US 12516533
Methods and devices for repairing concrete surfaces
Granted 2026-01-06 · Filed 2023-12-11 · Application 18/534,910 · Utility · Kind B1
- Assignee as printed
- D. A. COLLINS CONSTRUCTION CO., INC., Wilton, NY (US)
- Inventors
- Kenneth T. Blizzard, Fort Ann, NY (US)
- CPC, current
- E04G23/0203; E01D22/00
Abstract
Methods for repairing holes in a surface, for example, in a concrete surface, cement slurry hoppers, cement slurry funnels, and cement slurry hopper assemblies are disclosed. The methods include positioning a barrier, such as, a board, over a hole in a surface wherein a portion of the hole is not covered by the barrier and a cavity is formed behind the barrier; mounting a hopper over the portion of the hole not covered by the barrier; pouring a cement slurry into the open top of the hopper to substantially completely fill the cavity with cement slurry; allowing the cement slurry to harden; and then removing the hopper and barrier from the surface to reveal a repaired hole in the surface. A cement slurry funnel may be used to fill the hopper. The cement slurry hopper and the cement slurry hopper assembly having an isolation plate are also provided.
The claims as the USPTO long-text file prints them (text data version 20261110.1), split by PatentRef's claim parser (structure version 2): each claim's opening words, then one row for each element with its character offsets in the claim text, and the dependent claims under the claim they refer to. The split describes the text; it is not a reading of it. Each claim and each element has a link of its own. How the links are made.
Claim 1
Independent claim.
1. A method for repairing a hole in a surface, the method comprising:
- Claim 1, element e1positioning a barrier over a hole in a concrete surface wherein a portion of the hole is not covered by the barrier and wherein the barrier and the hole define a cavity; 70–238
- Claim 1, element e2mounting a hopper having an open top, sides, and a discharge outlet on to the concrete surface where the discharge outlet is positioned over the portion of the hole not covered by the barrier; 240–431
- Claim 1, element e3pouring a cement slurry into the open top of the hopper wherein the cement slurry flows through the hopper, out the discharge outlet, into the portion of the hole not covered by the barrier, and into the cavity to substantially completely fill the cavity with cement slurry; 433–706
- Claim 1, element e4allowing the cement slurry in the cavity to at least partially harden; and 708–777
- Claim 1, element e5removing the hopper and barrier from the concrete surface to reveal a repaired hole in the surface.783–881
19 dependent claims: 2 to 20 (2, 4, 5, 6, 7, 9, 10, 11, 13, 14, 15, 17, 18, 20 on claim 1; 3 on 2; 8 on 7; 12 on 11; 16 on 15; 19 on 18)
Claim 2
Depends on claim 1.
2. The method as recited in claim 1, wherein
- Claim 2, element e1the method further comprises inserting an isolation plate between the portion of the hole not covered by the barrier and the discharge outlet of the hopper.45–200
Claim 3
Depends on claim 2.
3. The method as recited in claim 2, wherein
- Claim 3, element e1inserting the isolation plate comprises sliding the isolation plate within opposing recesses in the hopper.45–151
Claim 4
Depends on claim 1.
4. The method as recited in claim 1, wherein
- Claim 4, element e1allowing the cement slurry in the cavity to at least partially harden comprises allowing the cement slurry in the cavity to substantially completely harden.45–200
Claim 5
Depends on claim 1.
5. The method as recited in claim 1, wherein
- Claim 5, element e1the concrete surface comprises a surface of a concrete wall.45–104
Claim 6
Depends on claim 1.
6. The method as recited in claim 1, wherein
- Claim 6, element e1the barrier comprises at least one of a board, a plate, and a panel.45–112
Claim 7
Depends on claim 1.
7. The method as recited in claim 1, wherein
- Claim 7, element e1positioning the barrier over the hole comprises mounting the barrier to the concrete surface.45–137
Claim 8
Depends on claim 7.
8. The method as recited in claim 7, wherein
- Claim 8, element e1mounting the barrier to the concrete surface comprises mounting the barrier to the surface with a plurality of mechanical fasteners.45–176
Claim 9
Depends on claim 1.
