines operating on secondary fuel.75–293
Claim 20
Depends on claim 11.
20. The system of claim 11, wherein
- Claim 20, element e1the controller further is operable: 36–70
- Claim 20, element e2to receive a measurement of differential pressure for a primary fuel filter associated with each gas turbine engine operating on primary fuel, and when the differential pressure increases above a predetermined differential pressure for one of the gas turbine engines, transfer the one gas turbine engine from primary fuel operation to secondary fuel operation.72–431
Claim 21
Depends on claim 11.
21. The system of claim 11, wherein
- Claim 21, element e1the controller comprises one or more of: 36–75
- Claim 21, element e2a micro-controller, a supervisory control and data acquisition (SCADA) system, a computer, a programmable logic controller (PLC), a remote terminal unit (RTU), or a distributed control system (DCS).77–274
Claim 22
Depends on claim 11.
22. The system of claim 11, wherein
- Claim 22, element e1the primary fuel is supplied to the one or more gas turbine engines via one or more: 36–119
- Claim 22, element e2of a hybrid hub system, a multiple hub and spoke system, or a daisy chain system.121–201
1. A method of controlling fuel supply to a plurality of gas turbine engines associated with a hydraulic fracturing system, the method comprising: (a) receiving a signal indicating that supply pressure of primary fuel to one or more gas turbine engines of the plurality of gas turbine engines falls below a set point; (b) based at least in part on the signal: initiating a timer; and increasing a data sampling rate associated with the plurality of gas turbine engines; (c) determining that the supply pressure of primary fuel to the one or more gas turbine engines remains below the set point when the timer reaches a predetermined end time; (d) identifying a gas turbine engine of the plurality of gas turbine engines operating on primary fuel having a highest amount of secondary fuel available; and (e) causing supply of secondary fuel to the identified gas turbine engine in place of at least some of the primary fuel supplied to the identified gas turbine engine.
2. The method of claim 1, further comprising repeating steps (a), (b), (c), (d), and (e) for at least some gas turbine engines still operating using primary fuel.
3. The method of claim 1, further comprising: receiving a second signal indicating that supply pressure of primary fuel to the one or more gas turbine engines rises above a second set point; based at least in part on the second signal, initiating a second timer; determining that the supply pressure of primary fuel to the one or more gas turbine engines remains above the second set point when the second timer reaches a second predetermined end time; and transferring the one or more gas turbine engines to primary fuel operation.
4. The method of claim 3, further comprising decreasing the data sampling rate for the one or more gas turbine engines operating on primary fuel operation.
5. The method of claim 1, wherein the identifying the gas turbine engine of the plurality of gas turbine engines operating on primary fuel with highest volume of secondary fuel comprises comparing level sensor measurements from the plurality of gas turbine engines.
6. The method of claim 1, wherein the increasing the data sampling rate comprises increasing the data sampling rate by a factor of at least 2.
7. The method of claim 1, further comprising: receiving an indication of secondary fuel level below a minimum level for one or more gas turbine engines operating on secondary fuel; and shutting down the one or more gas turbine engines operating on secondary fuel.
8. The method of claim 1, further comprising: receiving a measurement of differential pressure for one or more primary fuel filters associated with each gas turbine engine operating on primary fuel; and when the differential pressure increases above a predetermined differential pressure, transferring the associated gas turbine engine from primary fuel operation to secondary fuel operation.
9. The method of claim 1, further comprising: receiving a measurement of differential pressure for one or more primary fuel filters associated with each gas turbine engine operating on primary fuel.
10. The method of claim 1, wherein transferring the gas turbine engine from primary fuel operation to secondary fuel operation comprises gradually closing one or more valves associated with primary fuel operation while gradually opening one or more valves associated with secondary fuel operation.