9. The method as recited in claim 1, wherein
- Claim 9, element e1the uncovered portion of the hole is positioned adjacent a top of the hole.45–119
Claim 10
Depends on claim 1.
10. The method as recited in claim 1, wherein
- Claim 10, element e1pouring cement slurry into the open top of the hopper is practiced with a plurality of pours.46–138
Claim 11
Depends on claim 1.
11. The method as recited in claim 1, wherein
- Claim 11, element e1the hopper further comprises a slanted bottom sized and shaped to convey the cement slurry to the cavity.46–150
Claim 12
Depends on claim 11.
12. The method as recited in claim 11, wherein
- Claim 12, element e1the slanted bottom comprises a slant angle θ from 30 degrees to 60 degrees.47–121
Claim 13
Depends on claim 1.
13. The method as recited in claim 1, wherein
- Claim 13, element e1the sides of the hopper comprise opposing sidewalls comprising a slant angle α from 30 degrees to 60 degrees.46–154
Claim 14
Depends on claim 1.
14. The method as recited in claim 1, wherein
- Claim 14, element e1the cement slurry comprises a class D concrete slurry.46–99
Claim 15
Depends on claim 1.
15. The method as recited in claim 1, wherein
- Claim 15, element e1the concrete surface comprises one of a vertical surface and a non-vertical surface.46–129
Claim 16
Depends on claim 15.
16. The method as recited in claim 15, wherein
- Claim 16, element e1the non-vertical concrete surface comprises a plane making an angle from plus 45 degrees to minus 45 degrees from vertical.47–169
Claim 17
Depends on claim 1.
17. The method as recited in claim 1, wherein
- Claim 17, element e1pouring the cement slurry into the open top of the hopper comprises pouring the cement slurry with the aid of at least one of gravity and pressure.46–192
Claim 18
Depends on claim 1.
18. The method as recited in claim 1, wherein
- Claim 18, element e1the method further comprises, after removing the hopper and barrier from the concrete surface, finishing the concrete surface.46–171
Claim 19
Depends on claim 18.
19. The method as recited in claim 18, wherein
- Claim 19, element e1finishing the concrete surface comprises at least one of filling unfilled voids in the concrete surface with cement slurry and removing excess at least partially hardened cement slurry from the concrete surface.47–257
Claim 20
Depends on claim 1.
20. The method as recited in claim 1, wherein
- Claim 20, element e1pouring the cement slurry into the open top of the hopper comprises introducing the slurry to the open top of the hopper with a cement slurry funnel.46–194
1. A method for repairing a hole in a surface, the method comprising: positioning a barrier over a hole in a concrete surface wherein a portion of the hole is not covered by the barrier and wherein the barrier and the hole define a cavity; mounting a hopper having an open top, sides, and a discharge outlet on to the concrete surface where the discharge outlet is positioned over the portion of the hole not covered by the barrier; pouring a cement slurry into the open top of the hopper wherein the cement slurry flows through the hopper, out the discharge outlet, into the portion of the hole not covered by the barrier, and into the cavity to substantially completely fill the cavity with cement slurry; allowing the cement slurry in the cavity to at least partially harden; and removing the hopper and barrier from the concrete surface to reveal a repaired hole in the surface.
2. The method as recited in claim 1, wherein the method further comprises inserting an isolation plate between the portion of the hole not covered by the barrier and the discharge outlet of the hopper.
3. The method as recited in claim 2, wherein inserting the isolation plate comprises sliding the isolation plate within opposing recesses in the hopper.
4. The method as recited in claim 1, wherein allowing the cement slurry in the cavity to at least partially harden comprises allowing the cement slurry in the cavity to substantially completely harden.
5. The method as recited in claim 1, wherein the concrete surface comprises a surface of a concrete wall.
6. The method as recited in claim 1, wherein the barrier comprises at least one of a board, a plate, and a panel.
7. The method as recited in claim 1, wherein positioning the barrier over the hole comprises mounting the barrier to the concrete surface.
8. The method as recited in claim 7, wherein mounting the barrier to the concrete surface comprises mounting the barrier to the surface with a plurality of mechanical fasteners.
9. The method as recited in claim 1, wherein the uncovered portion of the hole is positioned adjacent a top of the hole.
10. The method as recited in claim 1, wherein pouring cement slurry into the open top of the hopper is practiced with a plurality of pours.
11. The method as recited in claim 1, wherein the hopper further comprises a slanted bottom sized and shaped to convey the cement slurry to the cavity.
12. The method as recited in claim 11, wherein the slanted bottom comprises a slant angle θ from 30 degrees to 60 degrees.
13. The method as recited in claim 1, wherein the sides of the hopper comprise opposing sidewalls comprising a slant angle α from 30 degrees to 60 degrees.
14. The method as recited in claim 1, wherein the cement slurry comprises a class D concrete slurry.
15. The method as recited in claim 1, wherein the concrete surface comprises one of a vertical surface and a non-vertical surface.
16. The method as recited in claim 15, wherein the non-vertical concrete surface comprises a plane making an angle from plus 45 degrees to minus 45 degrees from vertical.
17. The method as recited in claim 1, wherein pouring the cement slurry into the open top of the hopper comprises pouring the cement slurry with the aid of at least one of gravity and pressure.
18. The method as recited in claim 1, wherein the method further comprises, after removing the hopper and barrier from the concrete surface, finishing the concrete surface.
19. The method as recited in claim 18, wherein finishing the concrete surface comprises at least one of filling unfilled voids in the concrete surface with cement slurry and removing excess at least partially hardened cement slurry from the concrete surface.
20. The method as recited in claim 1, wherein pouring the cement slurry into the open top of the hopper comprises introducing the slurry to the open top of the hopper with a cement slurry funnel.
The text of each claim as printed, for pasting a claim word for word. The links in the tree view name the same claims and elements.
Status
active
As of 2026-11-03, the USPTO record for US 12516533 shows no unresolved maintenance-fee lapse, and the term end computed from the dates in that record is 2044-05-29 (20 years from filing, plus 170 days of patent term adjustment), a date not yet passed (data version 20261110.1).
- Basis
- term_20y · pta_days:170 (20 years from filing, plus 170 days of patent term adjustment)
- Term end
- 2044-05-29 Computed from the dates in the USPTO record
- Fee lapse
- none on record
- Reinstatement
- none on record; reinstatement_possible: false, not lapsed
- As of
- 2026-11-03
- Data version
- 20261110.1
A fact about the record with its basis and its as-of date, not legal advice.
Citations
References cited on the grant: 22 US patent documents · Cited by: 0 US patents in this data · Lists through the API: /api/v1/patent/us_patent_citation/12516533/ (needs a free key, as the links under Get this as data)
Family outside the US
Google Patents Public Datasets lists no publication outside the US in this patent's family (read 2026-10-15).
This patent's family on USPTO Global Dossier
Family data from Google Patents Public Datasets, used under CC BY 4.0.
Record JSON
{
"patent_id": "12516533",
"status": "active",
"basis": [
"term_20y",
"pta_days:170"
],
"reinstatement_possible": false,
"reinstatement_basis": "not lapsed",
"expiry_date_estimated": "2044-05-29",
"lapse_date": null,
"reinstated_date": null,
"as_of": "2026-11-03",
"data_version": "20261110.1",
"catalog_data_version": "20261110.1",
"permalink": "https://patentref.io/p/12516533?v=20261110.1",
"next_steps": [
{
"kind": "record",
"url": "https://patentref.io/p/12516533?v=20261110.1",
"audience": "human"
},
{
"kind": "patent",
"url": "https://patentref.io/api/v1/patent/12516533/",
"audience": "agent"
},
{
"kind": "fee_events",
"tool": "uspto_patent_center",
"url": "https://patentcenter.uspto.gov/applications?patentNumber=12516533",
"audience": "agent"
}
]
}
Get this as data
- Full record
/api/v1/patent/12516533/ - Status record
/api/v1/lapse/status/12516533/ - Claim tree
/api/v1/structure/claims/12516533/ - Brief
/api/v1/structure/brief/12516533/
These four links need a free key (1,000 requests a month). Opened in a browser, which sends no key, they answer 403. Get a free key on the sign-up page, then send it in the X-Api-Key header. To see the shape of an answer without a key, open Try it.