11. A system for controlling fuel supply to a plurality of gas turbine engines associated with a hydraulic fracturing system, the system comprising: a plurality of gas turbine engines associated with a plurality of pumps; and a controller in communication with the plurality of gas turbine engines, the controller comprising a memory with computer-readable instructions operable to: (a) receive a signal indicating when supply pressure of primary fuel to one or more gas turbine engines of the plurality of gas turbine engines falls below a set point; (b) based at least in part on the signal: initiate a timer; and increase a data sampling rate associated with the plurality of gas turbine engines; (c) determine that the supply pressure of primary fuel to the one or more gas turbine engines remains below the set point when the timer reaches a predetermined end time; (d) identify a gas turbine engine of the plurality of gas turbine engines operating on primary fuel with a highest amount of secondary fuel available; and (e) transfer the gas turbine engine operating on primary fuel with highest amount of secondary fuel available from primary fuel operation to secondary fuel operation.
12. The system of claim 11, wherein the controller further is operable to repeat steps (a), (b), (c), and (e) for at least some of the other gas turbine engines of the plurality of gas turbine engines.
13. The system of claim 11, wherein each of the plurality of gas turbine engines connects to a pump, and each of the gas turbine engines and connected pumps comprises a directly-driven turbine fracturing pump.
14. The system of claim 11, wherein the primary fuel comprises a gaseous fuel, and the secondary fuel comprises diesel fuel.
15. The system of claim 11, wherein the controller is further operable to: receive a second signal indicating that a supply pressure of primary fuel to one or more gas turbine engines associated with the plurality of gas turbine engines rises above a second set point, based at least in part on the second signal, initiate a second timer, determine that the supply pressure of primary fuel to the one or more gas turbine engines remains above the second set point when the second timer reaches a second predetermined end time, and transfer the one or more gas turbine engines to primary fuel operation.
16. The system of claim 15, wherein the controller further is operable to decrease the data sampling rate for the one or more gas turbine engines operating on primary fuel operation.
17. The system of claim 11, further comprising: a plurality of secondary sensors configured to generate a secondary signal indicative of an amount of secondary fuel in a secondary fuel supply, and wherein the secondary sensors comprise one or more of a RADAR level sensor, a guided-wave RADAR level sensor, an ultrasonic level sensor, a capacitive level sensor, a hydrostatic level sensor, a probe-type level sensor, a float-type level sensor, a RF admittance level sensor, or an electro-optical level sensor.
18. The system of claim 11, wherein increasing the data sampling rate comprises increasing the data sampling rate by a factor of at least 2.
19. The system of claim 11, wherein the controller further is operable to: receive a signal indicative of a secondary fuel level below a minimum level for one or more gas turbine engines operating on secondary fuel, and shut down the one or more gas turbine engines operating on secondary fuel.
20. The system of claim 11, wherein the controller further is operable: to receive a measurement of differential pressure for a primary fuel filter associated with each gas turbine engine operating on primary fuel, and when the differential pressure increases above a predetermined differential pressure for one of the gas turbine engines, transfer the one gas turbine engine from primary fuel operation to secondary fuel operation.
21. The system of claim 11, wherein the controller comprises one or more of: a micro-controller, a supervisory control and data acquisition (SCADA) system, a computer, a programmable logic controller (PLC), a remote terminal unit (RTU), or a distributed control system (DCS).
22. The system of claim 11, wherein the primary fuel is supplied to the one or more gas turbine engines via one or more: of a hybrid hub system, a multiple hub and spoke system, or a daisy chain system.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-17, the USPTO record for US 11624326 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2038-03-17 (20 years from the filing of a parent application on 2017-05-21, plus 300 days of patent term adjustment), a date not yet passed (data version 20261117.2).
- Basis
- term_20y · pta_days:300 (20 years from the filing of a parent application on 2017-05-21, plus 300 days of patent term adjustment)
- Term end
- 2038-03-17 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-17
- Data version
- 20261117.2
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 417 US patent documents · Cited by: 44 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/11624326/ (needs a free key, as the links under Get this as data)
Family outside the US
Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "11624326",
"status": "active",
"basis": [
"term_20y",
"pta_days:300"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2038-03-17",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-17",
"data_version": "20261117.2",
"catalog_data_version": "20261117.2",
"permalink": "https://patentref.io/p/11624326?v=20261117.2",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/11624326?v=20261117.2",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/11624326/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=11624326",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/11624326/ - Status record
/api/v1/lapse/status/11624326/ - Claim tree
/api/v1/structure/claims/11624326/ - Brief
/api/v1/structure/brief/11624326/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.